Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SRP 

Inspection Log
Location:  Rosemont at Oak Valley Room:
2021-2545
Date:  _______   Job _________________________________ Technician:  ___________________________________________
Material:  Material:  Material:  Material:  Material:  Material: 
Flir #:  Flir #:  Flir #:  Flir #:  Flir #:  Flir #: 
Date M.C. h Date M.C. h Date M.C. h Date M.C. h Date M.C. h Date M.C. h

Material:  Material: 
Flir #:  Flir #: 
Date M.C. h Date M.C. h

Material:  Material: 
Flir #:  Flir #: 
Date M.C. h Date M.C. h

Material:  Material: 
Flir #:  Flir #: 
Date M.C. h Date M.C. h

Material:  Material: 
Flir #:  Flir #: 
Date M.C. h Date M.C. h

Material:  Material: 
Flir #:  Flir #: 
Date M.C. h Date M.C. h

Material:  Material:  Material:  Material:  Material:  Material: 


Flir #:  Flir #:  Flir #:  Flir #:  Flir #:  Flir #: 
Date M.C. h Date M.C. h Date M.C. h Date M.C. h Date M.C. h Date M.C. h

Diagram Labeling Materials Key Dry Standard


Walls = X Drywall = DW Concrete = Con DW =    Con =    
Ceiling = C Plaster = PL Cinder Block = CMU PL =  CMU =     
Flooring = F Carpet = Carp Wood = W Carp =      W = 
EIFS = EF Other =      EF =  Other = 
YELLOW = Remove Ceiling   [  ]  Drywall      [  ]  Ceiling Tiles
PURPLE = Remove Wall Floor to Ceiling
BLUE = Remove Wall Floor to 4 ft
GREEN = Remove Wall Floor to 2 ft
ORANGE = Remove Wall 4 ft from Ceiling
PINK = Dry In Place
©Copyright 2020, SRP Environmental All Rights Reserved

You might also like