Structural Calculation

Windsor Project – ACP Reinforcement


Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Table of Contents
1. INTRODUCTION ......................................................................................................................................................... 4

2. DESIGN CRITERIA....................................................................................................................................................... 4

Load combinations ............................................................................................................................................ 4

Service combinations: SLS ................................................................................................................................. 4

Ultimate combinations: ULS ............................................................................................................................. 4

3. SOFTWARES .............................................................................................................................................................. 4

4. ACP verification ......................................................................................................................................................... 5

Dimensions........................................................................................................................................................ 5

Loads definition................................................................................................................................................. 5

Dead Loads ................................................................................................................................................ 5


Case 1: Wind Load ..................................................................................................................................... 5
Case 2: Nodal Maintenance Load.............................................................................................................. 6
Case 3: Wind Load as requested by the consultant ................................................................................ 12
Case 4: Nodal Maintenance Load as requested by the consultant......................................................... 13
Deflection ........................................................................................................................................................ 18

Case 1: Wind Load ................................................................................................................................... 18


Case 2: Maintenance Load ...................................................................................................................... 19
Case 3: Wind Load as requested by the consultant ................................................................................ 24
Case 4: Maintenance Load as requested by the consultant ................................................................... 25
Stress ............................................................................................................................................................... 30

Case 1: Under 1.35 Dead Load + 1.5 Wind Load ..................................................................................... 30


Case 2: Under 1.35 Dead Load + 1.5 Maintenance Load ........................................................................ 31
Case 3: Under 1.35 Dead Load + 1.5 Wind Load as requested by the consultant .................................. 36
Case 4: Under 1.35 Dead Load + 1.5 Maintenance Load as requested by the consultant ..................... 37
Conclusion ....................................................................................................................................................... 41

Case 1: Wind Load ................................................................................................................................... 41


Case 2: Maintenance Load ...................................................................................................................... 41
Case 3: Wind Load as requested by the consultant ................................................................................ 41
Case 4: Maintenance Load as requested by the consultant ................................................................... 42

2
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Results ..................................................................................................................................................... 42

3
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

1. INTRODUCTION

The objective of this report is to propose the reinforcement needed for the ACP depending on different load
cases. Two critical ACP Panels are considered and verification is done in two different cases, one where the
ACP is under Wind Load and one where Nodal maintenance loads are considered on several locations of the
ACP.

2. DESIGN CRITERIA

According to design parameters section 4.4, the following Combinations should be considered:

Load combinations

Service combinations: SLS

- 1.0 Dead loads + 1.0 Wind load


- 1.0 Dead loads + 1.0 Maintenance Load

Ultimate combinations: ULS

- 1.35 Dead loads + 1.5 Wind load


- 1.35 Dead loads + 1.5 Maintenance Load

3. SOFTWARES

The software’s used are:

- Autodesk Robot Structural Analysis Professional 2014

4
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

4. ACP VERIFICATION

Dimensions

The dimensions of the ACP are equal to 1200x3740mm.

Thickness = 4mm.

Loads definition

Dead Loads

The self-weight of the aluminum ACP is calculated automatically by the software according to the mechanical
properties and dimensions of each component.

Case 1: Wind Load

According to Design parameters section 4.3.2, Referencing the specifications 6801- Windsor Project, Section 4-
External Glazing and Cladding Performance Specification-rev D, Wind Load is equal to 2250Pa

5
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 2: Nodal Maintenance Load

According to design parameters, a Nodal load of 1000N is applied on a square area of area of edge 100mm on
the ACP, several load cases are considered:

1000/ (0.1x0.1) = 100000Pa

6
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 1

7
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 2

8
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 3

9
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 4

10
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 5

11
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 3: Wind Load as requested by the consultant

12
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 4: Nodal Maintenance Load as requested by the consultant

Load Case 1

13
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 2

14
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 3

15
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 4

16
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 5

17
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Deflection

Case 1: Wind Load

18
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 2: Maintenance Load

Load Case 1

19
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 2

20
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 3

21
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 4

22
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 5

23
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 3: Wind Load as requested by the consultant

Deflection
is more
than the
allowable,
NOT SAFE

24
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 4: Maintenance Load as requested by the consultant

Load Case 1

25
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 2

26
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 3

27
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 4

28
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 5

29
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Stress

Case 1: Under 1.35 Dead Load + 1.5 Wind Load

30
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 2: Under 1.35 Dead Load + 1.5 Maintenance Load

Load Case 1

31
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 2

32
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 3

33
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 4

34
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 5

35
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 3: Under 1.35 Dead Load + 1.5 Wind Load as requested by the consultant

Stress is
more than
the
allowable,
NOT SAFE

36
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 4: Under 1.35 Dead Load + 1.5 Maintenance Load as requested by the consultant

Load Case 1

Stress is
more than
the
allowable,
NOT SAFE

37
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 2

38
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 3

39
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 4

40
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Load Case 5

Stress is
more than
the
allowable,
NOT SAFE

Conclusion

Case 1: Wind Load

Max. Deflection is equal to 12.7mm < Allowable deflection 1200/90 = 13.3mm

Max Stress is equal to: 97.77MPa < Allowable Stress for ACP = 120/1.1 = 109MPa

Case 2: Maintenance Load

Max. Deflection is equal to 2.4mm < Allowable deflection 1200/90 = 13.3mm

Max Stress is equal to: 84.81MPa < Allowable Stress for ACP = 120/1.1 = 109MPa

Case 3: Wind Load as requested by the consultant

Max. Deflection is equal to 23.3mm > Allowable deflection 1200/90 = 13.3mm

Max Stress is equal to: 176.84MPa > Allowable Stress for ACP = 120/1.1 = 109MPa
41
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Case 4: Maintenance Load as requested by the consultant

Max. Deflection is equal to 7.4mm < Allowable deflection 1200/90 = 13.3mm

Max Stress is equal to: 148.08MPa > Allowable Stress for ACP = 120/1.1 = 109MPa

Results

Aluminum Tubes 40x20x2mm

Quantity: 5

Reinforcement needed for ACP under Wind Load

Aluminum Tubes 40x20x2mm

Quantity: 17

Reinforcement needed for ACP under Static Nodal Maintenance Load (1000 N)

42
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Aluminum Tubes 38x38x2mm

Quantity: 3

Reinforcement needed for ACP under Wind Load according to the consultant

Aluminum Tubes 38x38x2mm

Quantity: 6

Reinforcement needed for ACP under Static Nodal Maintenance Load (1000 N) according to the
consultant

43
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT

Results as per verification done by Glassline


Under Wind Load Under Static Nodal Maintenance Load
Five Reinforcements are
ACP 4mm thick Reinforcement is needed every 20 cm (17
needed (Aluminum Tube
(1200x3740mm) Aluminum Tubes 40x20x2mm)
40x20x2mm)

12.7mm < 1200/90 = 13.3mm


Deflection 2.4mm < 1200/90 = 13.3mm

97.77MPa < 120/1.1 =


Stress 109MPa 84.81MPa < 120/1.1 = 109MPa

SAFE
Status SAFE

Results as per consultant request


Under Wind Load Under Static Nodal Maintenance Load

ACP 4mm thick Three Reinforcements Six Reinforcements (Aluminum Tube


(1200x3740mm) (Aluminum Tube 38x38x2mm) 38x38x2mm)

23.3mm > 1200/90 = 13.3mm


Deflection 7.4mm < 1200/90 = 13.3mm

176.84MPa > 120/1.1 =


Stress 109MPa 148.08MPa > 120/1.1 = 109MPa

NOT SAFE
Status NOT SAFE

44