Comment by:

Katahira & Engineers International Package Chainage: CH 0+720 - CH 0+804 Reply by: Sheet
MG Through PK-A
Comment Management Sheet A Structure: Ramp C Abutment A1 KEI Geotech 1
Consortium

Contractor's follow-up KEI's follow-up


Engineer’s original comment KEI's reply to the original comment
No Comment reply
Date: October 17th 2018 (4900) Date: November 07th 2018
Date: : Date:

1 Checked & correct

Footing height is reduced from 1500mm to 1300mm as per the


2 Footing dimension to be confirmed with detail design design.
Revised accordingly

Mitigation of reinforcement congestion near corners due to the


3 Recheck the orientation of the abutment base and provide justification for approval
skewness of abutment stem is considered for the base orientation

As per the design dowels are not required. Hence nominal dowels
4 No. of dowels provided to be checked with detail design
are provided.

5 Abutment base to be resisted on firm rock with the consent of engineer at site Agreed as noted

6 Footing details to be confirmed with the detail design Footing detail should be read with the concrete outline drawing

End of Comment