Subject Name & Code Advance Construction Techniques 3 CEN 102 Student Name Dwij Vipulkumar Jani Deep Narsinhbhai Patel Enrollment Number

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 33

Subject Name & Code Student Name Enrollment

ADVANCE Dwij Vipulkumar Jani Number


CONSTRUCTION Deep Narsinhbhai patel
TECHNIQUES
3 CEN 102
Submitted To Due date:
04/ December/
Prof. A. S. Patel 2020
PG Coordinator (CEM)
Ganpat University – U. V. Patel College of Engineering

Assignment Number 1 Preparation of job layout


M.TECH. CONSTRUCTION ENGINEERING & MANAGEMENT
2020-2022

Declaration of originality:
We hereby declare that the report submitted by us is an outcome of our teamwork and
original work. We have duly acknowledged all the sources from which the ideas and
extracts have been taken. The report is free from any plagiarism, and we take full
responsibility of the content of this report.

Signature of Student: Dwij Jani


Deep patel
Date:04/11/2020

Department of Civil Engineering


U. V. Patel College of Engineering
Ganpat University – U. V. Patel College Of Engineering
Kherva – Mehsana-Gujarat
II
EXECUTIVE SUMMARY

 The purpose of this report to enhancing the job layout of the


Residential hub is easy to access all the activity.
 In this project we are discussing about basic layout of this site.
What are the problem present in job layout, what are the
disadvantages in this site.
 And also we provide a new job layout according to a construction
area. And also discuss about problems in layout.

BACKGROUND

 Our project is criticizing a job layout of Residential Buildings area


in “Himatnagar Hadiyol NH48”. Site Name = Shree Ananta
 We had including Entry point, Exit point, Storage are of the
materials bricks cement sand aggregate, temporary services
washing and toilets. Contractor site office. Area of keeping
equipment such as mixture. Bar bending area, labor housing.

Project Details
 Our project shree Ananta is located at the hadiyol Road,
Himatnagar, Gujarat.
 Area of the residential area is 3 Acres.

III
1) INTRODUCTION ABOUT JOB LAYOUT

 what is job layout


 Facilities should be covered in job layout
 Purpose of job layout

2) GENERAL INFORMATION ABOUT SITE

3) LAYOUT OF THE SITE AREA

 Safety:
 Site Accessibility
 Information Signs
 Security
 Accommodation
 Offices
 Water Supply and Sanitation
 Material Handling
 Storage and site cleaning
 Craft Change-Houses
 Batch plant and Fabrication Shops
 Labor colony at the site
 Engineers and contractor office

4) PROPOSED LAYOUT OF THE SITE AREA


 Material position
 Steel position
 Labor colony
1)INTRODUCTION ABOUT JOB LAYOUT
IV
 what is job layout.
 A job layout is prepared to promise that work
proceeds smoothly without any obstraction. The
various construction resources. Such as material,
men, machinery etc. should be arranged insuch a
way that to achive optimal utilization of space.
 The larger and more complex greater will be the
need for planned job layout and detailing at the
site. And job layout can be defined as a site
drawung of the proposed construction showing
the location of entry and exit, temporary services,
material stores and stocks, plant or equipment
and site offices.

 Facilities should be covered in job layout


Group 1
1) Site office
2) Booking office
3) Subcontractor office
4) First aid and medical room
5) Toilet on site
6) Labor quarter
7) Guard room
Group 2
1) Toilet on site
2) Carpentry shop
3) Water tank
4) Scaffolding storage.
Group 3
1) Cement warehouse
2) Batching plant and aggregate storage
Group 4
1) Toilet on site
2) Staff and engineer quarter
Group 5

V
1) Bar bending shop
2) Fabricated rebar storage yard
Group 6
1) Testing lab
2) Material storage lab

Group 7
1) Equipment maintenance room
2) Parking for machines
Group 8
1) Canteen
2) Toilet on site.
Others
1) Internal Road
2) Electric Poles.

2)

VI
 Purpose of job layout

 To save time in delivering construction material at the site of


construction.
 To keep the lead of cartage minimum, so that cartage expense may be
minimum.
 To safeguard construction material from damage and deterioration.
 To adopt the best mode of working.
 To complete the work with minimum use of equipment and machinery.
 To lake maximum output from labor and machinery.
 To provide saftey to the worker.
 To avoid damage due to construction activities to the nearby properties.
 To common use material as fine and coarse aggregate should be stored
near each other.
 To stored construction material as near place.

VII
2) GENERAL INFORMATION ABOUT SITE

 This construction site is located at Hadiyol Road


Himatnagar NH48. This site name is Shree Ananta. Made
by Shree Developers.
 In this site there are different category PLATINUM,
GOLD, SILVER. As per ploat area.
 This site is about 3 ACRES.
 In this site there are about 128 plots. 6 common plots.

 Amenities:
VIII
 Compound wall
 C.C Road
 Led street lights
 Garden and common plot
 Under ground GEB cables
 Attractive entry gate with security cabin
 Water facility 24 hours
 CCTV Camera

3)LAYOUT OF THE SITE AREA

IX
1) Safety:
 Fire prevention Fire is a major causes of the damage on
construction sites. So that fire extingunishes are basic
requirement in aconstruction project.
2) Site accessibility:
 Easy accessibility will keep the morals of the equipment
and vehicle drivers higt, minimize the chance of the
accident and save the time in th emaneuvering o the
arrive at an dleavers the project.
 In case of the large projects, proper planning is required
to layout the roads leading from the nearest highway.
Internak road are necessary for easy flow of work.
 Also parking lots are provided for the owner, office, and
crafts personnel but this facility must be planned where
space does exist.

3) Information sign:

 Site map: It should locate details of the project, and displayed in the
office of the site superintendent or project manager and posted at the
entrance gate.
 Traffice regulatory sign: For large projects, traffic regulatory signs help in
guiding the traffic on the site and avoid accidents to a considerable
extent.
 Display of the labours policy and safety rules: This will help in eliminating
disputes between labor and management.
 Emergency routers and underground services: It is important to display
the emergency escape routes on every floor as the building progresses.
Locations of underground services should be marked to prevent its
damage.
X
4)Security:
 Enterance it is necessary to have guard entrance to the site provided
by a booth. Also it is necessary to keep track of all visitiors to the
project.
 Lighting it is necessary to have standby generator to maintainsite
lighting.
 Fencing the boundary should be fenced off from a security point of
view.

5)Accommodation:
 On the large construction it is necessary to provide camp
accommodation for all type of staff innvolved in yhe project.

6)Offices:
 The office should be closs together close to the site and in a safe
area. Also provide office equipment. The office at the site may
include job office, general contractor office, sub-contractor and
consultant offices.

7)Water supply and sanitation:


 It is necessary to have water and toilets facilities in convient
location to accommodate the work force.

8) Material handeling:
 One third or more of all construction operations can be classified
as material handeling. The use of the proper equipment for the
material handeling and advanceplanning for minizing handling will
results in direct cost and time savings.

9) storage and site cleaning:

XI
 Laydown areas Areas reservd for Storage of the large material and
equipment and it can be short term or long term.
 Warehouse: They are shelted storage facilites where materials are
stored until they have disbursed to the job.
 Materials staging area: They used when materials are stored near the
work on a short term basis. They are generally as close to work as
possible.
 Site cleaning: It is necessary at a work place and espicially where the
extent of debries produced is high. Regular disposal of debries is
necessary.

10) craft change houses:


 Craft change houses provided sheltered space for the craft
personnel to change and stored cloths, wash, and rest during
waiting periods.

11) Batch plant and fabrication shops:


 Batch plants are provided on project where it is more ecnomical to
the producer concrete on site then to buy a ready mix. Aggregate
storage piles, cement silos, and admixture tanks will accompany an
on sute batch plant. Shops are used where materials and
equipment are fabricated on site. The includes electrical,
mechanical, carpentry, and paint shope. Also testing shopes used
to houses the necessary testing equipment and personnel for the
project.

12) Labour colony at the site:


 Quality accommodation of the workers is crucial to the succes os
construction projects many of which are in remote location. States
provides excellent labour colony solution accorfing to specifies
requirement.
 We keep in mind all the necessary factors required to make your
labours and managers on the site comfortale. We have executed

XII
varios projects in remote areas and highly experienced with the
necessary technical experiences.

13) Engineers and contractor offices:


 We provide the engineer offices at the middle of the site so that they can easily
see the works of construction site.
 And the contractor office is located at the side of main office.
 There should be located preferbly in a noise free are for better co-ordination.

4)PROPOSED LAYOUT OF THE SITE AREA

 Material position:
 It is very important to un load the material to the
nearist and at the centre of the site, so the labours
are commonly used the material and easy to work,
that can save the time of constructio.
 For the material we provide the steel yard, cement
storage, aggregate storage and also when some
emergency the storage full then we also unload the
material to the emergency storage.

 Steel position:
 Steel is very important in the construction
work so, we stored the steel at maximum
numbers and we stored in the steel yard.
 For the cutting of bar. we provide the steel
working unit from the 10mt from the steel
yard.

XIII
 Steel storage is at the centre of the
construction site so that labours are easily
used.
 Labor colony:
 Labor colony for onsite labors, staff, site office
as per given site location.
 The size is decided so that after the
construction is over we can dismantle.

AREA:

Plot Area 3 Acres


Construction Area 9151.939sqmt
Steel Yard 20mt
Labor Colony Required by the labor
10mt
Common plot 2988.63sqmt

XIV
F.S.I:
Permissible F.S.I ( 1.1) = 12140.569sqm
Utilized F.S.I = 12140sqm

Rate of the labours:


 900 RS per sq ft with materials and labors.

Traffic situation:
 This traffic survey is done by the morning 8 to 10 am and
evening 5 to 6 pm.

VEHICLES TYPES NO OF VEHICLES


2W 1500+1300=2800
3W 589+225=814
4W 850+588=1438
BUS AND 200+150=350
TRUCKS
TOTAL 5402

XV
DISTANCE FROM MAJORITY WANDORS:
 The average distance from site to the wandors is about
2 to 2.5km.

pictures of all the activity:


 pile foundation:

XVI
XVII
XVIII
XIX
XX
Labor colony:

XXI
XXII
Discussing with site engineer:

XXIII
XXIV
XXV
XXVI
XXVII
XXVIII
XXIX
XXX
XXXI
XXXII
XXXIII