Professional Documents
Culture Documents
TTE WaterProofing Note - 1
TTE WaterProofing Note - 1
TSEHAY TECH
ENGINEERING critical, yet neglected concerns, be- methods, the choice of which should
cause of the less exposure to con- take all of the relevant pro-
WATERPROOFING &
EPOXY FLOORING crete technology. The right time to do ject requirements into consideration.
waterproofing is the first time. >90%
Tsehay Tech Engineering is able to
of waterproofing failures are caused
offer a complete solution in all cir-
by errors in workmanship.
cumstances.
One should cautious that failure or
External Waterproofing System
defects in waterproofing could cause
reduction STRUCTURAL PERFOR-
MANCE of RC elements.