Katahira & Engineers International Package Chainage: CH 0+720 - CH 0+804 Reply by: Sheet
MG Through PK-A
Comment Management Sheet A Structure: Ramp C Abutment A1 KEI Geotech 1
Consortium
3 Check the arrangement of shear hooks in the wingwall, considering the construction Shear hooks arrangement is similar to the previous abutments
Provide vertical bending & shear calculation for the wingwall triangular area & check Revised accordingly. Please refer the attached addendum
4
for optimization
Detail section of the proposed protection has been provided in the
5 Hydrology- Detail section for the proposed protection to be given general arrangement drawings.
Dwg. No. CEP-2_PK-A_0+720_MIC-RAM-C_GA _005_R02
6 Base to be resisted on firm rock with the consent of Engineer at site Agreed as noted
12 Revised accordingly
13 Revised accordingly
14 Noted
15 Revised accordingly
16 Revised accordingly