Table-1: Price Quotation For Geotechnical Investigation of G+9 For Multipurpose Building and Basement Client

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Table-1: Price Quotation for Geotechnical Investigation of G+9 for Multipurpose Building and Basement

Client :

Item No. Description Unit Qty Unit Price Contract Amount (Birr) Remark
A. FIELD WORK

Mobilization and Demobilization of One drilling rig with all


1 Ls 1 200,000.00 200,000.00
facilities, accessories & crew

2 Inter borehole movement & setup of the drilling equipment No. 3 1,200.00 3,600.00

Sub Total A

B. CORE DRILLING

1 Drilling up to 15m depth in soil and rock formation m 45 1200 54000

2 Drilling from 15m -25m depth in soil and rock formation m 45 1500 67500

3 Drilling from 25m -40m depth in soil and rock formation m 1 1986 Rate only

4 SPT Test m 30 450 13500

5 Undisturbed soil sample m 18 100 1800

6 Ground water level measurement No. 3 200 600

7 Rock core sampling No. 6 50 300

8 Disturbed soil sampling No. 20 100 2000

9 Core box and photographing No. 15 1100 16500

Sub Total B 359,800.00

C. Laboratory Testing

1 Grain size Analysis No. 30 250 7500


2 Attberg Limits No. 30 250 7500
3 Free swell No. 6 350 2100
4 Moisture Content No. 30 250 7500
6 Unconfined compressive strength for cohesive soil No. 6 550 3300

7 Soluble sulphate and chloride content in soil/water No. 6 600 3600


9 Specific gravity in soil No. 6 180 1080
10 Water absorption of rock (if encountered ) No. 6 180 1080
11 Consolidation No. 3 1650 4950

12 Unconfined compressive strength of rock (if encountered) No. 6 568 3408

Sub Total C 42,018.00


Technical report including borehoe logs, laboratory test results
1 Sub Total D 38,956.00
and foundation recommendations (3 copies)
Sub Total A+ B+C+D 440,774.00
15% VAT 66,116.10
Grand Total 506,890.10
Notes: 1. Access road and platform preparation is the responsibility of the client.
2. The final price will be adjusted up on the actual work done.