Sabo System pada Sungai Matakabo

RENCANA AS BANGUNAN BANGUNAN SABO PADA SUNGAI MATAKABO


UNTUK DASAR SUURVEY TOPOGRAFI, PENGAMBILAN SAMPEL SEDIMEN DAN PENGUKURAN DEBIT SUNGAI

N NAMA SABO PERKIRAAN L PERKIRAAN H MERCU JARAK ( ± )


o (m) (m)
        KE km
1 SB-1, WAY SOL ± 105 - 117 ± 6 -7 SB 2, WAY BEMES ± 2,87 - 5,946
           
2 SB-2, WAY BEMES ± 65,59 - 133,49 ±3-9 SB-1, WAY SOL ± 2,87 - 5,946
        SP -1 , WAY INES ± 3,85 - 5,81
           
3 SB-3, WAY MOL ± 102,21 - 128,3 ±5-8 SP-2, WAY INES ± 3,74 - 5,76
           
4 SB-4, WAY SOP ± 107,92 - 129,83 ± 6,5 -7,5 SP-2, WAY JANA ± 2,285 - 3,017
           
5 SP 1, WAY INES ± 148,69 - 180,26 ± 6,5 -7 SB-3, WAY MOL ± 3,74 - 5,76
        SB-2, WAY BEMES ± 3,85 - 5,81
        SP-2, WAY JANA ± 3,032 - 3,681
           
6 SP-2 WAY JANA ± 217,71 ± 6,5 -7 SB-4, WAY SOP ± 2,285 - 3,017
        SP 1, WAY INES ± 3,032 - 3,681
        Bendung Matakabo ± 1,489
           
7 GROUNDSILL ± 75 ± 2,5 - 3 Jembatan Matakabo ± 201,4

KOORDINAT AS SABO RENCANA DI SUNGAI MATAKABO


NO NAMA KODE SABO STA BATAS KIRI BATAS KANAN
        X Y X Y
               
1 WAY SOL SABO DAM 1 (SB-1) P8 + 00 635754,708 9648697,183 635953,7 9648690,983
               
2 WAY BEMES SABO DAM 2 (SB-2) P43+ 00 635321,572 9651572,095 635453,301 9651643,008
               
3 WAY MOL SABO DAM 3 (SB-3) P81+50 633159,55 9654389,27 633229,059 9654388,68
               
4 WAY SOP SABO DAM 4 (SB-4)   631071,0009 9656606,025 631156,0134 9656599,96
               
5 WAY INES SAND POCKET 1 (SP-1) P106+00 632611,44 9656337,57 632734,93 9656414,34
               
6 WAY JANA SAND POCKET 2 (SP-2) P139+00 630941,84 9658845,15 630991,633 9658906,69
               
7 GROUNDSILL GROUNDSILL (GS) P205+50 629353,131 966420,817 629394,05 9664189,25
DAS pada Sungai Matakabo
NO NAMA KODE SABO DAS LUAS DAS
        (km2)
         
1 WAY SOL SABO DAM 1 (SB-1) M1 + M2 44,841
         
2 WAY BEMES SABO DAM 2 (SB-2) M1+M2+(M3/2) 57,338
         
3 WAY MOL SABO DAM 3 (SB-3) M1+M2+M3+M4+(M5/2) 114,4875
         
4 WAY SOP SABO DAM 4 (SB-4) M8 28,661
         
SAND POCKET 1 (SP-
M1+M2+M3+M4+M5+M6+(M7/3)
5 WAY INES 1) 122,7496667
         
SAND POCKET 2 (SP- M1+M2+M3+M4+M5+M6+M7+M8+
6 WAY JANA 2) (M9/4) 158,1825
         
GROUNDSIL
M1+M2+M3+M4+M5+M6+M7+M8+M9
7 L GROUNDSILL (GS) 173,61

Tabel Luas DAS pada bangunan bangunan sabo


Peta sebaran sedimen pada SB -1

Peta sebaran sedimen pada SB - 2

Peta sebaran sedimen pada SB - 3

Area yang tergenang banjir pada S. Matakabo


Peta sebaran sedimen pada SB - 4

SP-1 P139+400
Peta sebaran sedimen pada SP - 1

SP-2 P106+00
Peta sebaran sedimen pada SP - 2
Peta sebaran sedimen pada Grounsill

TABEL VOLUME TAMPUNGAN SEDIMEN BANGUNAN


BANGUNAN SABO DI SUNGAI MATAKABO

VOLUME
NO KODE SABO STA
SEDIMEN
(m3)
1 SB - 1 P8 + 00 296.896,60
2 SB -2 P43 + 00 82.609,07
3 SB - 3 P81 + 50 551.049,90
4 SB - 4 P15 + 00 98.697,86
5 SP - 1 P106 + 00 308.190,70
6 SP - 2 P139 + 00 347.437,20
7 GS P205 + 50 7.660,46

Total volume tampungan sedimen 1.692.541,79