DOCUMENT TITLE:

PHOTOLOG
Nobel Company: Prokon LLC

Site address: HAOR

Assessment dates: 23-24 November, 2021

Assessors: M. Gasimov-Glensol QHSE Manager; K.Afandiyev-QHSE Specialist

1. POSITIVE 2. POSITIVE

Equipment. Generator was provided with grounding and Working at height. Safety harness and lanyard was
have FE, Spill kit and properly safety sign near of it used properly. Shock observer was deactivated
according to low height from 6 meter

3. POSITIVE 4. POSITIVE
DOCUMENT TITLE:

Manual handling/Ergonomic. Manual handling


minimizing equipment

Confined space. Properly access/egress, anchor point


for evacuation and warning signs
5. POSITIVE 6. POSITIVE

Lifting operation. Operation area was barricaded and Rescue equipment storage. All equipment was
provided warning signs certificated and quarterly inspected
7. POSITIVE 8. POSITIVE

Chemical Substances Storage. HAZMAT storage. Lifting operation. FLT operation was carried out with
Provided with COSHH Matrix (dual languages), drip trays, flagman. Back signal available
fan, eye wash, spill kit and FE. The temperature and humidity
are monitored on the daily basis. Records are maintained . SDSs
are available in the storages.

9. NEGATIVE 10.NEGATIVE
PPE. Welder worked on man basket without apron Waste. Poor waste management.
against spark
11. NEGATIVE 12. NEGATIVE

Sewage water. Sewage water spilled around Electrical. Poor cable management
containers. In interview process workers said it
happen 2 day ago, but sewage water still stayed here