Katahira & Engineers International Package Chainage: CH 0+720 - CH 0+804 Reply by: Sheet
MG Through PK-A
Comment Management Sheet A Structure: Ramp C Abutment A1 KEI Geotech 1
Consortium
As per the design dowels are not required. Hence nominal dowels
4 No. of dowels provided to be checked with detail design
are provided.
5 Abutment base to be resisted on firm rock with the consent of engineer at site Agreed as noted
6 Footing details to be confirmed with the detail design Footing detail should be read with the concrete outline drawing
End of Comment