Design of RCC Building

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 94

ANALYSIS AND DESIGN OF MULTI-STORIED

SHOPPING MALL CUM MULTIPLEX CINEMA HALL

Bachelor of Technology Project (8th Semester)

Submitted in the partial fulfillment of the requirements for the award of the
Degree of Bachelor of Technology in Civil Engineering

Submitted by
Prachuryya Kaushik (11-1-1-019)

Rishiraj Bharadwaj (11-1-1-057)

Sugata Siddhartha Goswami (11-1-1-58)

Soumyadeep Deb (11-1-1-018)

Under the supervision of


Dr M.L.V. Prasad, Assistant Professor

DEPARTMENT OF CIVIL ENGINEERING


NATIONAL INSTITUTE OF TECHNOLOGY
May 2015
ANALYSIS AND DESIGN OF MULTI-STORIED
SHOPPING MALL CUM MULTIPLEX CINEMA HALL

Bachelor of Technology Project (8th Semester)

Submitted by
Prachuryya Kaushik (11-1-1-019)

Rishiraj Bharadwaj (11-1-1-057)

Sugata Siddhartha Goswami (11-1-1-058)

Soumyadeep Deb (11-1-1-018)

DEPARTMENT OF CIVIL ENGINEERING


NATIONAL INSTITUTE OF TECHNOLOGY
May 2015
CERTIFICATE

This is to certify that the project work entitled “Analysis and Design of Multi-Storeyed
Shopping Mall cum Multiplex Cinema Hall” submitted for the partial fulfilment of the award
of the degree of Bachelor of Technology in Civil Engineering under the Department of Civil
Engineering, NIT Silchar, has been carried out by the undersigned students of 8th Semester
B.Tech., under the supervision of Dr. M.L.V. Prashad.

Prachuryya Kaushik (11-1-1-019)

Rishiraj Bharadwaj (11-1-1-057)

Sugata Siddhartha Goswami (11-1-1-058)

Soumyadeep Deb (11-1-1-018)

Certified that the above work has been carried under my supervision

Dr. M.L.V. Prashad Prof. A. I. Laskar

Associate Professor Head of the Department

Department of CIVIL Engineering Department of CIVIL Engineering


ACKNOWLEDGEMENT

We deem it to be solemn duty on our parts to express our deep sense of gratitude to
the faculty members of the Civil Engineering Department for providing us to look into
every nook and cranny of Building Design.

We owe our special debt of gratitude to our guide Dr. MLV Prasad for his guidance
and sustained inspiration in completing the project. We are grateful to Mr. Ruhul Amin
Mazumder for his valuable guidance. We are greatly indebted to Prof. A. I. Laskar, the
Head of the Department of Civil Engineering Department, who encouraged us in pursuing
the study in all phases.

We sincerely acknowledge the help extended by the faculty members and friends for
extending support and encouragement to take up and timely completion of the project.

(Prachuryya Kaushik)

(Rishiraj Bharadwaj)

(Sugata Siddhartha Goswami)

(Soumyadeep Deb)
CONTENTS

EXECUTIVE SUMMARY 1

INTRODUCTION 2

BUILDING PLAN 7

BEAM COLUMN LAYOUT 10

3 DIMENSIONAL VIEW 11

PRELIMINARY DESIGN DATA 12

SLAB DESIGN 13

LOAD DISTRIBUTION 21

MOMENT DISTRIBUTION 25

CALCULATION OF SAGGING MOMENTS 31

SEISMIC ANALYSIS 34

LOAD COMBINATIONS 42

BEAM DESIGN 44

COLUMN DESIGN 53

FOOTING DESIGN 59

STAIRCASE DESIGN 62

STAAD PRO DESIGN 66

CONCLUSION 82

REFERENCE 83
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 1

Executive Summary

The objective of this project is to plan, analyze and design a five-storied Shopping
Mall cum Multiplex Cinema Hall. All the necessary assumptions are made, and then the load
calculation is done to find out the load on beams, columns and footings. The frame is
analyzed using Moment Distribution method. For Earthquake analysis, the method adopted
here is the approximate method (Portal Method). By combination of moments, the final
moments that are acting on the beams and columns are found out. The design of various
components such as slabs, beams, columns, staircases etc. is done by Limit state Method of
Design. The detailing finally shows the schematic diagrams for the placement of
reinforcement in the various components.

IS Codes and Aids are used as per requirement. IS 456:2000 for Reinforced Concrete
Design, IS 1893:2002 for Earthquake Load Analysis, IS 875:1987 for Load details, SP
16:1980 for Steel requirements and IS 13920:1993 for Ductile detailing is used.

Finally the manual analysis and design is compared with the result obtained from
STAAD Pro. The detailing of the structural elements are done using AutoCAD.

Keywords: Structural Design, Earthquake Resistant Structure, Moment Distribution Method,


Limit State Method of Design, STAAD Pro

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 2

INTRODUCTION

The population explosion and advent of industrial revolution led to the exodus of
people from villages to urban areas. This urbanisation led to a new problem– less space for
housing, work and more people. Because of the demand for land, the land costs got
skyrocketed. So under the changed circumstances, the vertical growth of buildings i.e.
constructions of multi-storeyed buildings has become inevitable both for residential and as
well as office purposes. With the rise in the standard of living, the demand for multi-
storeyed shopping malls has increased as all the facilities under a single roof are desired by
all. Moreover cinema halls are also provided in malls for entertainment purposes.

For multi-storeyed buildings, the conventional load bearing structures become


uneconomical as they require larger sections to resist huge moments and loads. But in a
framed structure, the building frame consists of a network of beams and columns which are
built monolithically and rigidly with each other at their joints. Because of this rigidity at the
joints, there will be reduction in moments and also the structure tends to distribute the loads
more uniformly and eliminate the excessive effects of localised loads. Therefore in non-load
bearing framed structures, the moments and forces become less which in turn reduces the
sections of the members. As the walls don’t take any load, they are also of thinner
dimensions. So, the lighter structural components and walls reduce the self weight of the
whole structure which necessitates a cheaper foundation. Also, the lighter walls which can
be easily shifted provide flexibility in space utilisation. In addition to the above mentioned
advantages the framed structure is more effective in resisting wind loads and earthquake
loads.

Work done in this project:

A plot of 900 m2 has been selected for the construction of a multi-storeyed shopping
mall cum multiplex cinema hall building. In the building the functions will be different
and it plays a major role because of different loads acts on different slabs. Therefore
according to IS 875, the loads are calculated. The frame analysis and design is done as per
guidelines of code IS 456 : 2000, SP 16:1980, IS 13920:1993 and IS 1893:2002.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 3

Design concept:
There are three design philosophies to design are in reinforced concrete structures. These
are:
1. Working stress method
2. Ultimate load method
3. Limit state method.
In the ‘working stress’ method it is seen that the permissible stresses for concrete and
steel are not exceeded anywhere in the structure when it is subjected to the worst
combination of working loads. A linear variation of stress form zero at the neutral axis to the
maximum stress at the extreme fibre is assumed.
Practically, the stress strain curve for concrete is not linear as it was assumed in
working stress method. So, in ‘ultimate load’ design an idealised form of actual stress strain
diagram is used and the working loads are increased by multiplying them with the load
factors.
The basis for ‘limit state’ method is a structure with appropriate degrees of reliability
should be able to withstand safely all loads that are liable to act on it throughout its life and it
should also satisfy the serviceability requirements such as limitations on deflection and
cracking.
Limit state method is the most rational method of the three methods. It considers the
actual behaviour of the materials at failure and also it takes serviceability also into
consideration. Therefore, limit state method has been employed in this work.

Methods used for Analysis of the structure:


1. Portal Frame Method
2. Moment Distribution Method
Portal Frame Method:

Assumptions:
1. Moment Resistant joints.
2. Lateral Load

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 4

3. No gravity load
4. Lateral forces resisted by frame action.
5. Inflection points at mid height of columns
6. Inflection points at mid span of beams.
7. Overturn is resisted by external columns.
Moment Distribution Method:

The method only accounts for flexural effects and ignores axial and shear effects. In order to
apply the moment distribution method to analyse a structure, the following things must be considered.

Fixed end moment

Fixed end moments are the moments produced at member ends by external loads when the
joints are fixed.

Flexural stiffness

The flexural stiffness (EI/L) of a member is represented as the product of the modulus of
elasticity (E) and the second moment of area (I) divided by the length (L) of the member. What is
needed in the moment distribution method is not the exact value but the ratio of flexural stiffness of
all members.

Distribution factors

When a joint is released and begins to rotate under the unbalanced moment, resisting forces
develop at each member framed together at the joint. Although the total resistance is equal to the
unbalanced moment, the magnitudes of resisting forces developed at each member differ by the
members' flexural stiffness. Distribution factors can be defined as the proportions of the unbalanced
moments carried by each of the members. In mathematical terms, distribution factor of member

framed at joint is given as:

where n is the number of members framed at the joint.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 5

Carryover factors

When a joint is released, balancing moment occurs to counterbalance the unbalanced moment
which is initially the same as the fixed-end moment. This balancing moment is then carried over to
the member's other end. The ratio of the carried-over moment at the other end to the fixed-end
moment of the initial end is the carryover factor.

Determination of carryover factors

Let one end (end A) of a fixed beam be released and applied a moment while the other
end (end B) remains fixed. This will cause end A to rotate through an angle . Once the magnitude
of developed at end B is found, the carryover factor of this member is given as the ratio of
over :

In case of a beam of length L with constant cross-section whose flexural rigidity is ,

therefore the carryover factor

Sign convention

Once a sign convention has been chosen, it has to be maintained for the whole structure. The
traditional engineer's sign convention is not used in the calculations of the moment distribution
method although the results can be expressed in the conventional way. In the BMD case, the left side
moment is clockwise direction and other is anticlockwise direction so the bending is positive and is
called sagging.

Brief Description of IS Codes used:

IS 1893:2002 : This standard deals with assessment of seismic loads on various structures
and earthquake resistant design of buildings. Its basic provisions are applicable to buildings;
elevated structures; industrial and stack like structures; bridges; concrete masonry and earth
dams; embankments and retaining walls and other structures.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 6

IS 456:2000 : This standard deals with the general structural use of plain and reinforced
concrete. For the purpose of this standard, plain concrete structures are those where
reinforcement, if provided is ignored for determination of strength of the structure.

Special requirements of structures, such as shells, folded plates, arches, bridges,


chimneys, blast resistant structures and earthquake resistant structures, covered in respective
standards have not been covered in this standard; these standards shall be used in conjunction
with this standard.

IS 875:1987 : This Indian Standard was adopted by the bureau of Indian Standards on 30 Oct
1987,after the draft finalized by the Structural Safety Sectional Committee had been
approved by the Civil engineering Division Council. This Indian Standard Code of Practice
was first published in 1957 for the guidance of civil engineers, designers and architects
associated with planning and design of buildings.

SP-16:1980 : It has three sets of design charts for rectangular and circular types of cross-
sections of columns. The three sets are as follows: (i) The first set of twelve charts for
rectangular columns having symmetrical longitudinal steel bars in two rows for three grades
of steel (ii) The second set of twelve charts for rectangular columns having symmetrical
longitudinal steel bars (twenty numbers) distributed equally on four sides (in six rows,
Fig.10.25.2) for three grades of steel (Fe 250, Fe 415 and Fe 500) and each of them has four
values of d’/D ratios (0.05, 0.10, 0.15 and 0.20) (iii) The third set of twelve charts are for
circular columns having eight longitudinal steel bars of equal diameter and uniformly spaced
circumferentially for three grades of steel and each of them has four values of d’/D ratios
(0.05, 0.10, 0.15 and 0.20). All the thirty-six charts are prepared for M 20 grade of concrete
only. This is a justified approximation as it is not worthwhile to have separate design charts.

IS 13920:1993 : This standard covers the requirements for designing and detailing of
monolithic reinforced concrete buildings so as to give them adequate toughness and ductility
to resist severe earthquake shocks without collapse. The provisions for reinforced concrete
construction given here apply specifically to monolithic reinforced concrete construction.

Precast and/or prestressed concrete members may be used only if they can provide the
same level of ductility as that of a monolithic reinforced concrete construction during or after
an earthquake.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 7

BUILDING PLAN
(Ground Floor)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 8

BUILDING PLAN
(Top floor)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 9

BEAM COLUMN LAYOUT


(At Bottom Floor)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 10

BEAM COLUMN LAYOUT


(Individual Block)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 11

3 Dimensional Views

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 12

PRELIMINARY DESIGN DATA

The preliminary design data that we have used in designing the structure has been
summarized below:

Type of structure: 5 storied RCC rigid jointed frame (G+4)

Dimension of walls: 250 mm thick external walls including plaster 125 mm thick internal
walls including plaster

Earthquake analysis: Equivalent static method as per IS 1893-2002

Ductile detailing: As per IS 13920

No. of floors: G+4

Type of soil: Medium soft clay Unit

Weight of soil: 18 kN/m3

Seismic zone: 5

Material Properties

Grade of concrete: M25 (for slabs, beams and columns)& M30 (foundation)

Type of steel: HYSD of Grade Fe415 confirming to IS 1786

Geometric Properties

Dimensions of wall: 250mm thick outer wall and 125 mm thick inner wall including plaster

Height of each floor: 3.6 m

Depth of slab: 150mm (for floor) & 150 mm (for roof) [As per calculations]

Column size: 450mm x 450mm

Beam size: 300mm x 500mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 13

SLAB DESIGN

For the design of slabs, similar slabs are grouped based on dimension and end
conditions.

SLAB A

Ly = 5000 mm, Lx= 5000 mm;


Ly/Lx= 1, Therefore Two way slab

Leff = 5000 mm
Leff / Deff = 40 ……… [ IS 456-2000 Cl. 24.1 ]
Deff = d = 5000/40 = 125 mm
D = 125+5+20(cover) = 150 mm

Loads:
Dead Load : [ IS875 ]
Self weight of slab = .150 × 25 = 3.75 kN/m2
Live load
For commercial building = 4 kN/m2
Floor finish = 2 kN/m2
Factored load = 1.5×(3.75+4+2)=14.625≈15 kN/m2

Now, for BM coefficients:


Ly/Lx= 1 [ One edge discontinuous]
αx = 0.037 [ As per Table 26, IS 456:2000]
αy = 0.037

Mx = αxwlx2 My = αywlx2

Mx = 0.037×15×52 = 13.875 kN-m


My = 0.037×15×52 = 13.875 kN-m

So Mu = 13.875 kN-m

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 14

Now, 0.138 fckbd2 =13.875 × 106

d =63.42 mm < 125 mm. Hence Ok.

Steel Reinforcement:

Ast= 0.5 bdfck/fy [1 - (1 - 4.6Mu/fckbd2)0.5]

Calculating, Ast = 321.29 mm2

Numbers of 8 mm ᵠ bars = 321.39/((3.14/4) × 82) = 6.39 ≈ 7

Provide 8 mm ᵠ @ 140 c/c [No. of bars = 7 ] .... [ less than 3d=375mm or 300mm, so OK]

Distribution steel:

Ast=.12% of Ag= .12/100 ×150×1000=180 mm2


Spacing of 8 mm ᵠ bars @ 200 mm c/c [ No. of bars = 5]

Detailing of Slab A

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 15

SLAB B

Ly = 5000 mm, Lx= 5000 mm;


Ly/Lx= 1, Therefore Two way slab

Leff = 5000 mm
Leff / Deff = 40 ……… [ IS 456-2000 Cl. 24.1 ]
Deff = d = 5000/40 = 125 mm
D = 125+5+20(cover) = 150 mm

Loads:
Dead Load : [ IS875 ]
Self weight of slab = .150 × 25 = 3.75 kN/m2
Live load
For commercial building = 4 kN/m2
Floor finish = 2 kN/m2
Factored load = 1.5 × (3.75+4+2) = 14.625
≈ 15 kN/m2

Now, for BM coefficients:


Ly/Lx= 1 [ Internal Panel]
αx = 0.032 [ As per Table 26, IS 456:2000]
αy = 0.032

Mx = αxwlx2
My = αywlx2

Mx = 0.032×15×52 = 12 kN-m
My = 0.032×15×52 = 12 kN-m

So Mu = 12 kN-m

Now, 0.138 fckbd2 =12 × 106

d =58.98 mm < 125 mm. Hence Ok.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 16

Steel Reinforcement:

Ast= 0.5 bdfck/fy [1 - (1 - 4.6Mu/fckbd2)0.5]

Calculating, Ast = 276.15 mm2

Numbers of 8 mm ᵠ bars = 276.15/((3.14/4) × 82) = 5.43 ≈ 6

Provide 8 mm ᵠ @ 160 c/c [No. of bars = 6 ] .... [ less than 3d=375mm or 300mm, so OK]

Distribution steel:

Ast=.12% of Ag= .12/100 ×150×1000=180 mm2

Spacing of 8 mm ᵠ bars @ 200 mm c/c [ No. of bars = 5]

Detailing of Slab B

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 17

SLAB C

Ly = 5000 mm, Lx= 3000 mm;


Ly/Lx= 1.67, Therefore Two way slab

Leff = 3000 mm
Leff / Deff = 40 ……… [ IS 456-2000 Cl. 24.1 ]
Deff = d = 3000/40 = 75 mm ≈ 125 mm (let)
D = 125+5+20(cover) = 150 mm

Loads:
Dead Load : [ IS875 ]
Self weight of slab = .150 × 25 = 3.75 kN/m2
Live load
For commercial building = 4 kN/m2
Floor finish = 2 kN/m2
Factored load = 1.5×(3.75+4+2) = 14.62
≈ 15 kN/m2

Now, for BM coefficients:


Ly/Lx= 1.67 [ Two adjacent edges discontinuous]
αx = 0.079 αy = 0.047 [ As per Table 26, IS 456:2000]

Mx = αxwlx2
My = αywlx2

Mx = 0.079×15×32 = 10.67 kN-m


My = 0.047×15×32 = 6.345 kN-m

So Mu = 10.67 kN-m

Now, 0.138 fckbd2 =10.67 × 106

d =55.61 mm < 125 mm. Hence Ok.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 18

Steel Reinforcement:
Ast= 0.5 bdfck/fy [1 - (1 - 4.6Mu/fckbd2)0.5]

Calculating, Ast = 244.47 mm2

Numbers of 8 mm ᵠ bars = 244.47/((3.14/4) × 82) = 4.86 ≈ 5

Provide 8 mm ᵠ @ 200 c/c [No. of bars = 5] .... [ less than 3d=375mm or 300mm, so OK]

Distribution steel:
Ast=.12% of Ag= .12/100 ×150×1000=180 mm2
Spacing of 8 mm ᵠ bars @ 200 mm c/c [ No. of bars = 5]

Detailing of Slab C

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 19

SLAB D

Ly = 5000 mm, Lx= 1800 mm;


Ly/Lx= 2.78, Therefore One way slab

Leff = 1800 mm
Deff = 125 mm (let)
D = 125+5+20(cover) = 150 mm

Loads:
Dead Load : [ IS875 ]
Self weight of slab = .150 × 25 = 3.75 kN/m2
Live load
For commercial building = 4 kN/m2
Floor finish = 2 kN/m2
Factored load = 1.5×(3.75+4+2) = 14.62 ≈ 15 kN/m2

Moment and Shear:


Considering designing for per metre span, W=15 kN/m
So Mu = WL2/2 = 24.3 kN-m

Now, 0.138 fckbd2 =24.3 × 106 N-mm

d =83.925 mm < 125 mm. Hence Ok.

Steel Reinforcement:

Ast= 0.5 bdfck/fy [1 - (1 - 4.6Mu/fckbd2)0.5]

Calculating, Ast = 583.99 mm2

Alternately Provide 8 mm ᵠ @ 200 c/c [No. of bars = 5 ]

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 20

And Provide 10 mm ᵠ @ 200 c/c [No. of bars = 5 ] .... [ less than 3d=375mm or 300mm, so
OK]

Distribution steel:

Ast=.12% of Ag= .12/100 ×150×1000=180 mm2

Spacing of 8 mm ᵠ bars @ 200 mm c/c [ No. of bars = 5]

Detailing of Slab D

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 21

LOAD DISTRIBUTION

Beam no. Area Beam no. Area


A1B1 1.62 B1B2 12.01 Total Load (kN/m2)
B1C1 6.25 B2B3 12.01 Self Weight Slab 3.75
C1D1 6.25 B3B4 3.24 Floor Finish 2
D1E1 6.25 Live Load 4
D1E2 6.25 C1C2 12.5 Total 9.75
D1E3 2.25 C2C3 12.5
C3C4 3.24
A2B2 3.24
B2C2 12.5 D1D2 12.5
C2D2 12.5 D2D3 12.5
D2E2 12.5 D3D4 3.24
E2F2 12.5
F2G2 2.25 E1E2 12.5
E2E3 12.5
A3B3 3.24 E3E4 3.24
B3C3 12.01
C3D3 12.01 F1F2 11.5
D3E3 12.01 F2F3 6.25
E3F3 12.01 F3F4 3.195
F3G3 2.25
G1G2 5.25
G3G4 1.575

Area of slabs transferring loads to the Beams

Area of slabs transferring loads to the Beams

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 22

LOAD DISTRIBUTION

Areas of slabs transferring to each beam

Beam A1B1C1D1E1F1G1 Beam A2B2C2D2E2F2G2

Beam A3B3C3D3E3F3G3
Beam B1B2B3B4

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 23

LOAD DISTRIBUTION
Areas of slabs transferring to each beam

Beam C1C2C3C4 Beam D1D2D3D4

Beam E1E2E3E4
Beam F1F2F3F4

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 24

LOAD DISTRIBUTION
Uniformly distributed loads on each beam

DEAD Load on beams (kN/m) LIVE Load on beams (kN/m)


Beam no. Load Beam no. Load Beam no. Load Beam no. Load
A1B1 5.175 B1B2 13.8115 A1B1 3.6 B1B2 23.4195
B1C1 7.1875 B2B3 13.8115 B1C1 5 B2B3 23.4195
C1D1 7.1875 B3B4 10.35 C1D1 5 B3B4 7.2
D1E1 7.1875 D1E1 5
E1F1 7.1875 C1C2 14.375 E1F1 5 C1C2 10
F1G1 4.3125 C2C3 14.375 F1G1 3 C2C3 10
C3C4 10.35 C3C4 7.2
A2B2 10.35 A2B2 7.2
B2C2 14.375 D1D2 14.375 B2C2 10 D1D2 10
C2D2 14.375 D2D3 14.375 C2D2 10 D2D3 10
D2E2 14.375 D3D4 10.35 D2E2 10 D3D4 7.2
E2F2 14.375 E2F2 10
F2G2 4.3125 E1E2 14.375 F2G2 3 E1E2 10
E2E3 14.375 E2E3 10
A3B3 10.35 E3E4 10.35 A3B3 7.2 E3E4 7.2
B3C3 13.8115 B3C3 23.4195
C3D3 13.8115 F1F2 13.225 C3D3 23.4195 F1F2 9.2
D3E3 13.8115 F2F3 7.1875 D3E3 23.4195 F2F3 5
E3F3 13.8115 F3F4 10.20625 E3F3 23.4195 F3F4 7.1
F3G3 4.3125 F3G3 3
G1G2 6.0375 G1G2 4.2
G3G4 5.03125 G3G4 3.5

Department of Civil Engineering


National Institute of Technology, Silchar
Beam A1B1C1D1E1F1G1 Moments by Moment Distribution (due to DEAD Load)
Joint G2 F2 E2 D2 C2 B2
Member G2UP G2DN G2F2 F2G2 F2UP F2DN F2E2 E2F2 E2UP E2DN E2D2 D2E2 D2UP D2DN D2C2 C2D2 C2UP C2DN C2B2 B2C2 B2UP B2DN B2A2
I(x10^‐3) 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125
L 3.6 3.6 3 3 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 1.8
K(x4E) 0.868056 0.868056 1.041667 1.041667 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 1.736111
D.F. 0.3125 0.3125 0.375 0.306122 0.255102 0.255102 0.183673 0.209302 0.290698 0.290698 0.209302 0.209302 0.290698 0.290698 0.209302 0.209302 0.290698 0.290698 0.209302 0.264706 0.367647 0.367647 0
UDL 0 0 23.6875 23.6875 0 0 26.5625 26.5625 0 0 26.5625 26.5625 0 0 26.5625 26.5625 0 0 26.5625 26.5625 0 0 24.55
FEM 0 0 17.76563 ‐17.7656 0 0 55.33854 ‐55.3385 0 0 55.33854 ‐55.3385 0 0 55.33854 ‐55.3385 0 0 55.33854 ‐55.3385 0 0 6.6285
Release ‐5.55176 ‐5.55176 ‐6.66211 ‐11.5019 ‐9.58493 ‐9.58493 ‐6.90115 0 0 0 0 0 0 0 0 0 0 0 0 12.89383 17.9081 17.9081 0
Carry over 0 0 ‐5.75096 ‐3.33105 0 0 0 ‐3.45057 0 0 0 0 0 0 0 0 0 0 6.446917 0 0 0 0
Release 1.797174 1.797174 2.156609 1.019711 0.849759 0.849759 0.611826 0.722213 1.003074 1.003074 0.722213 0 0 0 0 ‐1.34935 ‐1.8741 ‐1.8741 ‐1.34935 0 0 0 0
Carry over 0 0 0.509855 1.078304 0 0 0.361107 0.305913 0 0 0 0.361107 0 0 ‐0.67468 0 0 0 0 ‐0.67468 0 0 0
Release ‐0.15933 ‐0.15933 ‐0.1912 ‐0.44064 ‐0.3672 ‐0.3672 ‐0.26438 ‐0.06403 ‐0.08893 ‐0.08893 ‐0.06403 0.065631 0.091154 0.091154 0.065631 0 0 0 0 0.178591 0.248043 0.248043 0
Carry over 0 0 ‐0.22032 ‐0.0956 0 0 ‐0.03201 ‐0.13219 0 0 0.032816 ‐0.03201 0 0 0 0.032816 0 0 0.089296 0 0 0 0
Release 0.068849 0.068849 0.082619 0.039065 0.032554 0.032554 0.023439 0.020799 0.028888 0.028888 0.020799 0.006701 0.009306 0.009306 0.006701 ‐0.02556 ‐0.0355 ‐0.0355 ‐0.02556 0 0 0 0
Carry over 0 0 0.019532 0.04131 0 0 0.0104 0.011719 0 0 0.00335 0.0104 0 0 ‐0.01278 0.00335 0 0 0 ‐0.01278 0 0 0
Release ‐0.0061 ‐0.0061 ‐0.00732 ‐0.01583 ‐0.01319 ‐0.01319 ‐0.0095 ‐0.00315 ‐0.00438 ‐0.00438 ‐0.00315 0.000498 0.000692 0.000692 0.000498 ‐0.0007 ‐0.00097 ‐0.00097 ‐0.0007 0.003383 0.004698 0.004698 0
Carry over 0 0 ‐0.00791 ‐0.00366 0 0 ‐0.00158 ‐0.00475 0 0 0.000249 ‐0.00158 0 0 ‐0.00035 0.000249 0 0 0.001691 ‐0.00035 0 0 0
Release 0.002473 0.002473 0.002968 0.001604 0.001337 0.001337 0.000962 0.000942 0.001308 0.001308 0.000942 0.000403 0.00056 0.00056 0.000403 ‐0.00041 ‐0.00056 ‐0.00056 ‐0.00041 9.28E‐05 0.000129 0.000129 0
Carry over 0 0 0.000802 0.001484 0 0 0.000471 0.000481 0 0 0.000202 0.000471 0 0 ‐0.0002 0.000202 0 0 4.64E‐05 ‐0.0002 0 0 0
Release ‐0.00025 ‐0.00025 ‐0.0003 ‐0.0006 ‐0.0005 ‐0.0005 ‐0.00036 ‐0.00014 ‐0.0002 ‐0.0002 ‐0.00014 ‐5.6E‐05 ‐7.8E‐05 ‐7.8E‐05 ‐5.6E‐05 ‐5.2E‐05 ‐7.2E‐05 ‐7.2E‐05 ‐5.2E‐05 5.38E‐05 7.47E‐05 7.47E‐05 0
Carry over 0 0 ‐0.0003 ‐0.00015 0 0 ‐7.1E‐05 ‐0.00018 0 0 ‐2.8E‐05 ‐7.1E‐05 0 0 ‐2.6E‐05 ‐2.8E‐05 0 0 2.69E‐05 ‐2.6E‐05 0 0 0

Total ‐3.84895 ‐3.84895 7.697592 ‐30.9736 ‐9.08216 ‐9.08216 49.1377 ‐57.9315 0.939763 0.939763 56.05176 ‐54.9271 0.101635 0.101635 54.72368 ‐56.678 ‐1.91121 ‐1.91121 60.50045 ‐42.9506 18.16105 18.16105 6.6285
Beam A1B1C1D1E1F1G1 Moments by Moment Distribution (due to LIVE Load)
Joint G2 F2 E2 D2 C2 B2
Member G2UP G2DN G2F2 F2G2 F2UP F2DN F2E2 E2F2 E2UP E2DN E2D2 D2E2 D2UP D2DN D2C2 C2D2 C2UP C2DN C2B2 B2C2 B2UP B2DN B2A2
I(x10^‐3) 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125
L 3.6 3.6 3 3 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 1.8
K(x4E) 0.868056 0.868056 1.041667 1.041667 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 1.736111
D.F. 0.3125 0.3125 0.375 0.306122 0.255102 0.255102 0.183673 0.209302 0.290698 0.290698 0.209302 0.209302 0.290698 0.290698 0.209302 0.209302 0.290698 0.290698 0.209302 0.264706 0.367647 0.367647 0
UDL 0 0 3 3 0 0 10 10 0 0 10 10 0 0 10 10 0 0 10 10 0 0 10
FEM 0 0 2.25 ‐2.25 0 0 20.83333 ‐20.8333 0 0 20.83333 ‐20.8333 0 0 20.83333 ‐20.8333 0 0 20.83333 ‐20.8333 0 0 2.7
Release ‐0.70313 ‐0.70313 ‐0.84375 ‐5.68878 ‐4.74065 ‐4.74065 ‐3.41327 0 0 0 0 0 0 0 0 0 0 0 0 4.8 6.666667 6.666667 0
Carry over 0 0 ‐2.84439 ‐0.42188 0 0 0 ‐1.70663 0 0 0 0 0 0 0 0 0 0 2.4 0 0 0 0
Release 0.888871 0.888871 1.066645 0.129145 0.107621 0.107621 0.077487 0.357202 0.496114 0.496114 0.357202 0 0 0 0 ‐0.50233 ‐0.69767 ‐0.69767 ‐0.50233 0 0 0 0
Carry over 0 0 0.064573 0.533323 0 0 0.178601 0.038744 0 0 0 0.178601 0 0 ‐0.25116 0 0 0 0 ‐0.25116 0 0 0
Release ‐0.02018 ‐0.02018 ‐0.02421 ‐0.21794 ‐0.18161 ‐0.18161 ‐0.13076 ‐0.00811 ‐0.01126 ‐0.01126 ‐0.00811 0.015187 0.021094 0.021094 0.015187 0 0 0 0 0.066484 0.092339 0.092339 0
Carry over 0 0 ‐0.10897 ‐0.01211 0 0 ‐0.00405 ‐0.06538 0 0 0.007594 ‐0.00405 0 0 0 0.007594 0 0 0.033242 0 0 0 0
Release 0.034052 0.034052 0.040863 0.004948 0.004123 0.004123 0.002969 0.012095 0.016799 0.016799 0.012095 0.000849 0.001179 0.001179 0.000849 ‐0.00855 ‐0.01187 ‐0.01187 ‐0.00855 0 0 0 0
Carry over 0 0 0.002474 0.020431 0 0 0.006047 0.001484 0 0 0.000424 0.006047 0 0 ‐0.00427 0.000424 0 0 0 ‐0.00427 0 0 0
Release ‐0.00077 ‐0.00077 ‐0.00093 ‐0.00811 ‐0.00675 ‐0.00675 ‐0.00486 ‐0.0004 ‐0.00055 ‐0.00055 ‐0.0004 ‐0.00037 ‐0.00052 ‐0.00052 ‐0.00037 ‐8.9E‐05 ‐0.00012 ‐0.00012 ‐8.9E‐05 0.001131 0.001571 0.001571 0
Carry over 0 0 ‐0.00405 ‐0.00046 0 0 ‐0.0002 ‐0.00243 0 0 ‐0.00019 ‐0.0002 0 0 ‐4.4E‐05 ‐0.00019 0 0 0.000566 ‐4.4E‐05 0 0 0
Release 0.001267 0.001267 0.00152 0.000203 0.000169 0.000169 0.000122 0.000548 0.000761 0.000761 0.000548 5.11E‐05 7.1E‐05 7.1E‐05 5.11E‐05 ‐8E‐05 ‐0.00011 ‐0.00011 ‐8E‐05 1.18E‐05 1.63E‐05 1.63E‐05 0
Carry over 0 0 0.000102 0.00076 0 0 0.000274 6.09E‐05 0 0 2.55E‐05 0.000274 0 0 ‐4E‐05 2.55E‐05 0 0 5.88E‐06 ‐4E‐05 0 0 0
Release ‐3.2E‐05 ‐3.2E‐05 ‐3.8E‐05 ‐0.00032 ‐0.00026 ‐0.00026 ‐0.00019 ‐1.8E‐05 ‐2.5E‐05 ‐2.5E‐05 ‐1.8E‐05 ‐4.9E‐05 ‐6.8E‐05 ‐6.8E‐05 ‐4.9E‐05 ‐6.6E‐06 ‐9.1E‐06 ‐9.1E‐06 ‐6.6E‐06 1.05E‐05 1.46E‐05 1.46E‐05 0
Carry over 0 0 ‐0.00016 ‐1.9E‐05 0 0 ‐9.1E‐06 ‐9.5E‐05 0 0 ‐2.5E‐05 ‐9.1E‐06 0 0 ‐3.3E‐06 ‐2.5E‐05 0 0 5.26E‐06 ‐3.3E‐06 0 0 0

Total 0.200081 0.200081 ‐0.40032 ‐7.91079 ‐4.81736 ‐4.81736 17.54549 ‐22.2063 0.501831 0.501831 21.20248 ‐20.637 0.021759 0.021759 20.59348 ‐21.3365 ‐0.70979 ‐0.70979 22.7561 ‐16.2212 6.760608 6.760608 2.7
Beam A1B1C1D1E1F1G1 Moments by Moment Distribution (due to TOTAL Load)
Joint G2 F2 E2 D2 C2 B2
Member G2UP G2DN G2F2 F2G2 F2UP F2DN F2E2 E2F2 E2UP E2DN E2D2 D2E2 D2UP D2DN D2C2 C2D2 C2UP C2DN C2B2 B2C2 B2UP B2DN B2A2
I(x10^‐3) 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125
L 3.6 3.6 3 3 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 1.8
K(x4E) 0.868056 0.868056 1.041667 1.041667 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 1.736111
D.F. 0.3125 0.3125 0.375 0.306122 0.255102 0.255102 0.183673 0.209302 0.290698 0.290698 0.209302 0.209302 0.290698 0.290698 0.209302 0.209302 0.290698 0.290698 0.209302 0.264706 0.367647 0.367647 0
UDL 0 0 26.6875 26.6875 0 0 36.5625 36.5625 0 0 36.5625 36.5625 0 0 36.5625 36.5625 0 0 36.5625 36.5625 0 0 34.55
FEM 0 0 20.01563 ‐20.0156 0 0 76.17188 ‐76.1719 0 0 76.17188 ‐76.1719 0 0 76.17188 ‐76.1719 0 0 76.17188 ‐76.1719 0 0 9.3285
Release ‐6.25488 ‐6.25488 ‐7.50586 ‐17.1907 ‐14.3256 ‐14.3256 ‐10.3144 0 0 0 0 0 0 0 0 0 0 0 0 17.69383 24.57477 24.57477 0
Carry over 0 0 ‐8.59534 ‐3.75293 0 0 0 ‐5.15721 0 0 0 0 0 0 0 0 0 0 8.846917 0 0 0 0
Release 2.686045 2.686045 3.223254 1.148856 0.95738 0.95738 0.689314 1.079415 1.499188 1.499188 1.079415 0 0 0 0 ‐1.85168 ‐2.57178 ‐2.57178 ‐1.85168 0 0 0 0
Carry over 0 0 0.574428 1.611627 0 0 0.539708 0.344657 0 0 0 0.539708 0 0 ‐0.92584 0 0 0 0 ‐0.92584 0 0 0
Release ‐0.17951 ‐0.17951 ‐0.21541 ‐0.65857 ‐0.54881 ‐0.54881 ‐0.39514 ‐0.07214 ‐0.10019 ‐0.10019 ‐0.07214 0.080818 0.112248 0.112248 0.080818 0 0 0 0 0.245075 0.340382 0.340382 0
Carry over 0 0 ‐0.32929 ‐0.10771 0 0 ‐0.03607 ‐0.19757 0 0 0.040409 ‐0.03607 0 0 0 0.040409 0 0 0.122538 0 0 0 0
Release 0.102902 0.102902 0.123482 0.044012 0.036677 0.036677 0.026407 0.032894 0.045687 0.045687 0.032894 0.007549 0.010485 0.010485 0.007549 ‐0.03411 ‐0.04737 ‐0.04737 ‐0.03411 0 0 0 0
Carry over 0 0 0.022006 0.061741 0 0 0.016447 0.013204 0 0 0.003775 0.016447 0 0 ‐0.01705 0.003775 0 0 0 ‐0.01705 0 0 0
Release ‐0.00688 ‐0.00688 ‐0.00825 ‐0.02394 ‐0.01995 ‐0.01995 ‐0.01436 ‐0.00355 ‐0.00494 ‐0.00494 ‐0.00355 0.000127 0.000176 0.000176 0.000127 ‐0.00079 ‐0.0011 ‐0.0011 ‐0.00079 0.004514 0.006269 0.006269 0
Carry over 0 0 ‐0.01197 ‐0.00413 0 0 ‐0.00178 ‐0.00718 0 0 6.34E‐05 ‐0.00178 0 0 ‐0.0004 6.34E‐05 0 0 0.002257 ‐0.0004 0 0 0
Release 0.00374 0.00374 0.004488 0.001807 0.001506 0.001506 0.001084 0.00149 0.002069 0.002069 0.00149 0.000455 0.000631 0.000631 0.000455 ‐0.00049 ‐0.00067 ‐0.00067 ‐0.00049 0.000105 0.000145 0.000145 0
Carry over 0 0 0.000904 0.002244 0 0 0.000745 0.000542 0 0 0.000227 0.000745 0 0 ‐0.00024 0.000227 0 0 5.23E‐05 ‐0.00024 0 0 0
Release ‐0.00028 ‐0.00028 ‐0.00034 ‐0.00091 ‐0.00076 ‐0.00076 ‐0.00055 ‐0.00016 ‐0.00022 ‐0.00022 ‐0.00016 ‐0.00011 ‐0.00015 ‐0.00015 ‐0.00011 ‐5.9E‐05 ‐8.1E‐05 ‐8.1E‐05 ‐5.9E‐05 6.43E‐05 8.93E‐05 8.93E‐05 0
Carry over 0 0 ‐0.00046 ‐0.00017 0 0 ‐8.1E‐05 ‐0.00027 0 0 ‐5.3E‐05 ‐8.1E‐05 0 0 ‐2.9E‐05 ‐5.3E‐05 0 0 3.21E‐05 ‐2.9E‐05 0 0 0

Total ‐3.64886 ‐3.64886 7.297271 ‐38.8844 ‐13.8995 ‐13.8995 66.68319 ‐80.1378 1.441593 1.441593 77.25424 ‐75.5641 0.123394 0.123394 75.31716 ‐78.0146 ‐2.621 ‐2.621 83.25655 ‐59.1718 24.92166 24.92166 9.3285
Beam B1B2B3B4 Moments by Moment Distribution (due to DEAD Load)
Joint B1 B2 B3
Member B1UP B1DN B1B2 B2B1 B2UP B2DN B2B3 B3B2 B3UP B3DN B3B4
I(x10^‐3) 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125
L 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 1.8
K(x4E) 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 1.736111
D.F. 0.367647 0.367647 0.264706 0.209302 0.290698 0.290698 0.209302 0.264706 0.367647 0.367647 0
UDL 0 0 13.8115 13.8115 0 0 13.8115 13.8115 0 0 10.35
FEM 0 0 28.77396 ‐28.774 0 0 28.77396 ‐28.774 0 0 2.7945
Release ‐10.5787 ‐10.5787 ‐7.61664 0 0 0 0 6.876915 9.551271 9.551271 0
Carry Over 0 0 0 ‐3.80832 0 0 3.438458 1.39725 0 0
Release 0 0 0 0.077413 0.107518 0.107518 0.077413 ‐0.36986 ‐0.51369 ‐0.51369 0
Carry Over 0 0 0.038706 0 0 0 ‐0.18493 0.038706 0 0
Release ‐0.01423 ‐0.01423 ‐0.01025 0.038706 0.053759 0.053759 0.038706 ‐0.01025 ‐0.01423 ‐0.01423 0
Carry Over 0 0 0.019353 ‐0.00512 0 0 ‐0.00512 0.019353 0 0
Release ‐0.00712 ‐0.00712 ‐0.00512 0.002144 0.002978 0.002978 0.002144 ‐0.00512 ‐0.00712 ‐0.00712 0
Carry Over 0 0 0.001072 ‐0.00256 0 0 ‐0.00256 0.001072 0 0
Release ‐0.00039 ‐0.00039 ‐0.00028 0.001072 0.001489 0.001489 0.001072 ‐0.00028 ‐0.00039 ‐0.00039 0
Carry Over 0 0 0.000536 ‐0.00014 0 0 ‐0.00014 0.000536 0 0
Release ‐0.0002 ‐0.0002 ‐0.00014 5.94E‐05 8.25E‐05 8.25E‐05 5.94E‐05 ‐0.00014 ‐0.0002 ‐0.0002 0
Carry Over 0 0 2.97E‐05 ‐7.1E‐05 0 0 ‐7.1E‐05 2.97E‐05 0 0

TOTAL ‐10.6006 ‐21.2012 21.20123 ‐32.4708 0.165826 0.165826 32.13898 ‐20.8258 9.01564 9.01564 2.7945
Beam B1B2B3B4 Moments by Moment Distribution (due to LIVE Load)
Joint B1 B2 B3
Member B1UP B1DN B1B2 B2B1 B2UP B2DN B2B3 B3B2 B3UP B3DN B3B4
I(x10^‐3) 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125
L 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 1.8
K(x4E) 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 1.736111
D.F. 0.367647 0.367647 0.264706 0.209302 0.290698 0.290698 0.209302 0.264706 0.367647 0.367647 0
UDL 0 0 10 10 0 0 10 10 0 0 7.2
FEM 0 0 20.83333 ‐20.8333 0 0 20.83333 ‐20.8333 0 0 1.944
Release ‐7.65931 ‐7.65931 ‐5.51471 0 0 0 0 5.000118 6.944608 6.944608 0
Carry Over 0 0 0 ‐2.75735 0 0 2.500059 0.972 0 0
Release 0 0 0 0.053852 0.074795 0.074795 0.053852 ‐0.25729 ‐0.35735 ‐0.35735 0
Carry Over 0 0 0.026926 0 0 0 ‐0.12865 0.026926 0 0
Release ‐0.0099 ‐0.0099 ‐0.00713 0.026926 0.037397 0.037397 0.026926 ‐0.00713 ‐0.0099 ‐0.0099 0
Carry Over 0 0 0.013463 ‐0.00356 0 0 ‐0.00356 0.013463 0 0
Release ‐0.00495 ‐0.00495 ‐0.00356 0.001492 0.002072 0.002072 0.001492 ‐0.00356 ‐0.00495 ‐0.00495 0
Carry Over 0 0 0.000746 ‐0.00178 0 0 ‐0.00178 0.000746 0 0
Release ‐0.00027 ‐0.00027 ‐0.0002 0.000746 0.001036 0.001036 0.000746 ‐0.0002 ‐0.00027 ‐0.00027 0
Carry Over 0 0 0.000373 ‐9.9E‐05 0 0 ‐9.9E‐05 0.000373 0 0
Release ‐0.00014 ‐0.00014 ‐9.9E‐05 4.13E‐05 5.74E‐05 5.74E‐05 4.13E‐05 ‐9.9E‐05 ‐0.00014 ‐0.00014 0
Carry Over 0 0 2.07E‐05 ‐4.9E‐05 0 0 ‐4.9E‐05 2.07E‐05 0 0

TOTAL ‐7.67457 ‐15.3491 15.34917 ‐23.5131 0.115358 0.115358 23.28231 ‐15.088 6.571995 6.571995 1.944
Beam B1B2B3B4 Moments by Moment Distribution (due to TOTAL Load)
Joint B1 B2 B3
Member B1UP B1DN B1B2 B2B1 B2UP B2DN B2B3 B3B2 B3UP B3DN B3B4
I(x10^‐3) 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125 3.125
L 3.6 3.6 5 5 3.6 3.6 5 5 3.6 3.6 1.8
K(x4E) 0.868056 0.868056 0.625 0.625 0.868056 0.868056 0.625 0.625 0.868056 0.868056 1.736111
D.F. 0.367647 0.367647 0.264706 0.209302 0.290698 0.290698 0.209302 0.264706 0.367647 0.367647 0
UDL 0 0 24.375 24.375 0 0 24.375 24.375 0 0 17.55
FEM 0 0 50.78125 ‐50.7813 0 0 50.78125 ‐50.7813 0 0 4.7385
Release ‐18.6696 ‐18.6696 ‐13.4421 0 0 0 0 12.18779 16.92748 16.92748 0
Carry Over 0 0 0 ‐6.72105 0 0 6.093893 2.36925 0 0
Release 0 0 0 0.131265 0.182312 0.182312 0.131265 ‐0.62715 ‐0.87105 ‐0.87105 0
Carry Over 0 0 0.065632 0 0 0 ‐0.31358 0.065632 0 0
Release ‐0.02413 ‐0.02413 ‐0.01737 0.065632 0.091156 0.091156 0.065632 ‐0.01737 ‐0.02413 ‐0.02413 0
Carry Over 0 0 0.032816 ‐0.00869 0 0 ‐0.00869 0.032816 0 0
Release ‐0.01206 ‐0.01206 ‐0.00869 0.003636 0.00505 0.00505 0.003636 ‐0.00869 ‐0.01206 ‐0.01206 0
Carry Over 0 0 0.001818 ‐0.00434 0 0 ‐0.00434 0.001818 0 0
Release ‐0.00067 ‐0.00067 ‐0.00048 0.001818 0.002525 0.002525 0.001818 ‐0.00048 ‐0.00067 ‐0.00067 0
Carry Over 0 0 0.000909 ‐0.00024 0 0 ‐0.00024 0.000909 0 0
Release ‐0.00033 ‐0.00033 ‐0.00024 0.000101 0.00014 0.00014 0.000101 ‐0.00024 ‐0.00033 ‐0.00033 0
Carry Over 0 0 5.04E‐05 ‐0.00012 0 0 ‐0.00012 5.04E‐05 0 0

TOTAL ‐18.7068 ‐37.4135 37.4136 ‐57.3132 0.281184 0.281184 56.75063 ‐36.7769 16.01924 16.01924 4.7385
TOTAL Load per metre DEAD

Beam no. Load Length BM Dead SF Dead Beam no. Load Length BM DEAD SF DEAD

B1B2 13.8115 5 14.38698 34.52875


B1C1 7.1875 5 7.486979 17.96875 B2B3 13.8115 5 14.38698 34.52875
C1D1 7.1875 5 7.486979 17.96875
D1E1 7.1875 5 7.486979 17.96875
E1F1 7.1875 5 7.486979 17.96875 C1C2 14.375 5 14.97396 35.9375
F1G1 4.3125 3 1.617188 6.46875 C2C3 14.375 5 14.97396 35.9375

B2C2 14.375 5 14.97396 35.9375 D1D2 14.375 5 14.97396 35.9375


C2D2 14.375 5 14.97396 35.9375 D2D3 14.375 5 14.97396 35.9375
D2E2 14.375 5 14.97396 35.9375
E2F2 14.375 5 14.97396 35.9375
F2G2 4.3125 3 1.617188 6.46875 E1E2 14.375 5 14.97396 35.9375
E2E3 14.375 5 14.97396 35.9375

B3C3 13.812 5 14.38698 34.52875


C3D3 13.812 5 14.38698 34.52875 F1F2 13.225 5 13.77604 33.0625
D3E3 13.812 5 14.38698 34.52875 F2F3 7.1875 5 7.486979 17.96875
E3F3 13.812 5 14.38698 34.52875
F3G3 4.3125 3 1.617188 6.46875
G1G2 6.0375 5 6.289063 15.09375
TOTAL Load per metre LIVE

Beam no. Load Length BM Live SF DEAD Beam no. Load Length BM Live SF Live

B1B2 23.4195 5 24.39531 58.5488


B1C1 5 5 5.208333 12.5 B2B3 23.4195 5 24.39531 58.5488
C1D1 5 5 5.208333 12.5
D1E1 5 5 5.208333 12.5
E1F1 5 5 5.208333 12.5 C1C2 10 5 10.41667 25
F1G1 3 3 1.125 4.5 C2C3 10 5 10.41667 25

B2C2 10 5 10.41667 25 D1D2 10 5 10.41667 25


C2D2 10 5 10.41667 25 D2D3 10 5 10.41667 25
D2E2 10 5 10.41667 25
E2F2 10 5 10.41667 25
F2G2 3 3 1.125 4.5 E1E2 10 5 10.41667 25
E2E3 10 5 10.41667 25

B3C3 23.42 5 24.39531 58.54875


C3D3 23.42 5 24.39531 58.54875 F1F2 9.2 5 9.583333 23
D3E3 23.42 5 24.39531 58.54875 F2F3 5 5 5.208333 12.5
E3F3 23.42 5 24.39531 58.54875
F3G3 3 3 1.125 4.5
G1G2 4.2 5 4.375 10.5
Load Combination Load Combination

Beam no. BM1.5(DL+LL) SF1.5(DL+LL) Beam no. BM1.5(DL+LL) SF1.5(DL+LL)

B1B2 58.1734375 139.61625


B1C1 19.04296875 45.703125 B2B3 58.1734375 139.61625
C1D1 19.04296875 45.703125 0 0
D1E1 19.04296875 45.703125 0 0
E1F1 19.04296875 45.703125 C1C2 38.0859375 91.40625
F1G1 4.11328125 16.453125 C2C3 38.0859375 91.40625
0 0 0 0
0 0 0 0
B2C2 38.0859375 91.40625 D1D2 38.0859375 91.40625
C2D2 38.0859375 91.40625 D2D3 38.0859375 91.40625
D2E2 38.0859375 91.40625 0 0
E2F2 38.0859375 91.40625 0 0
F2G2 4.11328125 16.453125 E1E2 38.0859375 91.40625
0 0 E2E3 38.0859375 91.40625
0 0 0 0
B3C3 58.1734375 139.61625 0 0
C3D3 58.1734375 139.61625 F1F2 35.0390625 84.09375
D3E3 58.1734375 139.61625 F2F3 19.04296875 45.703125
E3F3 58.1734375 139.61625 0 0
F3G3 4.11328125 16.453125 0 0
G1G2 15.99609375 38.390625
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 34

SEISMIC ANALYSIS

Earthquake load analysis :

For w1 :

a) Wt. of slab= 24.8×11.8×0.15×25=1077.4 kN


b) Wt of beam = [ 24.8×3+11.8×6] ×0.3×0.35×25=381.15 kN
c) Wt of wall : (28×.25 + 8×0.125)×0.8×20×3.1=396.8 kN
e) Live Load = 0.5 ×4×24.8×11.8=585.28 kN
f) Column = (1.8+1.8-0.5)×25×18×0.45×0.45=282.4875
Total w1 =2346.3175

For w2 :

a) Wt. of slab= 24.8×11.8×0.15×25=1077.4 kN


b) Wt of beam = [ 24.8×3+11.8×6] ×0.3×0.35×25=381.15 kN
c) Wt of wall : (28×.25 + 8×0.125)×0.8×20×3.1=396.8 kN
e) Live Load = 0.5 ×4×24.8×11.8=585.28 kN
f) Column = (1.8+1.8-0.5)×25×18×0.45×0.45=282.4875
Total w2 =2346.3175

For w3 :

a) Wt. of slab= 24.8×11.8×0.15×25=1077.4 kN


b) Wt of beam = [ 24.8×3+11.8×6] ×0.3×0.35×25=381.15 kN
c) Wt of wall : (28×.25 + 8×0.125)×0.8×20×3.1=396.8 kN
e) Live Load = 0.5 ×4×24.8×11.8=585.28 kN
f) Column = (1.8+1.8-0.5)×25×18×0.45×0.45=282.4875
Total w3 =2346.3175

For w4 :

a) Wt. of slab= 24.8×11.8×0.15×25=1077.4 kN

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 35

b) Wt of beam = [ 24.8×3+11.8×6] ×0.3×0.35×25=381.15 kN


c) Wt of wall : (28×.25 + 8×0.125)×0.8×20×3.1=396.8 kN
e) Live Load = 0.5 ×4×24.8×11.8=585.28 kN
f) Column = (1.8+1.8-0.5)×25×18×0.45×0.45=282.4875
Total w4 =2346.3175

For w5 :

a) Wt. of slab= 24.8×11.8×0.15×25=1077.4 kN


b) Wt of beam = [ 24.8×3+11.8×6] ×0.3×0.35×25=381.15 kN
c) Wt of wall : (28×.25 + 8×0.125)×0.8×20×3.1=396.8 kN
e) Live Load = 0.5 ×4×24.8×11.8=585.28 kN
f) Column = (1.8×18+0.85×15)×25×0.45×0.45=228.572
Total w5 =2292.402

For w6 :

a) Wt of beam = [ 24.8×3+11.8×6] ×0.3×0.35×25=381.15 kN


b) Wt of wall : (28×.25 + 8×0.125)×0.8×20×3.1=396.8 kN
c) Live Load = 0.5 ×4×24.8×11.8=585.28 kN
d) Column = (2.2×1.5×25×0.45×0.45)=167.0625
Total w6 =1133.4925 (No slab)

For w7 :

a) Wt. of slab= 24.8×11.8×0.15×25=1077.4 kN


b) Wt of beam = 381.15-20×0.3×0.35×25= 328.65
c) Wt of wall : (28×.25 + 8×0.125)×0.8×20×3.1=396.8 kN
e) Live Load = 0.5 ×4×24.8×11.8=585.28 kN
f) Column = (0.85×15×25×0.45×0.45)=1600.3368 kN
Total w7=1600.3368 kN

w = w1 +w2 +w3+w4+w5+w6+w7
=14411.5013 kN

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 36

h=21.6m

Calculation of approximate natural time period:

Ta= 0.09 h/√𝑑𝑑 = 0.09×21.6/100.5 = 0.61

(Sa/g) =1.36/T =2.12


Ah= (Z/2) ×(Sa/d)× (p/12) = 0.36×1.5×2.1222/2×5 =0.1145

Calculation of base shear : Vb=Ah×w=0.1145×14411.5013 kN

=1651.54
For Shorter For Longer
Seismic load at each level
Span Span

LEVEL Wi Hi WiHi2 Qi=Vb*Wi*Hi2/∑WiHi^2 Qi/6 Qi/3


Roof 1600.3368 21.6 746653.1374 515.57742 85.93 171.86
4th 1133.4925 18.9 404894.85 279.587 46.6 93.2
4th 2292.402 16.2 601617.98 415.428 69.21 138.42
3rd 2346.3175 12.6 372501.36 257.22 42.37 86.74
2nd 2346.3175 9 190051.7175 131.234 21.872 43.744
1st 2346.3175 5.4 68418.61 47.244 7.874 15.748
Ground 2346.3175 1.8 7602.0687 5.249 0.874 1.748
∑WiHi 2
2005711.2

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 37

Earthquake Lateral Forces

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 38

Earthquake Lateral Forces per frame

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 39

Earthquake Moments at Beams

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 40

Earthquake Shear Forces at Beams

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 41

Earthquake Moments in Columns

Department of Civil Engineering


National Institute of Technology, Silchar
LOAD COMBINATION BEAM (KN.m)

ULTIMATE LIMIT STATE  SERVICEABLITY LIMIT STATE
(1)  1.5(DL+LL)
(2) .9DL+1.5EQ (1)DL+LL
(3) .9DL‐1.5EQ (2)DL‐EQ
(4) 1.5(DL+EQ) (3)DL+EQ
(5) 1.5(DL‐EQ) (4)DL+.8LL+.8EQ
(6)1.2(DL+LL+EQ) (5)DL+.8LL‐.8EQ
(7)1.2(DL+LL‐EQ)

Point of reference Ultimate Limit State MAX


BEAM DL LL  EL 1 2 3 4 5 6 7
AB1AB2 21.20123 15.349 29 54.82535 62.58111 ‐24.4189 75.30185 ‐11.6982 78.66028 9.060276 78.66028
‐32.47 ‐23.51 ‐29 ‐83.97 ‐72.723 14.277 ‐92.205 ‐5.205 ‐101.976 ‐32.376 14.277
AB2AB3 32.1389 23.38 29 83.27835 72.42501 ‐14.575 91.70835 4.70835 101.4227 31.82268 101.4227
‐20.8258 ‐15.09 ‐29 ‐53.8737 ‐62.2432 24.75678 ‐74.7387 12.2613 ‐77.899 ‐8.29896 24.75678
BB1BB2 21.20123 15.349 73.72 54.82535 129.6611 ‐91.4989 142.3818 ‐78.7782 132.3243 ‐44.6037 142.3818
‐32.47 ‐23.51 ‐73.72 ‐83.97 ‐139.803 81.357 ‐159.285 61.875 ‐155.64 21.288 81.357
BB2BB3 32.1389 23.38 73.72 83.27835 139.505 ‐81.655 158.7884 ‐62.3717 155.0867 ‐21.8413 158.7884
‐20.8258 ‐15.09 ‐73.72 ‐53.8737 ‐129.323 91.83678 ‐141.819 79.3413 ‐131.563 45.36504 91.83678
CB1CB2 21.20123 15.349 135.5 54.82535 222.3311 ‐184.169 235.0518 ‐171.448 206.4603 ‐118.74 235.0518
‐32.47 ‐23.51 ‐135.5 ‐83.97 ‐232.473 174.027 ‐251.955 154.545 ‐229.776 95.424 174.027
CB2CB3 32.1389 23.38 135.5 83.27835 232.175 ‐174.325 251.4584 ‐155.042 229.2227 ‐95.9773 251.4584
‐20.8258 ‐15.09 ‐135.5 ‐53.8737 ‐221.993 184.5068 ‐234.489 172.0113 ‐205.699 119.501 184.5068
DB1DB2 21.20123 15.349 200.85 54.82535 320.3561 ‐282.194 333.0768 ‐269.473 284.8803 ‐197.16 333.0768
‐32.47 ‐23.51 ‐200.85 ‐83.97 ‐330.498 272.052 ‐349.98 252.57 ‐308.196 173.844 272.052
DB2DB3 32.1389 23.38 200.85 83.27835 330.2 ‐272.35 349.4834 ‐253.067 307.6427 ‐174.397 349.4834
‐20.8258 ‐15.09 ‐200.85 ‐53.8737 ‐320.018 282.5318 ‐332.514 270.0363 ‐284.119 197.921 282.5318
EB1EB2 21.20123 15.349 229.975 54.82535 364.0436 ‐325.881 376.7643 ‐313.161 319.8303 ‐232.11 376.7643
‐32.47 ‐23.51 ‐229.975 ‐83.97 ‐374.186 315.7395 ‐393.668 296.2575 ‐343.146 208.794 315.7395
EB2EB3 32.1389 23.38 229.975 83.27835 373.8875 ‐316.037 393.1709 ‐296.754 342.5927 ‐209.347 393.1709
‐20.8258 ‐15.09 ‐229.975 ‐53.8737 ‐363.706 326.2193 ‐376.201 313.7238 ‐319.069 232.871 326.2193
FB1FB2 21.20123 15.349 243.37 54.82535 384.1361 ‐345.974 396.8568 ‐333.253 335.9043 ‐248.184 396.8568
‐32.47 ‐23.51 ‐243.37 ‐83.97 ‐394.278 335.832 ‐413.76 316.35 ‐359.22 224.868 335.832
FB2FB3 32.1389 23.38 243.37 83.27835 393.98 ‐336.13 413.2634 ‐316.847 358.6667 ‐225.421 413.2634
‐20.8258 ‐15.09 ‐243.37 ‐53.8737 ‐383.798 346.3118 ‐396.294 333.8163 ‐335.143 248.945 346.3118
GB1GB2 21.20123 15.349 247.37 54.82535 390.1361 ‐351.974 402.8568 ‐339.253 340.7043 ‐252.984 402.8568
‐32.47 ‐23.51 ‐247.37 ‐83.97 ‐400.278 341.832 ‐419.76 322.35 ‐364.02 229.668 341.832
GB2GB3 32.1389 23.38 247.37 83.27835 399.98 ‐342.13 419.2634 ‐322.847 363.4667 ‐230.221 419.2634
‐20.8258 ‐15.09 ‐247.37 ‐53.8737 ‐389.798 352.3118 ‐402.294 339.8163 ‐339.943 253.745 352.3118

Point of Reference Servicibility in Limit State
DL  LL EL 1 2 3 4 5 MAX
AB1AB2 21.20123 15.349 29 36.55023 ‐7.79877 50.20123 56.68043 10.28043 56.68043
‐32.47 ‐23.51 ‐29 ‐55.98 ‐3.47 ‐61.47 ‐74.478 ‐28.078 ‐3.47
AB2AB3 32.1389 23.38 29 55.5189 3.1389 61.1389 74.0429 27.6429 74.0429
‐20.8258 ‐15.09 ‐29 ‐35.9158 8.1742 ‐49.8258 ‐56.0978 ‐9.6978 8.1742
BB1BB2 21.20123 15.349 73.72 36.55023 ‐52.5188 94.92123 92.45643 ‐25.4956 94.92123
‐32.47 ‐23.51 ‐73.72 ‐55.98 41.25 ‐106.19 ‐110.254 7.698 41.25
BB2BB3 32.1389 23.38 73.72 55.5189 ‐41.5811 105.8589 109.8189 ‐8.1331 109.8189
‐20.8258 ‐15.09 ‐73.72 ‐35.9158 52.8942 ‐94.5458 ‐91.8738 26.0782 52.8942
CB1CB2 21.20123 15.349 135.5 36.55023 ‐114.299 156.7012 141.8804 ‐74.9196 156.7012
‐32.47 ‐23.51 ‐135.5 ‐55.98 103.03 ‐167.97 ‐159.678 57.122 103.03
CB2CB3 32.1389 23.38 135.5 55.5189 ‐103.361 167.6389 159.2429 ‐57.5571 167.6389
‐20.8258 ‐15.09 ‐135.5 ‐35.9158 114.6742 ‐156.326 ‐141.298 75.5022 114.6742
DB1DB2 21.20123 15.349 200.85 36.55023 ‐179.649 222.0512 194.1604 ‐127.2 222.0512
‐32.47 ‐23.51 ‐200.85 ‐55.98 168.38 ‐233.32 ‐211.958 109.402 168.38
DB2DB3 32.1389 23.38 200.85 55.5189 ‐168.711 232.9889 211.5229 ‐109.837 232.9889
‐20.8258 ‐15.09 ‐200.85 ‐35.9158 180.0242 ‐221.676 ‐193.578 127.7822 180.0242
EB1EB2 21.20123 15.349 229.975 36.55023 ‐208.774 251.1762 217.4604 ‐150.5 251.1762
‐32.47 ‐23.51 ‐229.975 ‐55.98 197.505 ‐262.445 ‐235.258 132.702 197.505
EB2EB3 32.1389 23.38 229.975 55.5189 ‐197.836 262.1139 234.8229 ‐133.137 262.1139
‐20.8258 ‐15.09 ‐229.975 ‐35.9158 209.1492 ‐250.801 ‐216.878 151.0822 209.1492
FB1FB2 21.20123 15.349 243.37 36.55023 ‐222.169 264.5712 228.1764 ‐161.216 264.5712
‐32.47 ‐23.51 ‐243.37 ‐55.98 210.9 ‐275.84 ‐245.974 143.418 210.9
FB2FB3 32.1389 23.38 243.37 55.5189 ‐211.231 275.5089 245.5389 ‐143.853 275.5089
‐20.8258 ‐15.09 ‐243.37 ‐35.9158 222.5442 ‐264.196 ‐227.594 161.7982 222.5442
GB1GB2 21.20123 15.349 247.37 36.55023 ‐226.169 268.5712 231.3764 ‐164.416 268.5712
‐32.47 ‐23.51 ‐247.37 ‐55.98 214.9 ‐279.84 ‐249.174 146.618 214.9
GB2GB3 32.1389 23.38 247.37 55.5189 ‐215.231 279.5089 248.7389 ‐147.053 279.5089
‐20.8258 ‐15.09 ‐247.37 ‐35.9158 226.5442 ‐268.196 ‐230.794 164.9982 226.5442
LOAD COMBINATION Column(KN.m)

ULTIMATE LIMIT STATE  SERVICEABLITY LIMIT STATE
(1)  1.5(DL+LL)
(2) .9DL+1.5EQ (1)DL+LL
(3) .9DL‐1.5EQ (2)DL‐EQ
(4) 1.5(DL+EQ) (3)DL+EQ
(5) 1.5(DL‐EQ) (4)DL+.8LL+.8EQ
(6)1.2(DL+LL+EQ) (5)DL+.8LL‐.8EQ
(7)1.2(DL+LL‐EQ)

Point oF rEFErEnCE ULTIMATE LIMIT STATE MAX


Column DL LL  EL 1 2 3 4 5 6 7
AB1BB1 MOMENTS ‐10.6 ‐7.67 28.99 ‐27.405 33.945 ‐53.025 27.585 ‐59.385 12.864 ‐56.712 33.945
AXIAL 133.43 21 11.6 231.645 137.487 102.687 217.545 182.745 199.236 171.396 217.545
BB1CB1 MOMENTS ‐21.2 ‐15.35 44.72 ‐54.825 48 ‐86.16 35.28 ‐98.88 9.804 ‐97.524 48
AXIAL 266.86 0 41.09 400.29 301.809 178.539 461.925 338.655 369.54 270.924 461.925
CB1DB1 MOMENTS ‐10.6 ‐7.67 97.98 ‐27.405 137.43 ‐156.51 131.07 ‐162.87 95.652 ‐139.5 137.43
AXIAL 400.29 21 95.29 631.935 503.196 217.326 743.37 457.5 619.896 391.2 743.37
DB1EB1 MOMENTS ‐21.2 ‐15.35 110.07 ‐54.825 146.025 ‐184.185 133.305 ‐196.905 88.224 ‐175.944 146.025
AXIAL 533.72 21 175.64 832.08 743.808 216.888 1064.04 537.12 876.432 454.896 1064.04
EB1FB1 MOMENTS ‐10.6 ‐7.67 119.97 ‐27.405 170.415 ‐189.495 164.055 ‐195.855 122.04 ‐165.888 170.415
AXIAL 667.15 21 267.64 1032.225 1001.895 198.975 1402.185 599.265 1146.948 504.612 1402.185
FB1GB1 MOMENTS ‐21.2 ‐15.35 123.46 ‐54.825 166.11 ‐204.27 153.39 ‐216.99 104.292 ‐192.012 166.11
AXIAL 800.58 21 364.98 1232.37 1267.992 173.052 1748.34 653.4 1423.872 547.92 1748.34

POINT OF REFERENCE SERVICIBILITY LIMIT STATE
DL  LL EL 1 2 3 4 5 MAX
AB1BB1 ‐10.6 ‐7.67 28.99 ‐18.27 ‐39.59 18.39 6.456 ‐39.928 18.39
133.43 21 11.6 154.43 121.83 145.03 159.51 140.95 159.51
BB1CB1 ‐21.2 ‐15.35 44.72 ‐36.55 ‐65.92 23.52 2.296 ‐69.256 23.52
266.86 0 41.09 266.86 225.77 307.95 299.732 233.988 307.95
CB1DB1 ‐10.6 ‐7.67 97.98 ‐18.27 ‐108.58 87.38 61.648 ‐95.12 87.38
400.29 21 95.29 421.29 305 495.58 493.322 340.858 495.58
DB1EB1 ‐21.2 ‐15.35 110.07 ‐36.55 ‐131.27 88.87 54.576 ‐121.536 88.87
533.72 21 175.64 554.72 358.08 709.36 691.032 410.008 709.36
EB1FB1 ‐10.6 ‐7.67 119.97 ‐18.27 ‐130.57 109.37 79.24 ‐112.712 109.37
667.15 21 267.64 688.15 399.51 934.79 898.062 469.838 934.79
FB1GB1 ‐21.2 ‐15.35 123.46 ‐36.55 ‐144.66 102.26 65.288 ‐132.248 102.26
800.58 21 364.98 821.58 435.6 1165.56 1109.364 525.396 1165.56
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 44

Beam Design

Design +ve bending moment= 58.17kNm

Design -ve bending moment= 419.2634kNm

Design shear force= 212 kN

Design of beam GB2GB3 at floor level:

Grade of concrete = M25

Beam size = 300 mm x 500 mm

Width/depth =300/500 = 0.6>0.3

Hence ok

As per IS 456 Width should not be less than 200 mm.

Hence 300 mm width is ok

Depth should not be greater than span/4 = 5/4= 1.2

Hence 500 mm is ok

Effective depth of beam (d) = 500-30-25/2=457.5mm

Design of Longitudinal reinforcement

Due to hogging moment of 419.2634=420knm

Mu lim=0.138fckbd2=0.138x25x300x457.52 = 221.39 knm

Since Mu= 420> 221.39 knm

Hence doubly reinforced section

Mu/bd2=(420x106)/(300x457.52) = 6.686

d'/d= (30+25/2)/457.5 = 0.08

Using SP 16 TABLE 51

PTOP = 2.17%

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 45

P BOTTOM=1.02%

Top reinforcement= 2.17x300x457.5/100 = 2389.32 mm2

Using 32 mm bars , no. of bars = 3

Bottom reinforcement= 1.02x300x457.5/100 = 1299.97 mm2

Using 25 mm bars, no. of bars = 3

Check

As per IS CODE 13920, CLAUSE 6.2.1

Tension steel ≥.24(√fck/fy)*100

=0.24x(√25/415)/100= 0.29%

Hence tensile steel is ok

As per IS CODE 13920, Clause6.2.2

Max Steel(2.45%) ≤2.5%

Hence ok

Sagging moment=58.17kNm

58.17<Mu lim(=221.39kNm)

Mu/bd2 = 58.17x10^6/(300x457.5^2) = 0.93

d'/D = 0.08

Using SP 16 TABLE 3

P BOTTOM= 0.271%

Design of shear reinforcement

For Ast =2.45%

Tc=0.87N/mm2(IS 456, Table 19)

Vc=0.87x300x457.5 = 119kN

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 46

SF= 212 kN

SF for which shear reinforcement is to be provided.

V s= 212-119 = 93kN

Using 8mm stirrups 2 legged

Spacing =0.87x415x2x(3.14x82/4)x457.5/(101x1000)

=166 mm

As per IS 13920 Clause 6.35

Spacing of hoops over a length of 2d from support

<d/4=457.5/4 = 114.625 mm

<8x20 = 160 mm

Hence 100mm spacing is ok( near support)

As per IS13920, CLAUSE 6.3.5

Spacing of stirrups for rest of the beam<(457.5/2)=227.25 mm

Hence providing 8mm stirrups @ 150 mm c/c for remaining beam

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 47

Beam Design

Design +ve bending moment= 38.0859 kNm

Design -ve bending moment= 251.4584kNm

Design shear force= 139.616 kN

Design of beam CB2CB3 at fourth floor level:

Grade of concrete = M25

Beam size = 300 mm x 500 mm

Width/depth = 300/500 = 0.6 >0.3

Hence ok

As per IS 456 Width should not be less than 200 mm.

Hence 300 mm width is ok

Depth should not be greater than span/4 = 5/4= 1.2

Hence 500 mm is ok

Effective depth of beam (d) = 500-30-25/2=457.5mm

Design of Longitudinal reinforcement

Due to hogging moment of 251.4854 kNm

Mu lim=0.138fckbd2=0.138x25x300x457.52 = 221.39 kNm

Since Mu= 251.4854> 221.39 kNm

Hence doubly reinforced section

Mu/bd2=(251.4854x106)/(300x457.52) = 4.00

d'/d= (30+25/2)/457.5 = 0.08

Using SP 16 TABLE 51

PTOP = 1.364%

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 48

P BOTTOM=0.174%

Top reinforcement= 1.364x300x457.5/100 = 1872.09 mm2

Using 32 mm bars , no. of bars = 3

Bottom reinforcement= 0.174x300x457.5/100 = 238.82 mm2

Using 20 mm bars, no. of bars = 2

Check

As per IS CODE 13920, CLAUSE 6.2.1

Tension steel ≥.24(√fck/fy)*100

=0.24x(√25/415)/100= 0.29%

Hence tensile steel is ok

As per IS CODE 13920, Clause 6.2.2

Max Steel ≤2.5%

Hence ok

Sagging moment= 38.0859 kNm

38.0859 <Mu lim(=221.39 kNm)

Mu/bd2 = 38.0859 x10^6/(300x457.5^2) = 0.606

d'/D = 0.08

Using SP 16 TABLE 3

P BOTTOM= 0.171%

Design of shear reinforcement

For Ast =1.40%

Tc=0.72N/mm2(IS 456, Table 19)

Vc=0.72x300x457.5 = 98.82 kN

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 49

SF= 212kN

SF for which shear reinforcement is to be provided.

V s= 212-98.82 = 113.18kN

Using 8mm stirrups 2 legged

Spacing =0.87x415x2x(3.14x82/4)x457.5/(101x1000)

=166 mm

As per IS 13920 Clause 6.35

Spacing of hoops over a length of 2d from support

<d/4=457.5/4 = 114.625 mm

<8x20 = 160 mm

Hence 100mm spacing is ok( near support)

As per IS13920, CLAUSE 6.3.5

Spacing of stirrups for rest of the beam<(457.5/2)=227.25 mm

Hence providing 8mm stirrups @ 150 mm c/c for remaining beam

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 50

Beam Design

Design +ve bending moment=161 kNm

Design -ve bending moment= 271.24 kNm

Design shear force= 182kN

Design of beam GB2GB3 at floor level:

Grade of concrete = M25

Beam size = 300 mm x 500 mm

Width/depth =300/500 = 0.6>0.3

Hence ok

As per IS 456 Width should not be less than 200 mm.

Hence 300 mm width is ok

Depth should not be greater than span/4 = 10/4= 2.4

Hence 500 mm is ok

Effective depth of beam (d) = 500-30-25/2=457.5mm

Design of Longitudinal reinforcement

Due to hogging moment of 419.2634=271.2knm

Mu lim=0.138fckbd2=0.138x25x300x457.52 = 221.39 knm

Since Mu= 271.2> 221.39 knm

Hence doubly reinforced section

Mu/bd2=(271.2x106)/(300x457.52) = 4.32

d'/d= (30+25/2)/457.5 = 0.08

Using SP 16 TABLE 51

PTOP = 1.45%

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 51

P BOTTOM=0.27%

Top reinforcement= 1.45x300x457.5/100 = 1988.32 mm2

Using 32 mm bars , no. of bars = 3

Sagging moment=161kNm

161<Mu lim(=221.39kNm)

Mu/bd2 = 161x10^6/(300x457.5^2) = 2.56

d'/D = 0.08

Using SP 16 TABLE 3

P BOTTOM= 0.818%

Bottom reinforcement

= .818x300x457.5/100 =1122.7 mm2

Using 25 mm bars, no. of bars = 3

Check

As per IS CODE 13920, CLAUSE 6.2.1

Tension steel ≥.24(√fck/fy)*100

=0.24x(√25/415)/100= 0.29%

Hence tensile steel is less

As per IS CODE 13920, Clause6.2.2

Max Steel(2.45%) ≤2.5%

Hence ok

Design of shear reinforcement

For Ast =2.45%

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 52

Tc=0.87N/mm2(IS 456, Table 19)

Vc=0.87x300x457.5 = 119 kN

SF= 182kN

SF for which shear reinforcement is to be provided.

V s=182-119 = 63kN

Using 8mm stirrups 2 legged

Spacing =0.87x415x2x(3.14x82/4)x457.5/(101x1000)

=166 mm

As per IS 13920 Clause 6.35

Spacing of hoops over a length of 2d from support

<d/4=457.5/4 = 114.625 mm

<8x20 = 160 mm

Hence 100mm spacing is ok( near support)

As per IS13920, CLAUSE 6.3.5

Spacing of stirrups for rest of the beam<(457.5/2)=227.25 mm

Hence providing 8mm stirrups @ 150 mm c/c for remaining beam

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 53

COLUMN DESIGN

Top floor column design

Design axial force, Pu = 102 kN

Design bending moment, Mu = 79.49 kNm

Taking column cross-section 450mm x 450mm

L/D=2.7/.5=5.4<12, hence short column

Pu/ (fckbD) = 0.276

Mu/ (fckbD2) = 0.035

Taking clear cover = 40mm

And assuming 20mm dia bars.

d’=40+10=50mm

d’/D=50/450=.11

Using chart 44 of SP 16

p/ fck= 0.04

p = 1%

Area of steel = 1x450x450/100 = 2025 mm2

Hence provide 8 bars of 20 mm dia

As per IS 456, clause 26.5.3

Longitudinal reinforcement > 0.8% and <4%

Hence 1.24% is ok

Lateral ties

Dia of ties necessary >6mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 54

Providing 10 mm links

As per IS 13920, clause 7.33

Spacing of hoops <1/2 x D =250mm

Special confining reinforcement

Column size = 450mm x 450mm

Assuming rectangular hoops of 10mm dia

Core size 450-2x40+2x10=390mm,

390mmx390mm

As the dimensions are greater than 300mm crosstie needs to be provided

H=390/2=195mm

As per IS 13920, clause 7.4.8

Ash=0.18SH(fck/fy)(ag/ak-1) = 0.18x75x195x(25/415)x((450x450)/(390x390)-1) = 52.5 mm2

Area of cross section of 10 mm bar = 78.54 mm2

Since 78.54 mm2 > 52.5 mm2

10mm bars @ 75 mm spacing will be adequate

As per IS 13920, clause 7.2.1, Spacing of hoops at lap splice should be less than or equal to
150mm

Hence provide 150mm c/c spacing at lap splices

As per IS 13920, clause 7.4.1 special confining reinforcement length (lo) shall not be less than

a. Larger lateral dimension = 450mm


b. One sixth of clear span =1/6 x (2700-390) = 385mm
c. 450mm

Hence provide lo = 600 mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 55

COLUMN DESIGN

Top floor column design

Design axial force, Pu = 1064.04kN

Design bending moment, Mu = 256 kNm

Taking column cross-section 450mm x 450mm

L/D=3.6/.5=7.2<12, hence short column

Pu/ (fckbD) = 0.22

Mu/ (fckbD2) = 0.11

Taking clear cover = 40mm

And assuming 25mm dia bars.

d’=40+12.5=52.5mm

d’/D=52.5/450=.116

Using chart 45 of SP 16

p/ fck= 0.06

p = 1.5%

Area of steel = 1.5x450x450/100 = 3037 mm2

Hence provide 8 bars of 25 mm dia

As per IS 456, clause 26.5.3

Longitudinal reinforcement > 0.8% and <4%

Hence 1.5% is ok

Lateral ties

Dia of ties necessary >6mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 56

Providing 10 mm links

As per IS 13920, clause 7.33

Spacing of hoops <1/2 x D =250mm

Special confining reinforcement

Column size = 450mmx 450mm

Assuming rectangular hoops of 10mm dia

Core size 450-2x40+2x10=390mm,

390mmx390mm

As the dimensions are greater than 300mm crosstie needs to be provided

H=390/2=195mm

As per IS 13920, clause 7.4.8

Ash=0.18SH(fck/fy)(ag/ak-1) = 0.18x75x195x(25/415)x((450x450)/(385x385)-1) = 57.5 mm2

Area of cross section of 10 mm bar = 78.54 mm2

Since 78.54mm2> 57.5mm2

10mm bars @ 75 mm spacing will be adequate

As per IS 13920, clause 7.2.1, Spacing of hoops at lap splice should be less than or equal to
150mm

Hence provide 150mm c/c spacing at lap splices

As per IS 13920, clause 7.4.1 special confining reinforcement length (lo) shall not be less than

a. Larger lateral dimension = 450mm


b. One sixth of clear span =1/6 x (2700-390) = 385mm
c. 450mm

Hence provide lo = 600 mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 57

COLUMN DESIGN

Top floor column design

Design axial force, Pu = 1784.34 kN

Design bending moment, Mu = 273.24 kNm

Taking column cross-section 450mm x 450mm

L/D=3.6/.5=7.2<12, hence short column

Pu/ (fckbD) = 0.26

Mu/ (fckbD2) = 0.13

Taking clear cover = 40mm

And assuming 32mm dia bars.

d’=40+16=56mm

d’/D=56/450=.1244

Using chart 44 of SP 16

p/ fck= 0.08

p = 2%

Area of steel = 2x450x450/100 = 4050 mm2

Hence provide 8 bars of 32 mm dia

As per IS 456, clause 26.5.3

Longitudinal reinforcement > 0.8% and <4%

Hence 2% is ok

Lateral ties

Dia of ties necessary >6mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 58

Providing 10 mm links

As per IS 13920, clause 7.33

Spacing of hoops <1/2 x D =250mm

Special confining reinforcement

Column size = 450mm x 450mm

Assuming rectangular hoops of 10mm dia

Core size 450-2x40+2x10=390mm,

390mmx390mm

As the dimensions are greater than 300mm crosstie needs to be provided

H=390/2=195mm

As per IS 13920, clause 7.4.8

Ash=0.18SH(fck/fy)(ag/ak-1) = 0.18x75x195x(25/415)x((450x450)/(368x368)-1) = 72.54 mm2

Area of cross section of 10 mm bar = 72.54 mm2

Since 72.54 mm2 > 52.5 mm2

10mm bars @ 75 mm spacing will be adequate

As per IS 13920, clause 7.2.1, Spacing of hoops at lap splice should be less than or equal to
150mm

Hence provide 150mm c/c spacing at lap splices

As per IS 13920, clause 7.4.1 special confining reinforcement length (lo) shall not be less than

a. Larger lateral dimension = 450mm


b. One sixth of clear span =1/6 x (2700-390) = 385mm
c. 450mm

Hence provide lo = 600 mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 59

FOOTING DESIGN

Footing (For Inner Column):

Factored load coming from column is 1902 kN


Size of column 450mmx450mm
Grade of concrete M30
Grade of steel Fe 415
Safe bearing capacity of soil = 160 + 33% of this value
= 160 +52.8 kN/m2
= 212.8 kN/m2

1. FOOTING SIZE :

Load = (factored load/factor of safety) + self-weight of flooring


= 1902/1.2 +10 ×1902/(100×1.2)
= 1743.5 kN

Now area of footing= 1743.5/212.8 =8.19 m2=2.86×2.86


2.9×2.9 m2 is adopted.
Since we considered safe bearing capacity of soil therefore characteristic load is considered
in finding area of footing.

2. DEPTH FROM ONE WAY SHEAR

Minimum shear stress = 0.35 N/mm2


Q = P/L2
V= qL{(L-a)/2- d}
=P/L{(L-a)/2- d}
= P/2L(L-a-2d)

Now,LdƬc= P/2L (L-a-2d)


d=P(L-a)/2(P+ƬcL2)

3.DESIGN OF LOAD

Pu= 1902 kN
Reaction of soil =1902/(2.9*2.9)=226.16 KN/m2
Now,d=P(L-a)/2(P+ ƬcL2) =1902(2.9-0.5)/(2(1902+350×2.92))
= 0.471 m

4.DEPTH REQUIRED FOR PUNCHING SHEAR

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 60

To find the punching shear we have to take critical section at d/2 from face of column
Perimeter = (a+d)×4
Considering the equilibrium forces = P/L2[ L2-(a+d)2]=4(a+d)dτp
Where τp =0.25√fck
Perimeter =4 ×(0.5+0.471) =3.884
Shear force =P/L2(L2-(a+d)2) =1902/2.92 [ 2.92-(0.5 + 0.471)2]
= 1688.77 kN

Permissible shear stress =0.25× fck.5 = 0.25× 0.300.5= 1.36 N/mm2

Now, P/L2[ L2-(a+d)2]=4(a+d)dτp


d=1688.77/3.7×1.36=304.17 mm < 471 mm,design is ok for both shear

5. DEPTH REQUIRED FOR BENDING

Moment at the face of column


Mu= P/ L2[ L(L-a)2/8] = 1902/2.92x[2.9×(2.9-0.5)2]/8 =472.22 kNm.
d=√( Mu /(0.138 fckb))

Now, Mu =0.138 fckbd2

Calculating d=347<471 mm

So use d= 471mm
6.68𝑀𝑀
Now x/d=1.2-�1.44 −
𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 ^2

=0.075

Lever arm,z=d(1-0.416x/d)
=471×( 1-0.416×0.08)=423.74mm

AREA OF STEEL REQUIRED

Ast= Mu/(0.87Zfy)= 472.22 ×106/0.87 ×423.74×415 =2886 mm2

If we use 16 mm dia tor steel then area of bar,


As= 3.14×16×16/4=201.06mm2

No of bars required =2886.5/201.06 =12


12 nos. of 16 mm tor steel
Spacing = Spacing= L-2×clear cover-dia of bar/n-1 =(2900-2x50-16)/14 =198.8mm
Hence providing spacing of 200mm c/c 15 no of 16 ᵠ bars

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 61

Spacing is <3d and 450mm

Over all depth =471+50 +16=537 mm ≈ 540mm

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 62

Staircase Design

The height of each floor = 3.6m

Number of rise provided = 24

So the height of each rise (R) = 150 mm

Let tread (T) = 270 mm

Flights provided = 2

1st flight

No. of rise in = 12

Height from 0.0 m to 1.8 m

2nd flight

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 63

No. of rise in = 12

Height from 1.8 m to 3.6 m

Design of waist slab

Calculation of depth:

If we consider

l/d= 30

11 steps with tread 270mm, Going= 11*270=2970 mm

l= 1500+2970*[(R2+T2)0.5/T] = 1500+2970*[(1502+2702)/270] = 4897 mm ≈ 4900 mm

Hence d= 4900/30 = 163.33 mm

Let d = 165 mm

Considering 20 mm clear cover and 10 mm dia bar

Total depth, D = 165+20+(0.5*10) = 190 mm

Calculation of loads:

Self weight of waist slab= D*[(R2+T2)0.5/T]*25 = 0.19*[(1452+2502)0.5/250]*25 = 5.51


KN/m2

Self weight of steps= (1000/270)*(0.5*R*T)*25 = 1.875 KN/m2

Floor finish= 2 KN/m2

Self weight of landing slab = 25*0.19 = 4.75 KN/m2

Total dead load on flights = 5.51+1.875+2 = 9.385 ≈ 9.5 KN/m2

Total dead load on landings = 4.75+2 = 6.75 KN/m2

Live load = 4 KN/m2 [As per IS875 for commercial buildings]

Combined load on flight = 1.5(DL+LL) = 1.5*(9.5+4) = 20.25 KN/m2

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 64

Combined load on landings = 1.5(DL+LL) = 1.5*(6.75+4) = 16.125 KN/m2

Calculation of Bending Moment and Shear Force:

For each flight:

Maximum Bending Moment = 44.62 KN-m

Maximum Shear Force = 50.625 KN

Check:

Mu, max= 0.138fckbd2

44.62*106 = 0.138*25*1000*d2

d=113.72mm

d = 165mm>113.72mm (provided)

hence ok

Calculation of area of steel:

Ast= 0.5 bdfck/fy [1 - (1 - 4.6Mu/fckbd2)0.5]

Since Mu= 44.62*106 N-mm

Ast = 763 mm2

provided Ast=785 mm2> 763 mm2

Provide 10 mm dia bars @ 100 mm c/c [Total 10 no.s provided]

max spacing= 3d=3*165=495mm or 300 mm whichever is smaller

hence ok

Check for Shear:

100Ast/bd = (100*785)/(1000*165) = 0.475

For Ast=0.475%, Tc=0.477 [As per IS 456:2000, Table 19, pg 73]

Shear strength of slab = 0.477*1000*0.165 = 78.7 KN > 50.625 KN

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 65

So the slab is capable of taking maximum shear force.

Calculation of distribution steel:

Ast= 0.12% of Ag = (0.12/100)*1000*165 = 198 mm2 per m

So provide 8 mm dia bar @ 200 mm c/c [Total 5 no.s]

Area provided: 251.33 mm2> 198 mm2 per m

So safe.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 65

BEAM COLUMN LAYOUT

Department of Civil Engineering


National Institute of Technology, Silchar
Tuesday, May 05, 2015, 04:56 PM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 04 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= MAY 5, 2015 *
* Time= 16:41:33 *
* *
* USER ID: *
****************************************************

1. STAAD SPACE
INPUT FILE: Final.STD
2. START JOB INFORMATION
3. ENGINEER DATE 21-APR-15
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KN
7. JOINT COORDINATES
8. 28 0 5.4 5; 29 3 5.4 5; 30 0 1.8 0; 31 3 1.8 0; 32 8 1.8 0; 33 13 1.8 0
9. 34 18 1.8 0; 35 23 1.8 0; 38 23 1.8 5; 39 18 1.8 5; 40 0 1.8 5; 41 0 1.8 10
10. 42 3 1.8 10; 43 3 1.8 5; 44 8 1.8 5; 45 8 1.8 10; 46 13 1.8 10; 47 13 1.8 5
11. 48 18 1.8 10; 49 23 1.8 10; 57 0 5.4 0; 58 3 5.4 0; 59 8 5.4 0; 60 13 5.4 0
12. 61 18 5.4 0; 62 23 5.4 0; 63 24.8 5.4 0; 64 24.8 5.4 5; 65 23 5.4 5
13. 66 18 5.4 5; 67 0 5.4 10; 68 3 5.4 10; 69 8 5.4 5; 70 8 5.4 10; 71 13 5.4 10
14. 72 13 5.4 5; 73 18 5.4 10; 74 23 5.4 10; 75 0 5.4 11.8; 76 3 5.4 11.8
15. 77 8 5.4 11.8; 78 13 5.4 11.8; 79 18 5.4 11.8; 80 23 5.4 11.8; 81 24.8 5.4 10
16. 82 0 7.2 5; 83 3 7.2 5; 84 0 9 0; 85 3 9 0; 86 8 9 0; 87 13 9 0; 88 18 9 0
17. 89 23 9 0; 90 24.8 9 0; 91 24.8 9 5; 92 23 9 5; 93 18 9 5; 94 0 9 5; 95 0 9 10
18. 96 3 9 10; 97 3 9 5; 98 8 9 5; 99 8 9 10; 100 13 9 10; 101 13 9 5; 102 18 9 10
19. 103 23 9 10; 104 0 9 11.8; 105 3 9 11.8; 106 8 9 11.8; 107 13 9 11.8
20. 108 18 9 11.8; 109 23 9 11.8; 110 24.8 9 10; 111 0 10.8 5; 112 3 10.8 5
21. 113 0 12.6 0; 114 3 12.6 0; 115 8 12.6 0; 116 13 12.6 0; 117 18 12.6 0
22. 118 23 12.6 0; 119 24.8 12.6 0; 120 24.8 12.6 5; 121 23 12.6 5; 122 18 12.6 5
23. 123 0 12.6 5; 124 0 12.6 10; 125 3 12.6 10; 126 3 12.6 5; 127 8 12.6 5
24. 128 8 12.6 10; 129 13 12.6 10; 130 13 12.6 5; 131 18 12.6 10; 132 23 12.6 10
25. 133 0 12.6 11.8; 134 3 12.6 11.8; 135 8 12.6 11.8; 136 13 12.6 11.8
26. 137 18 12.6 11.8; 138 23 12.6 11.8; 139 24.8 12.6 10; 140 0 14.4 5
27. 141 3 14.4 5; 142 0 16.2 0; 143 3 16.2 0; 144 8 16.2 0; 145 13 16.2 0
28. 146 18 16.2 0; 147 23 16.2 0; 148 24.8 16.2 0; 149 24.8 16.2 5; 150 23 16.2 5
29. 151 18 16.2 5; 152 0 16.2 5; 153 0 16.2 10; 154 3 16.2 10; 155 3 16.2 5
30. 156 8 16.2 5; 157 8 16.2 10; 158 13 16.2 10; 159 13 16.2 5; 160 18 16.2 10
31. 161 23 16.2 10; 162 0 16.2 11.8; 163 3 16.2 11.8; 164 8 16.2 11.8
32. 165 13 16.2 11.8; 166 18 16.2 11.8; 167 23 16.2 11.8; 168 24.8 16.2 10
33. 171 0 18.9 0; 172 3 18.9 0; 173 8 18.9 0; 174 13 18.9 0; 175 18 18.9 0
34. 176 23 18.9 0; 177 24.8 18.9 0; 178 24.8 18.9 5; 179 23 18.9 5; 181 0 18.9 5
35. 182 0 18.9 10; 183 3 18.9 10; 184 3 18.9 5; 186 8 18.9 10; 187 13 18.9 10
36. 189 18 18.9 10; 190 23 18.9 10; 191 0 18.9 11.8; 192 3 18.9 11.8
37. 193 8 18.9 11.8; 194 13 18.9 11.8; 195 18 18.9 11.8; 196 23 18.9 11.8
38. 197 24.8 18.9 10; 198 0 21.6 0; 199 3 21.6 0; 200 8 21.6 0; 201 13 21.6 0
39. 202 18 21.6 0; 203 23 21.6 0; 204 24.8 21.6 0; 205 24.8 21.6 5; 206 23 21.6 5
40. 207 0 21.6 5; 208 0 21.6 10; 209 3 21.6 10; 210 3 21.6 5; 211 8 21.6 10

D:\__8th sem project\STAAD Pro\Final\Final.anl Page 1 of 778


Tuesday, May 05, 2015, 04:56 PM
STAAD SPACE -- PAGE NO. 2

41. 212 13 21.6 10; 213 18 21.6 10; 214 23 21.6 10; 215 0 21.6 11.8
42. 216 3 21.6 11.8; 217 8 21.6 11.8; 218 13 21.6 11.8; 219 18 21.6 11.8
43. 220 23 21.6 11.8; 221 24.8 21.6 10; 222 24.8 1.8 0; 223 24.8 1.8 5
44. 224 24.8 1.8 10; 225 0 3.6 5; 226 3 3.6 5; 227 0 1.8 11.8; 228 3 1.8 11.8
45. 229 8 1.8 11.8; 230 13 1.8 11.8; 231 18 1.8 11.8; 232 23 1.8 11.8
46. 233 0 2.38419E-007 0; 234 3 2.38419E-007 0; 235 8 2.38419E-007 0
47. 236 13 2.38419E-007 0; 237 18 2.38419E-007 0; 238 23 2.38419E-007 0
48. 239 23 2.38419E-007 5; 240 18 2.38419E-007 5; 241 0 2.38419E-007 5
49. 242 0 2.38419E-007 10; 243 3 2.38419E-007 10; 244 3 2.38419E-007 5
50. 245 8 2.38419E-007 5; 246 8 2.38419E-007 10; 247 13 2.38419E-007 10
51. 248 13 2.38419E-007 5; 249 18 2.38419E-007 10; 250 23 2.38419E-007 10
52. 251 0 -1.8 5
53. MEMBER INCIDENCES
54. 41 28 29; 107 30 57; 108 31 58; 109 32 59; 110 33 60; 111 34 61; 112 35 62
55. 115 38 65; 116 39 66; 117 40 225; 118 41 67; 119 42 68; 120 43 226; 121 44 69
56. 122 45 70; 123 46 71; 124 47 72; 125 48 73; 126 49 74; 136 57 58; 137 58 59
57. 138 59 60; 139 60 61; 140 61 62; 141 62 63; 142 64 65; 143 65 66; 144 66 61
58. 145 57 28; 146 28 67; 147 67 68; 148 68 29; 149 29 69; 150 69 70; 151 70 71
59. 152 71 72; 153 72 66; 154 66 73; 155 73 74; 156 74 65; 157 65 62; 158 58 29
60. 159 59 69; 160 69 72; 161 72 60; 162 67 75; 163 76 68; 164 68 70; 165 70 77
61. 166 78 71; 167 71 73; 168 73 79; 169 80 74; 170 74 81; 171 82 83; 172 82 28
62. 173 83 29; 174 57 84; 175 58 85; 176 59 86; 177 60 87; 178 61 88; 179 62 89
63. 182 65 92; 183 66 93; 184 28 94; 185 67 95; 186 68 96; 187 29 97; 188 69 98
64. 189 70 99; 190 71 100; 191 72 101; 192 73 102; 193 74 103; 201 82 111
65. 202 83 112; 203 84 85; 204 85 86; 205 86 87; 206 87 88; 207 88 89; 208 89 90
66. 209 91 92; 210 92 93; 211 93 88; 212 84 94; 213 94 95; 214 95 96; 215 96 97
67. 216 97 98; 217 98 99; 218 99 100; 219 100 101; 220 101 93; 221 93 102
68. 222 102 103; 223 103 92; 224 92 89; 225 85 97; 226 97 94; 227 86 98
69. 228 98 101; 229 101 87; 230 95 104; 231 105 96; 232 96 99; 233 99 106
70. 234 107 100; 235 100 102; 236 102 108; 237 109 103; 238 103 110; 239 111 112
71. 240 111 94; 241 112 97; 242 84 113; 243 85 114; 244 86 115; 245 87 116
72. 246 88 117; 247 89 118; 250 92 121; 251 93 122; 252 94 123; 253 95 124
73. 254 96 125; 255 97 126; 256 98 127; 257 99 128; 258 100 129; 259 101 130
74. 260 102 131; 261 103 132; 269 111 140; 270 112 141; 271 113 114; 272 114 115
75. 273 115 116; 274 116 117; 275 117 118; 276 118 119; 277 120 121; 278 121 122
76. 279 122 117; 280 113 123; 281 123 124; 282 124 125; 283 125 126; 284 126 127
77. 285 127 128; 286 128 129; 287 129 130; 288 130 122; 289 122 131; 290 131 132
78. 291 132 121; 292 121 118; 293 114 126; 294 126 123; 295 115 127; 296 127 130
79. 297 130 116; 298 124 133; 299 134 125; 300 125 128; 301 128 135; 302 136 129
80. 303 129 131; 304 131 137; 305 138 132; 306 132 139; 307 140 141; 308 140 123
81. 309 141 126; 310 113 142; 311 114 143; 312 115 144; 313 116 145; 314 117 146
82. 315 118 147; 318 121 150; 319 122 151; 320 123 152; 321 124 153; 322 125 154
83. 323 126 155; 324 127 156; 325 128 157; 326 129 158; 327 130 159; 328 131 160
84. 329 132 161; 339 142 143; 340 143 144; 341 144 145; 342 145 146; 343 146 147
85. 344 147 148; 345 149 150; 346 150 151; 347 151 146; 348 142 152; 349 152 153
86. 350 153 154; 351 154 155; 352 155 156; 353 156 157; 354 157 158; 355 158 159
87. 356 159 151; 357 151 160; 358 160 161; 359 161 150; 360 150 147; 361 143 155
88. 362 155 152; 363 144 156; 364 156 159; 365 159 145; 366 153 162; 367 163 154
89. 368 154 157; 369 157 164; 370 165 158; 371 158 160; 372 160 166; 373 167 161
90. 374 161 168; 378 142 171; 379 143 172; 380 144 173; 381 145 174; 382 146 175
91. 383 147 176; 386 150 179; 388 152 181; 389 153 182; 390 154 183; 391 155 184
92. 393 157 186; 394 158 187; 396 160 189; 397 161 190; 407 171 172; 408 172 173
93. 409 173 174; 410 174 175; 411 175 176; 412 176 177; 413 178 179; 416 171 181
94. 417 181 182; 418 182 183; 419 183 184; 422 186 187; 426 189 190; 427 190 179
95. 428 179 176; 429 172 184; 430 184 181; 434 182 191; 435 192 183; 436 183 186
96. 437 186 193; 438 194 187; 439 187 189; 440 189 195; 441 196 190; 442 190 197

D:\__8th sem project\STAAD Pro\Final\Final.anl Page 2 of 778


Tuesday, May 05, 2015, 04:56 PM
STAAD SPACE -- PAGE NO. 3

97. 443 171 198; 444 172 199; 445 173 200; 446 174 201; 447 175 202; 448 176 203
98. 451 179 206; 452 181 207; 453 182 208; 454 183 209; 455 184 210; 456 186 211
99. 457 187 212; 458 189 213; 459 190 214; 467 198 199; 468 199 200; 469 200 201
100. 470 201 202; 471 202 203; 472 203 204; 473 205 206; 474 198 207; 475 207 208
101. 476 208 209; 477 209 210; 478 211 212; 479 213 214; 480 214 206; 481 206 203
102. 482 199 210; 483 210 207; 484 208 215; 485 216 209; 486 209 211; 487 211 217
103. 488 218 212; 489 212 213; 490 213 219; 491 220 214; 492 214 221; 493 200 211
104. 494 201 212; 495 202 213; 499 225 28; 500 82 225; 501 226 29; 502 83 226
105. 503 40 43; 504 30 31; 505 31 32; 506 32 33; 507 33 34; 508 34 35; 509 35 222
106. 510 223 38; 511 38 39; 512 41 42; 513 43 44; 514 45 46; 515 47 39; 516 48 49
107. 517 44 47; 518 42 45; 519 46 48; 520 49 224; 521 225 226; 522 28 40; 523 29 43
108. 530 39 34; 531 30 40; 532 40 41; 533 42 43; 534 44 45; 535 46 47; 536 39 48
109. 537 49 38; 538 38 35; 539 31 43; 540 32 44; 541 47 33; 542 41 227; 543 228 42
110. 544 45 229; 545 230 46; 546 48 231; 547 232 49; 548 30 233; 549 31 234
111. 550 32 235; 551 33 236; 552 34 237; 553 35 238; 554 38 239; 555 39 240
112. 556 40 241; 557 41 242; 558 42 243; 559 43 244; 560 44 245; 561 45 246
113. 562 46 247; 563 47 248; 564 48 249; 565 49 250
114. DEFINE MATERIAL START
115. ISOTROPIC CONCRETE
116. E 2.17185E+007
117. POISSON 0.17
118. DENSITY 23.5616
119. ALPHA 1E-005
120. DAMP 0.05
121. END DEFINE MATERIAL
122. MEMBER PROPERTY INDIAN
123. 41 136 TO 171 203 TO 239 271 TO 307 339 TO 374 407 TO 413 416 TO 419 422 426 -
124. 427 TO 430 434 TO 442 467 TO 495 503 TO 521 530 TO 547 PRIS YD 0.5 ZD 0.3
125. 107 TO 112 115 TO 126 172 TO 179 182 TO 193 201 202 240 TO 247 250 TO 261 -
126. 269 270 308 TO 315 318 TO 329 378 TO 383 386 388 TO 391 393 394 396 397 443 -
127. 444 TO 448 451 TO 459 499 TO 502 522 523 548 TO 565 PRIS YD 0.45 ZD 0.45
128. CONSTANTS
129. MATERIAL CONCRETE ALL
130. SUPPORTS
131. 233 TO 250 FIXED
132. DEFINE 1893 LOAD
**WARNING- JOINT NO. 251 NOT CONNECTED. OK, IF PART OF MASTER/SLAVE.
**WARNING- THIS STRUCTURE IS DISJOINTED. IGNORE IF
MASTER/SLAVE OR IF UNCONNECTED JOINTS.
133. ZONE 0.36 RF 5 I 1.5 SS 2 ST 1 DM 0.05 DT 1.8
134. SELFWEIGHT 1
135. FLOOR WEIGHT
**WARNING** about Floor/OneWay Loads/Weights.
Please note that depending on the shape of the floor you may
have to break up the FLOOR/ONEWAY LOAD into multiple commands.
For details please refer to Technical Reference Manual
Section 5.32.4 Note 6.

136. YRANGE 1.7 1.9 FLOAD -10.17 XRANGE 0 24.8 ZRANGE 0 11.8
137. YRANGE 5.3 5.5 FLOAD -10.73 XRANGE 0 24.8 ZRANGE 0 11.8
138. YRANGE 8.9 9.1 FLOAD -10.73 XRANGE 0 24.8 ZRANGE 0 11.8
139. YRANGE 12.5 12.7 FLOAD -10.73 XRANGE 0 24.8 ZRANGE 0 11.8
140. YRANGE 16.1 16.3 FLOAD -10.73 XRANGE 0 24.8 ZRANGE 0 11.8
141. YRANGE 18.8 19 FLOAD -1.67 XRANGE 0 24.8 ZRANGE 0 11.8
142. YRANGE 21.5 21.7 FLOAD -10.59 XRANGE 0 24.8 ZRANGE 0 11.8
143. LOAD 1 LOADTYPE SEISMIC TITLE EQ X

D:\__8th sem project\STAAD Pro\Final\Final.anl Page 3 of 778


Tuesday, May 05, 2015, 04:56 PM
STAAD SPACE -- PAGE NO. 4

NOTE : FOR SOFT STORY CHECKING WRITE "CHECK SOFT STORY" AT THE
END OF LOADING UNDER DEFINE 1893 LOAD DEFINITION.

144. 1893 LOAD X 1


145. LOAD 2 LOADTYPE SEISMIC TITLE EQ Z
146. 1893 LOAD Z 1
147. LOAD 3 LOADTYPE LIVE REDUCIBLE TITLE LIVE
148. FLOOR LOAD
149. YRANGE 1.7 1.9 FLOAD -4 XRANGE 0 24.8 ZRANGE 0 11.8 GY
150. YRANGE 5.3 5.5 FLOAD -4 XRANGE 0 24.8 ZRANGE 0 11.8 GY
151. YRANGE 8.9 9.1 FLOAD -4 XRANGE 0 24.8 ZRANGE 0 11.8 GY
152. YRANGE 12.5 12.7 FLOAD -4 XRANGE 0 24.8 ZRANGE 0 11.8 GY
153. YRANGE 16.1 16.3 FLOAD -4 XRANGE 0 24.8 ZRANGE 0 11.8 GY
154. YRANGE 21.5 21.7 FLOAD -1.5 XRANGE 0 24.8 ZRANGE 0 11.8 GY
155. LOAD 4 LOADTYPE DEAD TITLE DEAD
156. FLOOR LOAD
157. YRANGE 1.7 1.9 FLOAD -5.75 XRANGE 0 24.8 ZRANGE 0 11.8 GY
158. YRANGE 5.3 5.5 FLOAD -5.75 XRANGE 0 24.8 ZRANGE 0 11.8 GY
159. YRANGE 8.9 9.1 FLOAD -5.75 XRANGE 0 24.8 ZRANGE 0 11.8 GY
160. YRANGE 12.5 12.7 FLOAD -5.75 XRANGE 0 24.8 ZRANGE 0 11.8 GY
161. YRANGE 16.1 16.3 FLOAD -5.75 XRANGE 0 24.8 ZRANGE 0 11.8 GY
162. YRANGE 21.5 21.7 FLOAD -1.5 XRANGE 0 24.8 ZRANGE 0 11.8 GY
163. MEMBER LOAD
164. 467 TO 471 474 TO 476 478 480 481 486 UNI GY -6.25
165. 339 TO 343 348 407 TO 411 416 UNI GY -13.75
166. 136 TO 140 145 203 TO 207 212 271 TO 275 280 504 TO 508 531 UNI GY -19.375
167. LOAD 5 LOADTYPE DEAD TITLE SELF WEIGHT
168. SELFWEIGHT Y -1 LIST 41 107 TO 112 115 TO 126 136 TO 179 182 TO 193 -
169. 201 TO 247 250 TO 261 269 TO 315 318 TO 329 339 TO 374 378 TO 383 386 388 -
170. 389 TO 391 393 394 396 397 407 TO 413 416 TO 419 422 426 TO 430 434 TO 448 -
171. 451 TO 459 467 TO 495 499 TO 523 530 TO 565
172. LOAD COMB 6 1.5(DL+LL)
173. 3 1.5 4 1.5
174. LOAD COMB 7 1.5(DL+ELX)
175. 4 1.5 1 1.5
176. LOAD COMB 8 1.5(DL-ELX)
177. 4 1.5 1 -1.5
178. LOAD COMB 9 1.5(DL+ELZ)
179. 2 1.5 4 1.5
180. LOAD COMB 10 1.5(DL-ELZ)
181. 4 1.5 2 -1.5
182. LOAD COMB 11 1.2(DL+LL+ELX)
183. 1 1.2 3 1.2 4 1.2
184. LOAD COMB 12 1.2(DL+LL-ELX)

D:\__8th sem project\STAAD Pro\Final\Final.anl Page 4 of 778


Tuesday, May 05, 2015, 04:56 PM
STAAD SPACE -- PAGE NO. 5

185. 3 1.2 4 1.2 1 -1.2


186. LOAD COMB 13 1.2(DL+LL+ELZ)
187. 2 1.2 3 1.2 4 1.2
188. LOAD COMB 14 1.2(DL+LL-ELZ)
189. 3 1.2 4 1.2 2 -1.2
190. LOAD COMB 15 0.9DL+1.5ELX
191. 4 0.9 1 1.5
192. LOAD COMB 16 0.9DL-1.5ELX
193. 4 0.9 1 -1.5
194. LOAD COMB 17 0.9DL+1.5ELZ
195. 4 0.9 2 1.5
196. LOAD COMB 18 0.9DL-1.5ELZ
197. 4 0.9 2 -1.5
198. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 210/ 375/ 18

SOLVER USED IS THE IN-CORE ADVANCED SOLVER

TOTAL PRIMARY LOAD CASES = 5, TOTAL DEGREES OF FREEDOM = 1152

**WARNING: IF THIS UBC/IBC ANALYSIS HAS TENSION/COMPRESSION


OR REPEAT LOAD OR RE-ANALYSIS OR SELECT OPTIMIZE, THEN EACH
UBC/IBC CASE SHOULD BE FOLLOWED BY PERFORM ANALYSIS CHANGE.

ZERO STIFFNESS IN DIRECTION 1 AT JOINT 251 EQN.NO. 1147


LOADS APPLIED OR DISTRIBUTED HERE FROM ELEMENTS WILL BE IGNORED.
THIS MAY BE DUE TO ALL MEMBERS AT THIS JOINT BEING RELEASED OR
EFFECTIVELY RELEASED IN THIS DIRECTION.
ZERO STIFFNESS IN DIRECTION 2 AT JOINT 251 EQN.NO. 1148
ZERO STIFFNESS IN DIRECTION 3 AT JOINT 251 EQN.NO. 1149
ZERO STIFFNESS IN DIRECTION 4 AT JOINT 251 EQN.NO. 1150
ZERO STIFFNESS IN DIRECTION 5 AT JOINT 251 EQN.NO. 1151
ZERO STIFFNESS IN DIRECTION 6 AT JOINT 251 EQN.NO. 1152

*********************************************************
* *
* TIME PERIOD FOR X 1893 LOADING = 0.79795 SEC *
* SA/G PER 1893= 1.704, LOAD FACTOR= 1.000 *
* FACTOR V PER 1893= 0.0893 X 20384.42 *
* *
*********************************************************

D:\__8th sem project\STAAD Pro\Final\Final.anl Page 5 of 778


Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 66

STAAD Pro 3D Model

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 67

STAAD Pro 3D Model

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 68

STAAD Pro Load Details

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 69

STAAD Pro Load Details

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 70

STAAD Pro Load Cases

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 71

STAAD Pro Maximum Moments in Beams

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 72

STAAD Pro Reactions at Supports

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 73

STAAD Pro Reactions at Supports

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 74

STAAD Pro Beam Design

(Top floor 5m span)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 75

STAAD Pro Beam Design

(Top floor Cantilever)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 76

STAAD Pro Beam Design

(Top floor 10m span)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 77

STAAD Pro Beam Design

(Ground floor 5m span)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 78

STAAD Pro Beam Design

(Ground floor 3m span)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 79

STAAD Pro Beam Design

(Ground floor Cantilever)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 80

STAAD Pro Column Design

(Top floor)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 81

STAAD Pro Column Design

(Ground floor)

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 82

Conclusion

In the project “Analysis and Design of Multi-Storied Shopping Mall cum Multiplex
Cinema Hall”, a structure of five storeys is planned, analysed and designed.. The load
calculation is done to find out the load on beams, columns and footings. The frame is
analyzed using Moment Distribution method. For Earthquake analysis, the method adopted
here is the approximate method (Portal Method). By combination of moments, the final
moments that are acting on the beams and columns are found out. The design of various
components such as slabs, beams, columns, staircases etc. is done by Limit state Method of
Design. The detailing finally shows the schematic diagrams for the placement of
reinforcement in the various components.

IS Codes and Aids are used as per requirement. IS 456:2000 for Reinforced Concrete
Design, IS 1893:2002 for Earthquake Load Analysis, IS 875:1987 for Load details, SP
16:1980 for Steel requirements and IS 13920:1993 for Ductile detailing is used.

The detailing of the structural elements is done using AutoCAD. Finally the manual
analysis and design is compared with the result obtained from STAAD Pro. The variation of
results obtained from manual design and STAAD Pro are minimal. However the little
variations are found due to application of approximate method (Portal Method) for analysis
of earthquake loads.

A comparative study is done between manual analysis and design with STAAD Pro
results. The design is finalised based on both manual analysis and STAAD Pro results for
bending moments, shear forces, supports reactions etc. The design and detailing of the
structures are finalised based on manual design only.

Department of Civil Engineering


National Institute of Technology, Silchar
Analysis and Design of Multi-Storied Shopping Mall cum Multiplex Cinema Hall 83

References
1. Varghese P.C.; Limit State Design of Reinforced Concrete
2. Reddy C.S.; Basic Structural Analysis[ 3rd Edition]
3. IS 1893: 2002: Criteria for Earthquake Resistant Design of Structures
4. IS 456:2000: Plain an Reinforced Concrete- Code of Practice
5. IS 875(part 1):1987: Code for practice for design loads (other than earthquake) for
buildings and structures
6. SP 16:1980: Design Aids for Reinforced Concrete to IS 456:1978 [CED 2: Cement
and Concrete]
7. IS 13920:1993: Ductile detailing of reinforced concrete structures subjected to
seismic forces - Code of practice [CED 39: Earthquake Engineering]
8. 7th Semester B.Tech project, Analysis And Design Of Six Storied Residential
Building
9. Vazirani V.N.; Analysis Of Structures (Vol. 2)

Department of Civil Engineering


National Institute of Technology, Silchar

You might also like