Comment Management Sheet A Structure: Ramp C Abutment A1 KEI Geotech 1
Consortium

Contractor's follow-up KEI's follow-up


Engineer’s original comment KEI's reply to the original comment
No Comment reply
Date: October 26th 2018 (5012) Date: November 12th 2018
Date: : Date:
Bore hole data not provided
1 Attached
Provide core box photos

Revised by adding additional T12 @ 300. Please refer the attached


2 Check additional logitudinal bar requirement for the wingwall horizontal shear
addendum

3 Check the arrangement of shear hooks in the wingwall, considering the construction Shear hooks arrangement is similar to the previous abutments

Provide vertical bending & shear calculation for the wingwall triangular area & check Revised accordingly. Please refer the attached addendum
4
for optimization
Detail section of the proposed protection has been provided in the
5 Hydrology- Detail section for the proposed protection to be given general arrangement drawings.
Dwg. No. CEP-2_PK-A_0+720_MIC-RAM-C_GA _005_R02

6 Base to be resisted on firm rock with the consent of Engineer at site Agreed as noted

7 Check & correct

8 Check & correct

9 Checked, detail is comply with the bearing pad design


Comment by:
Katahira & Engineers International Package Chainage: CH 0+720 - CH 0+804 Reply by: Sheet
MG Through PK-A
Comment Management Sheet A Structure: Ramp C Abutment A1 KEI Geotech 2
Consortium

Contractor's follow-up KEI's follow-up


Engineer’s original comment KEI's reply to the original comment
No Comment reply
Date: October 26th 2018 (5012) Date: November 12th 2018
Date: : Date:

Center coordinate is already provided, Offset measurements &


10
dimensions of plinth are easier than the corner coordinates

11 Check & correct

12 Revised accordingly

13 Revised accordingly

Provision of utility ducts nedd to be checked with duct drawing


Comment by:
Katahira & Engineers International Package Chainage: CH 0+720 - CH 0+804 Reply by: Sheet
MG Through PK-A
Comment Management Sheet A Structure: Ramp C Abutment A1 KEI Geotech 3
Consortium

Contractor's follow-up KEI's follow-up


Engineer’s original comment KEI's reply to the original comment
No Comment reply
Date: October 26th 2018 (5012) Date: November 12th 2018
Date: : Date:

14 Noted

15 Revised accordingly

16 Revised accordingly

Dimensions are correct

Typical design report for the parapet on wingwalls was already


17 submitted. ( Report No. : CEP-2/PK-A/ST/BR/TYP/001/R00)

Provision for utility ducts are comply with the Employers


requirements