Windsor Project - ACP Reinforcement
Windsor Project - ACP Reinforcement
Table of Contents
1. INTRODUCTION ......................................................................................................................................................... 4
2. DESIGN CRITERIA....................................................................................................................................................... 4
3. SOFTWARES .............................................................................................................................................................. 4
Dimensions........................................................................................................................................................ 5
Loads definition................................................................................................................................................. 5
2
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Results ..................................................................................................................................................... 42
3
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
1. INTRODUCTION
The objective of this report is to propose the reinforcement needed for the ACP depending on different load
cases. Two critical ACP Panels are considered and verification is done in two different cases, one where the
ACP is under Wind Load and one where Nodal maintenance loads are considered on several locations of the
ACP.
2. DESIGN CRITERIA
According to design parameters section 4.4, the following Combinations should be considered:
Load combinations
3. SOFTWARES
4
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
4. ACP VERIFICATION
Dimensions
Thickness = 4mm.
Loads definition
Dead Loads
The self-weight of the aluminum ACP is calculated automatically by the software according to the mechanical
properties and dimensions of each component.
According to Design parameters section 4.3.2, Referencing the specifications 6801- Windsor Project, Section 4-
External Glazing and Cladding Performance Specification-rev D, Wind Load is equal to 2250Pa
5
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
According to design parameters, a Nodal load of 1000N is applied on a square area of area of edge 100mm on
the ACP, several load cases are considered:
6
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 1
7
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 2
8
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 3
9
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 4
10
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 5
11
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
12
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 1
13
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 2
14
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 3
15
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 4
16
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 5
17
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Deflection
18
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 1
19
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 2
20
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 3
21
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 4
22
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 5
23
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Deflection
is more
than the
allowable,
NOT SAFE
24
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 1
25
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 2
26
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 3
27
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 4
28
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 5
29
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Stress
30
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 1
31
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 2
32
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 3
33
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 4
34
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 5
35
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Case 3: Under 1.35 Dead Load + 1.5 Wind Load as requested by the consultant
Stress is
more than
the
allowable,
NOT SAFE
36
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Case 4: Under 1.35 Dead Load + 1.5 Maintenance Load as requested by the consultant
Load Case 1
Stress is
more than
the
allowable,
NOT SAFE
37
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 2
38
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 3
39
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 4
40
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Load Case 5
Stress is
more than
the
allowable,
NOT SAFE
Conclusion
Max Stress is equal to: 97.77MPa < Allowable Stress for ACP = 120/1.1 = 109MPa
Max Stress is equal to: 84.81MPa < Allowable Stress for ACP = 120/1.1 = 109MPa
Max Stress is equal to: 176.84MPa > Allowable Stress for ACP = 120/1.1 = 109MPa
41
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Max Stress is equal to: 148.08MPa > Allowable Stress for ACP = 120/1.1 = 109MPa
Results
Quantity: 5
Quantity: 17
Reinforcement needed for ACP under Static Nodal Maintenance Load (1000 N)
42
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
Quantity: 3
Reinforcement needed for ACP under Wind Load according to the consultant
Quantity: 6
Reinforcement needed for ACP under Static Nodal Maintenance Load (1000 N) according to the
consultant
43
Structural Calculation
WINDSOR PROJECT – ACP
08 December 2021 REINFORCEMENT
SAFE
Status SAFE
NOT SAFE
Status NOT SAFE
44