REQUISITION STATUS

Mezzanine Floor

Date: 12/17/2021

MRF Received

Date Req'd Description Unit Status


To be
No. Date Unit Qty Date Balance
procured

1 2 3 4 5 6 7 8 9 10 11
2778 27-Mar-04 27-Mar-04 Expansion bolt M10 x 60 set 500 set 500 29-Mar-04 - rec'd
2850 6-Apr-04 6-Apr-04 Countersunk self-drilling srew 3mmx15mmL ea 8000 ea 8000 07-Apr-04 - rec'd
yet to
2852 6-Apr-04 ASAP Sub-contractor for fitting doors Ls 1 1
receive
yet to
2852 6-Apr-04 ASAP Sub-contractor for fitting windows Ls 1 1
receive
yet to
2852 6-Apr-04 ASAP Sub-contractor for installing Air-Conditioners Ls 1 1
receive
yet to
2852 6-Apr-04 ASAP Sub-contractor for Toilet Work Ls 1 1
receive
yet to
2852 6-Apr-04 ASAP Sub-contractor for installing Fire-Smoke alarm system Ls 1 1
receive
yet to
2858 6-Apr-04 ASAP Hardiflex Pannel Boards, Size: 8' x 4' x 4.5mmthk. m2 1002.24 1,002
receive
yet to
2858 6-Apr-04 ASAP Superlone Nitrile Rubber Tape 48mmW, 3mmthk., 9mtr/Roll Roll 100 100
receive
Lanilus Rockwool Slab, Density: 100Kgs/m3, yet to
2858 6-Apr-04 ASAP m2 999.36 999
Size: 600x1200, Thk. 100mm receive
yet to
2858 6-Apr-04 ASAP Rockwool slap clip ea 1000 1,000
receive
Galvanized sheet yet to
2858 6-Apr-04 ASAP Sheet 10 10
Size: 1000x2000x1.5mm receive
yet to
2860 6-Apr-04 ASAP PVC Rigid Conduit 20mm, 2.98m/Ea, White Ea 120 120
receive
yet to
2860 6-Apr-04 ASAP PVC Connector 20mm, White Ea 100 100
receive
yet to
2860 6-Apr-04 ASAP PVC Mounting Clip 20mm, White Ea 300 300
receive
yet to
2860 6-Apr-04 ASAP PVC Coupling 20mm, White Ea 50 50
receive
yet to
2860 6-Apr-04 ASAP PVC Tee Coupling 20mm, White Ea 60 60
receive
yet to
2860 6-Apr-04 ASAP PVC Bend(L) Coupling 20mm, White Ea 60 60
receive
yet to
2860 6-Apr-04 ASAP Clipsal Ciruit Breaker G4CB1020C, 20A, 1Pole Ea 17 17
receive
yet to
2860 6-Apr-04 ASAP National Ventilating Fan, Ref. FV-25LUT2 or Equivalent Ea 8 8
receive
yet to
2860 6-Apr-04 ASAP Clipsal 13A Fuse Connection Unit E30FSG Ea 15 15
receive
Clipsal Compact Isolator 56SW120 yet to
2860 6-Apr-04 ASAP Ea 10 10
(IP56-250V, 1 Pole-20A) receive
yet to
2860 6-Apr-04 ASAP Clipsal Twin Sockets with Switchs, Ref. E25 Ea 30 30
receive
yet to
2860 6-Apr-04 ASAP Clipsal Surface Box to Suit Twin Sockets with Switchs, Ref. T146 Ea 30 30
receive
yet to
2860 6-Apr-04 ASAP TCL Single Switchs 10A Ea 10 10
receive
yet to
2860 6-Apr-04 ASAP TCL Two Way Light Switchs 10A Ea 8 8
receive
Surface Box to suit Single Switch 10A, Two Way Light Switch yet to
2860 6-Apr-04 ASAP Ea 31 31
10A and Fuse Connection Unit, Clipsal Ref. T238/20 receive
yet to
2860 6-Apr-04 ASAP Clipsal Plug Top 13A with fuse, 3 pin Ea 30 30
receive
Plastic Juntion Box, Size: 100x100x50mm, Derrie Brand, Ref. yet to
2860 6-Apr-04 ASAP Ea 38 38
88128 receive
Vanas-Paragon 2x40W, weatherproof wall mounted flourescent yet to
2860 6-Apr-04 ASAP Set 38 38
light, IP65, Code: PCT 438 receive
Vanas-Paragon 1x36W, weatherproof wall mounted flourescent yet to
2860 6-Apr-04 ASAP Set 7 7
light, IP65, Code: PCT 439 receive
yet to
2860 6-Apr-04 ASAP CS Screw M4x25, Philips Countersink Head Ea 500 500
receive
yet to
2860 6-Apr-04 ASAP Plastic Anchor Size:4 (for CS Screw M4x25) Ea 500 500
receive
yet to
2860 6-Apr-04 ASAP Plastic Terminal Block 16mm2 Ea 20 20
receive
REQUISITION STATUS
Mezzanine Floor

Date: 12/17/2021

MRF Received

Date Req'd Description Unit Status


To be
No. Date Unit Qty Date Balance
procured

1 2 3 4 5 6 7 8 9 10 11
Emergency Light 2T
. Tube: 10W-30Cm x 2
yet to
2860 6-Apr-04 ASAP . Battery: 6V-4Ah Ea 10 10
receive
. Intelligent sensor
. Duration: 3h30: 1 Tube, 2h30: 2 Tube
Emergency Light 2T with Exit Sign
. Tube: 10W-30Cm x 2
yet to
2860 6-Apr-04 ASAP . Battery: 6V-4Ah Ea 8 8
receive
. Intelligent sensor
. Duration: 3h30: 1 Tube, 2h30: 2 Tube
yet to
2860 6-Apr-04 ASAP Royal Toto RA230 Hand Dryer Ea 2 2
receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 2.5mm2 Cu/PVC - Red - 100mtrs/roll Roll 5 5
receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 2.5mm2 Cu/PVC - Yellow -100mtrs/roll Roll 4 4
receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 2.5mm2 Cu/PVC - Blue - 100mtrs/roll Roll 3 3
receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 2.5mm2 Cu/PVC - Black - 100mtrs/roll Roll 8 8
receive
Cadivi Power Cable 2.5mm2 Cu/PVC - Green/Yellow - yet to
2860 6-Apr-04 ASAP Roll 7 7
100mtrs/roll receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 4.0mm2 Cu/PVC - Red - 100mtrs/roll Roll 6 6
receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 4.0mm2 Cu/PVC - Yellow - 100mtrs/roll Roll 4 4
receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 4.0mm2 Cu/PVC - Blue - 100mtrs/roll Roll 6 6
receive
yet to
2860 6-Apr-04 ASAP Cadivi Power Cable 4.0mm2 Cu/PVC - Black - 100mtrs/roll Roll 12 12
receive
Cadivi Power Cable 4.0mm2 Cu/PVC - Green/Yellow - yet to
2860 6-Apr-04 ASAP Roll 11 11
100mtrs/roll receive
2862 6-Apr-04 ASAP Pipe Ø114 mtr. 9 mtr 9 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Pipe Ø60 mtr. 50 mtr 50 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Coupling Ø114 ea 0 - rec'd
2862 6-Apr-04 ASAP Elbow 90° x 114 Dia. ea 2 ea 2 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Elbow 45° x 114 Dia. ea 4 ea 4 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Elbow 90° x 60 Dia. ea 20 ea 20 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Elbow 45° x 60 Dia. ea 2 ea 2 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Tee Ø114 ea 4 ea 4 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Tee Ø60 ea 2 ea 2 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Reducer 114 x 168 ea 2 ea 2 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Floor trap Ø60 set 2 set 2 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Cap Ø60 ea 3 ea 3 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Pipe Ø34 mtr. 0 - rec'd
2862 06-Apr-04 ASAP Pipe Ø15 mtr. 26 mtr 26 14-Apr-04 - rec'd
yet to
2862 06-Apr-04 ASAP Reducer 34 x 15, female, threaded ea 4 4
receive
2862 06-Apr-04 ASAP Tee Ø15 ea 5 ea 5 14-Apr-04 - rec'd
2862 06-Apr-04 ASAP Ball Valve Ø15, female, threaded ea 6 ea 6 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Elbow 90°, 34 Dia. ea 5 ea 5 14-Apr-04 - rec'd
2862 6-Apr-04 ASAP Elbow 90°, 15 Dia ea 5 ea 5 14-Apr-04 - rec'd
yet to
2862 6-Apr-04 ASAP Closet set 3 3
receive
yet to
2862 6-Apr-04 ASAP Lavatory set 1 1
receive
yet to
2862 6-Apr-04 ASAP Sink set 1 1
receive
yet to
2862 6-Apr-04 ASAP Water Cock set 3 3
receive
-
REQUISITION STATUS
Mezzanine Floor

Date: 12/17/2021

MRF Received

Date Req'd Description Unit Status


To be
No. Date Unit Qty Date Balance
procured

1 2 3 4 5 6 7 8 9 10 11

You might also like