PETRONAS TECHNICAL STANDARDS

Index To PTS

PTS 00.01.01
June 2019

© 2019 PETROLIAM NASIONAL BERHAD (PETRONAS)


All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form
or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright
owner. PETRONAS Technical Standards are Company’s internal standards and meant for authorized users only.
PTS 00.01.01
INDEX TO PTS June 2019
Page 2 of 47

FOREWORD

PETRONAS Technical Standards (PTS) has been developed based on the accumulated knowledge,
experience and best practices of the PETRONAS group supplementing National and International
standards where appropriate. The key objective of PTS is to ensure standard technical practice across
the PETRONAS group.

Compliance to PTS is compulsory for PETRONAS-operated facilities and Joint Ventures (JVs) where
PETRONAS has more than fifty percent (50%) shareholding and/or operational control, and includes
all phases of work activities.

Contractors/manufacturers/suppliers who use PTS are solely responsible in ensuring the quality of
work, goods and services meet the required design and engineering standards. In the case where
specific requirements are not covered in the PTS, it is the responsibility of the
Contractors/manufacturers/suppliers to propose other proven or internationally established
standards or practices of the same level of quality and integrity as reflected in the PTS.

In issuing and making the PTS available, PETRONAS is not making any warranty on the accuracy or
completeness of the information contained in PTS. The Contractors/manufacturers/suppliers shall
ensure accuracy and completeness of the PTS used for the intended design and engineering
requirement and shall inform the Owner for any conflicting requirement with other international
codes and technical standards before start of any work.

PETRONAS is the sole copyright holder of PTS. No part of this document may be reproduced, stored
in a retrieval system or transmitted in any form or by any means (electronic, mechanical, recording or
otherwise) or be disclosed by users to any company or person whomsoever, without the prior written
consent of PETRONAS.

The PTS shall be used exclusively for the authorised purpose. The users shall arrange for PTS to be
kept in safe custody and shall ensure its secrecy is maintained and provide satisfactory information to
PETRONAS that this requirement is met.
PTS 00.01.01
INDEX TO PTS June 2019
Page 3 of 47

Table of Contents
1.0 INTRODUCTION ..................................................................................................... 4
1.1 SCOPE ............................................................................................................................ 4
1.2 GLOSSARY OF TERM ...................................................................................................... 4
1.3 SUMMARY OF CHANGES ............................................................................................... 4
1.4 WHAT’S NEW IN THIS REVISION ................................................................................... 5
2.0 LIST OF PTS ACCORDING TO SKG .......................................................................... 10
2.1 00 – GENERAL ............................................................................................................. 10
2.2 SKG 11 – CIVIL, STRUCTURE & PIPELINE ..................................................................... 10
2.3 SKG 12 – MECHANICAL ............................................................................................... 14
2.4 SKG 13 – ELECTRICAL .................................................................................................. 16
2.5 SKG 14 – INSTRUMENT & CONTROL ........................................................................... 18
2.6 SKG 15 – MATERIAL CORROSION & INSPECTION........................................................ 19
2.7 SKG 16 – PROCESS....................................................................................................... 21
2.8 SKG 18 – GHSE ............................................................................................................ 23
2.9 SKG 19 – PROJECT MANAGEMENT ............................................................................. 23
2.10 SKG 20 – MARITIME .................................................................................................... 24
2.11 SKG 25 – DRILLING ...................................................................................................... 24
3.0 PTS MAPPING ACCORDING TO SKG ...................................................................... 25
3.1 00 - GENERAL .............................................................................................................. 25
3.2 SKG 11 – CIVIL, STRUCTURE & PIPELINE ..................................................................... 25
3.3 SKG 12 - MECHANICAL ................................................................................................ 28
3.4 SKG 13 - ELECTRICAL ................................................................................................... 31
3.5 SKG 14 – INSTRUMENT & CONTROL ........................................................................... 33
3.6 SKG 15 – MATERIAL CORROSION & INSPECTION........................................................ 36
3.7 SKG 16 – PROCESS....................................................................................................... 38
3.8 SKG 19 – PROJECT MANAGEMENT ............................................................................. 41
3.9 SKG 20 – MARITIME .................................................................................................... 44
3.10 SKG 25 – DRILLING ...................................................................................................... 46
4.0 BIBLIOGRAPHY .................................................................................................... 47
PTS 00.01.01
INDEX TO PTS June 2019
Page 4 of 47

1.0 INTRODUCTION

The new PTS numbering is based on PETRONAS SKILL GROUP. For general PTS that is not under
any specific SKG, it would be labelled as PTS 00.XX.XX.

1.1 SCOPE

1.1.1 This PTS covers the following sections:


i. Section 1.0 highlights Changes to Index to PTS as of date of issuance
ii. Section 2.0 details out List of PTS according to SKG
iii. Section 3.0 specifies PTS Mapping according to SKG

1.1.2 This PTS is to be read and understood as follows (applicable to Section 2.0 only):
i. PTS that is new is shown in bold with symbol ;

ii. PTS that is revised is shown in italic with symbol ※;


iii. all PTS that indicates Process Safety Requirements (PSR) are listed as Yes under
PSR column

1.1.3 This index also maps identified areas according to SKG. The mapping is not exhaustive and it
will be added as per need, if necessary.

1.1.4 This index covers published PTS up to May 2019.

1.2 GLOSSARY OF TERM

1.2.1 General Definition of Terms & Abbreviations

Refer to PTS 00.01.03 for PTS Requirements, General Definition Of Terms, Abbreviations &
Reading Guide.

1.2.2 Specific Definition of Terms

No Term Definition

1 New New PTS which content has been developed and


formatted as per PTS requirement.
Table 1.1: Specific Definition of Terms

1.2.3 Specific Abbreviations


None

1.3 SUMMARY OF CHANGES


This PTS 00.01.01(June 2019) replaces PTS 00.01.01 (May 2018).
PTS 00.01.01
INDEX TO PTS June 2019
Page 5 of 47

1.4 WHAT’S NEW IN THIS REVISION

1.4.1 The following PTS has been newly developed


No New PTS New PTS Title PSR Active Status
Number
1 11.35.06 Preservation and Abandonment for Pipelines, Line 2019
Pipes and Its Associated Fittings
2 11.37.03 Limit State and Strain‐based Design for Pipelines 2019
(Amendment/Supplement to ISO 16708, CSA Z662,
ASME B31.4 and ASME B31.8
3 15.01.09 Materials Selection for Upstream Facilities 2019
4 15.12.11 Welding of 13Cr Pipelines and Related Facilities 2019
(Amendments/Supplements to DNVGL-ST-F101
Appendix C & D)
5 15.30.04 Non Destructive Testing for Surface Defect 2019
Detection (Magnetic Particle Testing and Dye
Penetrant Testing)
6 16.38.02 Biological System for Wastewater Treatment 2019
7 16.40.02 Process Control Narrative Specification 2018

1.4.2 The following PTS has been withdrawn


No PTS New PTS Title Withdrawal Remarks
Number Year
1 11.22.18 Transportation Fatigue Assessment for 2019 Combined with
Offshore Structure PTS 12.22.20
2 11.22.19 Foundation Stability of Jackup or MOPU 2019 Combined with
PTS 11.21.02
3 12.00.03 Workshop Equipment and Mechanical Tools 2019
4 14.12.11 Management of Instrumented Protective 2019
Functions
5 11.20.01 Offshore Temporary Refuges 2017 Transferred to
GHSE
6 11.22.04 Design of Offshore Living Quarters 2017 Transferred to
GHSE
7 11.22.06 Layout of Offshore Facilities 2017 Transferred to
GHSE
8 11.24.02 Determination of Loads on Structures and 2017
Sea Fastening During Barge Transportation
9 12.01.03 Vibration Evaluation Guidelines and 2017
Acceptance Criteria for Rotating Equipment
10 12.11.08 Downhole Equipment – Progressing Cavity 2017
Pump Systems for Artificial Lift – Surface –
Drive System (Endorsement of ISO 15136-2)
11 12.12.02 Oil Mist Lubrication System 2017
12 12.22.07 Fiberglass Reinforced Plastic Tanks - Based 2017
On API Spec. 12P
PTS 00.01.01
INDEX TO PTS June 2019
Page 6 of 47

No PTS New PTS Title Withdrawal Remarks


Number Year
13 12.24.03 Installation, Testing & Commissioning of 2017 Combined with
HVAC System PTS 12.24.01
14 14.40.05 Telecommunication Tower 2017 Transferred and
combined with
PTS 11.22.21
15 15.10.05 Specification for CRA Line Pipe 2017
(Amendments/Supplements to API Spec
5LC)
16 15.10.09 Steel Pipes for Oil Country Tubular Goods 2017 Content
(OCTG) available in PTS
25.00.21
17 15.10.14 Onshore Pressure Vessel and Piping in Wet 2017 Transferred and
H2S Service combined with
PTS 12.20.01
18 15.10.16 Nickel Base Alloy 718 (UNS N07718) for Oil 2017 Content
and Gas Drilling and Production Equipment available in PTS
(Endorsement of API Standard) 25.00.21
19 15.12.05 Duplex and Super Duplex Stainless Steel 2017
Pipelines - Field Welding
20 15.20.05 Thermal Spray Coatings - Aluminium and 2017
85/15 Zinc/Aluminium Alloy
21 15.31.01 Inspection of Oil Country Tubular Goods 2017 Content
(Endorsement of ISO 15463) available in PTS
25.00.21
22 15.31.02 Inspection Manual for Offshore Platform 2017
and Associated Equipment
23 16.72.02 Control and Mitigation of Fires and 2017 Transferred to
Explosions on Offshore Production GHSE
Installations
24 16.72.03 Offshore Production Installations - 2017
Requirement and Guidelines for Emergency
Response (Amendments/Supplements to
ISO 15544)
25 11.36.02 Managing System Integrity of Gas Pipelines 2017
(Amendments/Supplements to ASME
B31.8S-2004)
26 11.36.03 Managing System Integrity for Liquid 2017
Hydrocarbon Pipelines
27 00.01.02 PTS Publication 2016
28 12.23.04 Inspection, Maintenance, Repair and 2016
Remanufacture of Hoisting As Per ISO 13534
29 12.23.05 Hoisting Equipment for Drilling and 2016
Production As Per 13535
30 13.41.01 Ex Management Assessment Guidelines (Ex 2016
MAG)
31 14.10.05 Actuated Valve Specification 2016
PTS 00.01.01
INDEX TO PTS June 2019
Page 7 of 47

No PTS New PTS Title Withdrawal Remarks


Number Year
32 15.10.10 Corrosion-Resistant Alloy Seamless Tubes 2016
For Use As Casing, Tubing And Coupling
Stock – Technical Delivery Conditions
(Endorsement Of ISO 13680:2010)
33 16.52.08 Bulk Hose Transfer Facilities for Offshore 2016
Platforms
40
41 11.14.02 Design Of Pre Engineered Buildings 2015
42 11.36.01 Pipeline Integrity Management System 2015
(PIMS) Manual
43 11.36.04 Pipeline Operational Risk Assessment 2015
44 12.30.10 Fabrication of heater piping 2015
45 15.01.02 Non-Metallic Materials - Selection and 2015
Application
46 15.13.04 Insulating and Dense Refractory Concrete 2015
Linings
47 15.20.01 Cathodic Protection 2015
48 15.20.02 Installation And Commissioning Of Cathodic 2015
Protection Systems
49 15.20.08 Design And Installation Of Chemical- 2015
Resistant Linings For Concrete Structures
50 15.20.09 Design And Installation Of Chemical- 2015
Resistant Brick Lining For Process Equipment
51 15.20.12 Maintenance Painting 2015
52 15.21.01 Corrosion Mitigation Strategy For Wet Sour 2015
Gas Carbon Steel Pipelines
53 15.44.01 The Preservation of Old and New Equipment 2015
and Piping Standing Idle
54 16.71.02 Hazard Identification (HAZID) Study 2015
55 16.73.02 Active Fire Protection Systems and 2015
Equipment for Onshore
56 16.74.01 Human Factors Engineering - Investment 2015 Previously
Justification Model PTS 19.20.01
57 19.80.01 Cost Control of Capital Investment Projects 2015
58 19.80.02 Capital Project Coding System 2015
59 19.80.03 Asset Breakdown for Onshore Facilities 2015
60 25.01.01 Drilling fluid material - specifications and 2015
tests (endorsement of ISO 13500)
61 25.01.02 Field testing of drilling fluids - water-based 2015
fluids (endorsement of ISO 10414-1)
62 25.01.03 Field testing of drilling fluids – Oil based 2015
fluids (amendments/supplements to ISO
10414-2)
63 25.01.04 Drilling fluids - Laboratory testing 2015
(endorsement of ISO 10416)
PTS 00.01.01
INDEX TO PTS June 2019
Page 8 of 47

No PTS New PTS Title Withdrawal Remarks


Number Year
64 25.01.05 Performance testing of cementing float 2015
equipment (endorsement of ISO 10427-3)
65 25.01.06 Bow-spring casing centralizers 2015
(endorsement of ISO 10427-1)
66 25.01.07 Testing of Deepwater Well Cement 2015
Formulations (Endorsement of ISO 10426-3)
67 25.01.08 Specifications for cements and materials for 2015
well cementing (endorsement of ISO 10426-
1)
68 25.01.09 Care and use of casing and tubing 2015
(endorsement of ISO 10405)
69 25.01.10 Testing Procedures for Casing and Tubing 2015
Connections (Endorsement of ISO 13679)
70 25.01.11 Evaluation And Testing Of Thread 2015
Compounds For Use With Casing, Tubing
And Line Pipe (Endorsement Of ISO 13678)
71 25.01.12 Testing of well cements (endorsement of ISO 2015
10426-2))
72 25.02.01 Wellhead and christmas tree equipment 2015
(amendments and supplements to ISO
10423)
73 25.03.01 Measurement of viscous properties of 2015
completion fluids (endorsement of ISO
13503-1)
74 25.03.02 Downhole Equipment - Subsurface Safety 2015
Valves (Endorsement Of ISO 10432)
75 N/A Drilling and well servicing equipment 2015
(endorsement of ISO 14693)
76 N/A Steel Drill Pipe With Weld-On Tool Joints 2015
(Amendments/Supplements To ISO 11961)
77 N/A Marine drilling riser couplings (endorsement 2015
of ISO 13625)
78 N/A Drill-through equipment (endorsement of 2015
ISO 13533)
79 N/A Drilling and well Servicing Structures 2015
(Endorsement of ISO 13626)

1.4.3 The following PTS has been re-numbered due to transfer of ownership

No Current New PTS Title PSR Remark


New PTS
Number
1 11.22.21 Supporting Structures for Telecommunication Yes Previously
Equipment PTS 14.40.05
2 12.20.01 Pressure Vessels Previously
PTS 15.10.14
PTS 00.01.01
INDEX TO PTS June 2019
Page 9 of 47

No Current New PTS Title PSR Remark


New PTS
Number
3 18.54.10 Offshore Temporary Refuges Yes Previously
PTS 11.20.01
4 18.51.04 Design of Offshore Living Quarters Previously
PTS 11.22.04
5 18.53.15 Layout of Offshore Facilities Yes Previously
PTS 11.22.06
6 18.22.04 Control and Mitigation of Fires and Explosions on Previously
Offshore Production Installations PTS 16.72.02
8 16.74.02 Human Factors Engineering – Valve Criticality Previously
Analysis PTS 19.20.02
9 18.53.09 Human Factors Engineering In Projects Transferred to
GHSE
10 18.53.10 Human Factors Engineering - Application During Transferred to
Construction GHSE
11 18.55.06 Helidecks on Fixed and Mobile Offshore Transferred to
Installations GHSE
PTS 00.01.01
INDEX TO PTS June 2019
Page 10 of 47

2.0 LIST OF PTS ACCORDING TO SKG

2.1 00 – GENERAL
No New PTS New PTS Title PSR Active Status
Number
1 00.01.01 ※ Index to PTS Jun 2019
2 00.01.03 PTS Requirements, General Definition Of Terms, Feb 2016
Abbreviations & Reading Guide
3 00.11.01 Index to Standard Drawings Dec 2014
4 00.11.02 Index To Standard Forms Dec 2014
5 00.11.03 Index to Requisitions Dec 2014

2.2 SKG 11 – CIVIL, STRUCTURE & PIPELINE

No New PTS New PTS Title PSR Active Status


Number
1 11.00.02 Offshore Metocean Criteria Nov 2016
2 11.03.01 ※ Design of Mooring for Floating Production Dec 2018
Systems
3 11.03.02 ※ Float Over Engineering Design and Installation Jan 2019
4 11.03.03 ※ FPSO/FSO Hull Conversion Dec 2018
5 11.03.04 Design of Floating Structures Mar 2016
6 11.03.06 Floating Production Storage and Offloading Dec 2017
(FPSO) / Floating Storage and Offloading (FSO)
Decommissioning
7 11.03.07 Offshore Refurbished Structures Dec 2017
8 11.10.01 Minimum Loadings And Load Combinations for Dec 2016
Onshore Structural Design
9 11.10.02 Seismic Hazard Assessment for Onshore Facilities Yes Jan 2017
10 11.10.03 Design And Engineering of Portable Blast- Jun 2017
Resistant Modules (PBRM)
11 11.10.04 Gratings Jun 2017
12 11.10.05 Design Requirement for Non-permanent Onshore Nov 2017
Works
13 11.11.01 ※ Site Investigation for Onshore Facilities Jan 2019
14 11.12.01 Site Preparation and Earthworks Jul 2017
15 11.12.02 Roadworks and Surfacing Jan 2017
16 11.12.03 Drainage And Sewer Systems For Onshore Yes Jan 2017
Facilities
17 11.12.04 ※ Tank Foundation, Tank Farm and Remote Yes Jan 2019
Containment
18 11.12.05 Slope Stability Assessment And Slope Repair For Oct 2016
Existing Pipeline Route In Mountainous Region
19 11.13.01 ※ Geotechnical Engineering for Onshore Facilities Apr 2019
PTS 00.01.01
INDEX TO PTS June 2019
Page 11 of 47

No New PTS New PTS Title PSR Active Status


Number
20 11.13.02 ※ Deepwater and Subsea Foundation Design Apr 2019
21 11.14.01 Design and Engineering of Buildings Jan 2017
22 11.14.03 Blast Resistant Building Design Yes Jul 2017
23 11.15.01 Passive Fire And Cryogenic Protection For Yes Jul 2017
Structural Steel
24 11.15.02 ※ Onshore Steel Structures Apr 2019
25 11.15.03 ※ Design and Construction of Reinforced Concrete Apr 2019
Foundations and Structures
26 11.16.01 Design of Jetty Yes Jun 2017
28 11.20.21 Earthquake Requirement for Analysis of Fixed Apr 2016
Offshore Structures
29 11.21.01 Positioning and Geohazards Investigation Survey Feb 2016
for Offshore Engineering and Construction Works
30 11.21.02 Site-specific Assessment of Mobile Offshore Jack- Oct 2016
Up (JU) Units (Supplements to ISO 19905-1)
31 11.22.02 Design of Fixed Offshore Structures (Working Yes Oct 2016
Stress Design)
33 11.22.05 Offshore Buildings Sept 2017
35 11.22.17 ※ Marine Lifting Design Aug 2018
36 11.22.20 ※ Fatigue Assessment for Fixed Offshore Structures Dec 2018
(Supplements to ISO 19902)
37 11.22.21 Supporting Structures for Telecommunication Yes Oct 2017
Equipment
38 11.22.22 Load Resistance Factor Design (LRFD) for Fixed Oct 2017
Offshore Structures
39 11.24.01 Installation of Fixed Offshore Structure Dec 2017
41 11.25.02 Structure Integrity Fitness-for-Purpose Dec 2017
Assessment of Existing Fixed Offshore Structures
42 11.27.01 ※ Offshore Site Investigation for Fixed Offshore Dec 2018
Platform and Jack Up Locations
43 11.27.02 ※ Geotechnical Specific Requirements for Jan 2019
Fabrication Yards
44 11.27.03 Advanced Geotechnical In-situ Testing Oct 2017
Requirements
45 11.27.04 Ground Improvement, Soil Instrumentation and Oct 2017
Monitoring for Onshore Facilities
46 11.30.03 ※ Free Span Analysis for Submerged Pipeline Apr 2019
47 11.30.04 Upheaval Buckling of Pipeline Nov 2016
(Amendments/ Supplements to DNV-RP-F110)
48 11.30.05 Pipeline / Trawl Gear Interaction Nov 2016
49 11.30.06 ※ Offshore Pipeline Route Survey Dec 2018
50 11.30.07 ※ Pipeline and Riser Engineering Design Jan 2019
PTS 00.01.01
INDEX TO PTS June 2019
Page 12 of 47

No New PTS New PTS Title PSR Active Status


Number
51 11.30.08 ※ Dynamic Riser Design (Amendments/Supplements Jan 2019
to DNVGL-ST-F201 and API STD 2RD)
52 11.30.09 ※ Offshore Pipe to Soil Interaction Jan 2019
(Amendment/Supplement to DNVGL-RP-F114)
53 11.30.10 ※ Unbonded Flexible Pipe for Offshore Pipelines & Jan 2019
Risers (Amendments/ Supplements to API SPEC
17J and API RP 17B)
54 11.31.01 Specification for Pipeline Valves (Amendments / Dec 2016
Supplements to API 6D & API 6DSS)
55 11.31.02 Pipeline Pig Trap Systems Jun 2017
56 11.31.04 Pipeline Fittings (Amendments/Supplements to Dec 2017
ISO 15590-2 and MSS SP-75)
57 11.31.05 Pipeline Isolating Joints Aug 2017
58 11.31.07 Carbon and Low Alloy Steel Pipeline Flanges for Nov 2017
Use in Oil and Gas Operations
(Amendments/Supplements to ISO 15590-3 and
MSS SP-44)
59 11.31.08 ※ Subsea Pipeline Lateral Buckling Assessment and Jan 2019
Design (Amendments/ Supplements to DNVGL-
RP-F110)
60 11.31.09 Pipeline End Termination (PLET) and Pipeline End Nov 2016
Manifold (PLEM) (Amendments/Supplements to
ISO 13628-15)
61 11.32.01 ※ Cathodic Protection Systems for Onshore Buried Jan 2019
and Shore Approach Pipelines
62 11.32.02 ※ Sacrificial Anode Cathodic Protection System for Jan 2019
Offshore Pipelines (Amendments / Supplements
to DNVGL-RP-F103)
63 11.32.03 External Polyethylene And Polypropylene Coating Nov 2016
Of Linepipe (Amendments/Supplements To ISO
21809–1)
64 11.32.04 ※ Fusion Bonded Epoxy Coating for Line Pipe Jan 2019
65 11.32.05 ※ Bituminous Enamel Coating of Steel Linepipe Dec 2018
66 11.32.06 Thermoplastic Lined Pipelines Jul 2017
67 11.32.07 Internal Coating of Line Pipe for Non-corrosive Jan 2017
Gas Transmission Service (Amendments /
Supplements to ISO 15741)
68 11.32.08 ※ Offshore Riser Splash Zone Protection Coating Dec 2018
69 11.32.09 Concrete Coating of Linepipe Jan 2017
70 11.32.10 ※ Field Joint Coatings (Amendments / Supplements Jan 2019
To ISO 21809 – 3)
71 11.33.02 ※ Pipeline Leak Detection (Amendment/Supplement Jan 2019
to API RP 1130)
72 11.34.01 Pressure Testing of Pipelines Aug 2017
73 11.34.02 Pipelines Pre-Commissioning and Commissioning Dec 2016
PTS 00.01.01
INDEX TO PTS June 2019
Page 13 of 47

No New PTS New PTS Title PSR Active Status


Number
74 11.34.06 Onshore Pipeline Construction (Amendments / Dec 2016
Supplements to ASME B31.8 and ASME B31.4)
75 11.35.02 Pipeline Pigs Oct 2017
76 11.35.03 Specifications and Requirements for Pipeline Jan 2017
Inspection
77 11.35.04 Pipeline and Piping Repair (Amendments and Jan 2017
Supplements to ASME PCC2 and DNV RP F113)
78 11.35.06  Preservation and Abandonment for Pipelines, Jan 2019
Line Pipes and Its Associated Fittings
79 11.35.07 Specification of RTP Insertion for Pipeline Jan 2017
Rehabilitation
80 11.36.08 Requirement for Pipeline Life Extension Dec 2016
81 11.37.01 Advanced Pipeline Integrity Assessment Sept 2017
82 11.37.03  Limit State and Strain‐based Design for Pipelines Jan 2019
(Amendment/Supplement to ISO 16708, CSA
Z662, ASME B31.4 and ASME B31.8)
PTS 00.01.01
INDEX TO PTS June 2019
Page 14 of 47

2.3 SKG 12 – MECHANICAL

No New PTS New PTS Title PSR Date of


Number Endorsement
1 12.00.02 Symbols And Identification System - Mechanical Jun 2017
2 12.00.04 ※ Spare Parts Requirements Apr 2019
3 12.00.05 Compressed Natural Gas (CNG) Refuelling Yes Oct 2017
Stations (Amendments/Supplements to MS 1204)
4 12.00.06 Bolted Flange Joint Assembly Oct 2016
(Amendments/Supplements To ASME PCC-1)
5 12.00.07 Material Handling Criteria for Offshore Facilities Jan 2017
6 12.01.01 Installation of Rotating Equipment Oct 2016
7 12.01.02 Noise Control Oct 2016
9 12.02.01 ※ Field Inspection Prior to Commissioning Dec 2018
of Mechanical Equipment
10 12.03.01 ※ Plant Model Review Apr 2019
11 12.03.02 ※ Minimum Requirements For Implementation Of Yes Jan 2019
Non-Routine Critical Activities
12 12.03.04 Layout Of Onshore Facilities Jun 2017
13 12.04.01 Refractory Bricks and Shapes Jan 2017
14 12.10.01 ※ Combustion Gas Turbines Dec 2018
15 12.10.20 Steam Turbine – Selection, Testing and May 2017
Installation
16 12.10.21 General-Purpose Steam Turbines Nov 2016
17 12.10.22 Special Purpose Steam Turbines Jun 2017
18 12.10.40 Spark Ignited Gas Fuelled Engines Nov 2016
19 12.10.60 Diesel Engines Oct 2016
20 12.11.01 ※ Pump – Type Selection And Basic Design Dec 2018
Requirements
21 12.11.02 Centrifugal Pumps Jun 2017
22 12.11.04 Positive Displacement Pumps Oct 2016
23 12.11.05 Liquid Ring Vacuum Pumps and Compressors Aug 2016
24 12.11.06 ※ Firewater Pump Aug 2018
26 12.11.30 Compressors – Selection, Testing and Installation Nov 2016
27 12.11.31 Axial, Centrifugal and Expander Compressors Aug 2017
28 12.11.32 Reciprocating Compressors Oct 2016
29 12.11.33 Rotary-Type Positive Displacement Compressors Jun 2017
30 12.11.34 Packaged, Integrally Geared, Centrifugal Plant Oct 2016
and Instrument Air Compressors
31 12.11.35 ※ Packaged Air Compressor for Offshore Application Dec 2018
32 12.11.76 Centrifugal Fans for Fired Heaters Oct 2016
33 12.12.01 Lubrication, Shaft-sealing and Oil-control Systems Aug 2017
and Auxiliaries
35 12.12.03 Shaft Sealing Systems for Centrifugal and Rotary Jul 2017
Pumps
PTS 00.01.01
INDEX TO PTS June 2019
Page 15 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
36 12.12.05 Petroleum And Natural Gas Industries-High- Jun 2017
Speed Special-Purpose Gear Units
37 12.12.06 Flexible Couplings For Mechanical Power Aug 2016
Transmission In Special Purpose Applications
38 12.20.01 ※ Pressure Vessels Yes Dec 2018
39 12.20.02 Installations Of Pressurised Bulk LPG Storage Yes Oct 2017
40 12.20.03 LPG Bulk Transfer and Transportation Yes Oct 2017
41 12.20.06 Pressure Vessel - Manufacturing Report Jun 2016
42 12.20.07 Glass-Fibre Reinforced Epoxy, Polyester And Vinyl Oct 2017
Ester Vessels
43 12.20.08 Mounded Horizontal Cylindrical Vessels for Yes Oct 2016
Pressurized LPG Storage
44 12.21.01 Heat Exchangers - Shell And Tube Type Yes May 2017
45 12.21.02 Air-Cooled Heat Exchangers June 2017
46 12.21.03 Plate And Frame Heat Exchangers Yes Aug 2017
47 12.21.04 Heat Exchanger - Brazed Aluminium Plate-Fin Yes Jun 2016
Type
48 12.21.05 Heat Exchanger - Printed Circuit (PCHE) Type Sept 2016
49 12.21.08 Heat Exchanger – Plate And Shell (PSHE) Type Nov 2016
50 12.22.01 Standard Vertical Storage Tanks – Selection, Yes Jun 2017
Design And Fabrication Based on EN 14015
51 12.22.02 Vertical Storage Tank Based on API 650 Yes Nov 2016
52 12.22.03 Standard Vertical Tanks – Field Erection And Dec 2016
Testing
53 12.22.04 Vertical Steel Storage Tanks – Inspection, Dec 2016
Maintenance and Repair
54 12.22.05 ※ Side-Entry Mixers for Storage Tanks Jun 2018
55 12.22.06 Storage and Sphere Tanks Demolition Jan 2017
57 12.22.09 ※ Rectangular Steel Storage Tanks Yes Mar 2019
58 12.23.01 ※ Pedestal-Mounted Cranes For Offshore Dec 2018
59 12.23.03 Lifting Facilities and Weather Protection for Dec 2016
Rotating Equipment
60 12.24.01 Heating, Ventilation and Air Conditioning (HVAC) Jul 2017
System for Onshore Application
61 12.24.02 Heating, Ventilation & Air Conditioning System Jun 2017
For Offshore Application
63 12.30.01 Piping Class – Basis of Design Jan 2017
64 12.30.02 Piping General Requirements Yes Dec 2017
65 12.30.04 Pipe Supports Jan 2017
66 12.30.05 Shop and Field Fabrication of Piping Yes Jan 2017
67 12.30.06 ※ Protective Steam Heating of Piping Systems Apr 2019
68 12.30.07 Hot-tapping on Pipelines, Piping and Equipment Yes Jan 2017
69 12.30.08 Fabric Type Expansion Joints (Amendment / Feb 2017
Supplement to RAL-GZ 719)
PTS 00.01.01
INDEX TO PTS June 2019
Page 16 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
70 12.30.11 Unlisted Mechanically Attached Fittings for Piping May 2016
and Pipeline System
71 12.31.01 Piping Classes – Refineries, Petrochemicals, Gas May 2017
Plants, Terminals, Onshore Exploration and
Production Facilities
72 12.31.02 Piping Classes - Exploration and Production May 2017
(Offshore)
73 12.31.03 Piping Classes – Services and Materials Selection Jun 2017
Index
74 12.32.01 Relief Valve – Selection, Sizing, Specification, Yes Jul 2017
Inspection And Testing
75 12.32.02 Piping Valves - Selection, Inspection and Testing Dec 2016
76 12.32.04 Steam Traps - Design, Selection & Installation Jul 2017
77 12.32.07 Product Acceptance Test (PAT) for Valves Jun 2017
78 12.34.02 Glass-Fibre Reinforced Plastic Piping System Jan 2016
79 12.34.04 Thermoplastic Piping Jan 2017
80 12.35.01 ※ Pipe Stress Analysis for Piping Design Jan 2019
81 12.40.01 Water Tube Boilers Jun 2017
82 12.40.02 Gas Turbine Heat Recovery Steam Generators Yes Oct 2017
83 12.41.01 Fired Heaters Based on ISO 13705 Jan 2017
84 12.41.02 Fired Heater-Tube Thickness Calculation Aug 2016
85 12.42.01 ※ Steel Stacks (Amendments/ Supplements To Aug 2018
ASME STS-1)
86 12.42.02 Flare Details (Based on ISO 25457) Yes Oct 2017
87 12.50.01 Subsea Production Systems Jun 2017
88 12.50.02 ※ Technology Qualification For Subsea Jan 2019
Development Project
89 12.51.01 Design And Operation Of Subsea Production Nov 2016
Systems – Subsea Umbilicals
(Amendments/Supplements to ISO 13628-5 and
API 17E)
90 12.54.01 ※ Subsea Wellhead System Dec 2018
91 12.54.02 ※ Protection Structure for Subsea Facilities Dec 2018
92 12.54.03 Subsea Tree System Feb 2016
93 12.54.04 Design for Subsea Templates, Manifolds and Apr 2016
Piping Systems

2.4 SKG 13 – ELECTRICAL

No New PTS New PTS Title PSR Date of


Number Endorsement
1 13.00.01 ※ Electrical Engineering General Specifications Yes Jan 2019
PTS 00.01.01
INDEX TO PTS June 2019
Page 17 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
2 13.00.02 Electrical Supply And Generation – Design And Oct 2017
Operation
3 13.00.03 ※ Prefabricated Substation Apr 2019
(Amendments/Supplements to IEC 62271-202)
4 13.00.04 Industrial Power Plant Design Jan 2017
5 13.01.01 Power Quality Jun 2016
6 13.02.01 Pre-commissioning, Commissioning And Oct 2017
Maintenance of Electrical Installations And
Equipment
7 13.03.01 Electrical Workshop – Test Equipment And Tools Oct 2017
for Onshore Facilites
8 13.10.01 Power Transformer (Amendments/Supplements Jul 2017
to IEC 60076)
9 13.11.01 AC High-Voltage Metal-Enclosed Switchgear and Jun 2016
Control Gear for Rated Voltages above 1 kV up to
and Including 52 kV
10 13.11.02 Low Voltage Switchgear and Controlgear Jul 2017
Assemblies (Amendments/Supplements To IEC
61439)
11 13.12.01 Static AC Uninterruptible Power Supply Unit (AC Yes Jan 2016
UPS)
12 13.12.02 Static DC Uninterruptible Power Supply (DC UPS) Jan 2016
Units
13 13.13.01 Electrical Heat Tracing and Frost Heave Jan 2017
Prevention Systems
14 13.13.03 Electrical Process Heating Systems Jan 2017
15 13.14.01 Low Voltage Busduct Jun 2016
16 13.15.01 ※ Navigational Aids System Apr 2019
17 13.20.01 Electrical Machines – Cage Induction Types Oct 2016
18 13.21.01 Synchronous AC Machines Oct 2016
19 13.21.02 ※ Packaged Unit AC Generator Sets Apr 2019
20 13.22.01 ※ Electrical Variable Speed Drive Systems Apr 2019
21 13.23.01 ※ Solar Power Systems Apr 2019
22 13.24.01 ※ Thermoelectric Generators Apr 2019
23 13.30.01 ※ Electrical Network Monitoring and Control System Apr 2019
24 13.31.01 Electrical Protection Relay Application Oct 2017
25 13.40.01 Ex Management, Inspection & Maintenance (Ex Oct 2016
MIM)
26 13.40.02 Ex Equipment Repair Requirement (Ex ERR) Nov 2016
27 13.42.01 Ex Equipment Selection Requirement (Ex ESR) Nov 2016
28 13.50.01 Electromagnetic Compatibility (EMC) Aug 2017
Requirements
29 13.51.01 Lightning Protection System Jan 2017
PTS 00.01.01
INDEX TO PTS June 2019
Page 18 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
30 13.60.01 Portable Electrical Equipment And Temporary Jan 2017
Installation

2.5 SKG 14 – INSTRUMENT & CONTROL

No New PTS New PTS Title PSR Date of


Number Endorsement
1 14.00.01 Human Factor Engineering – Human/ Machine Yes Jan 2017
Interface and Control Room Design
2 14.00.02 Human – Machine Interface In A Control Room Sept 2017
3 14.00.03 ※ Identification of Instrumentation Tags on Piping May 2019
and Instrumentation Diagram (P&ID), DCS and
MMS
4 14.00.04 ※ Instrument Project Engineering Apr 2019
5 14.00.05 Instrument Documents and Drawings Nov 2017
6 14.00.06 Instrument Signal Line Nov 2015
7 14.00.07 Hydraulically Operated Shutdown Valve June2017
8 14.10.01 Shutdown & Blowdown Valves Selection, Sizing Yes Dec 2016
and Specification
9 14.10.02 Field Instrument Design Requirements Yes Nov 2017
10 14.10.03 Instrumentation for Equipment Packages Sept 2015
11 14.10.04 Control Valves : Selection, Sizing and Specification Dec 2016
12 14.10.06 ※ Installation of On-Line Instruments Jun 2019
13 14.10.07 Inspection and Functional Testing of Instruments Jun 2017
14 14.11.01 ※ Specification For Wellhead Control Panels Aug 2018
15 14.11.03 Fieldbus Design, Installation, Operation & Jan 2017
Maintenance
16 14.11.04 ※ DCS Engineering Specifications Jun 2019
17 14.11.05 CyberSecurity Management For Process Control Oct 2017
System
18 14.11.06 ※ Control And Safety Systems for Small Field Jun 2019
Development
19 14.12.01 ESD System For Loading & Discharging LNG & LPG Yes Jun 2017
Ships
20 14.12.07 Design, Installation, Maintenance of Fire and Gas Yes May 2017
Detection System
21 14.12.08 Alarm Management: Design and Implementation Jan 2017
Requirement
22 14.12.09 Instrumentation For Depressurizing Systems Jun 2017
23 14.12.10 Classification, Verification and Implementation of Yes Nov 2017
Instrumented Protective Functions
24 14.12.12 Instrumented Protective System Yes Jul 2017
25 14.13.01 Instrumentation Control & Protection for Fired Yes Aug 2017
Equipment
PTS 00.01.01
INDEX TO PTS June 2019
Page 19 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
26 14.20.01 Compressor Antisurge Control System Design Yes Dec 2016
27 14.30.01 On-line Process Analyser Sampling System Nov 2017
28 14.30.03 On-line Quality Measuring Instrument Nov 2017
29 14.30.04 Design Requirement of Analyser Building Dec 2016
30 14.30.05 Process Online Analyser Acceptance Test Dec 2016
31 14.30.06 Selection and Installation of Continuous Emission Jan 2017
Monitoring System (CEMS)
32 14.30.07 ※ Wet Gas Metering System Jun 2019
33 14.30.08 ※ Multiphase Flow Metering System Jun 2019
34 14.31.02 ※ Fiscal Flow Measurement of Natural Gas May 2019
35 14.31.03 Liquid Hydrocarbon Custody Transfer and Jan 2017
Allocation Measurement
36 14.33.01 ※ Fire and Gas Detection Mapping Mar 2019
37 14.40.01 Plant Telecommunication Sept 2017
38 14.40.02 Telecommunication Standards Nov 2017
39 14.40.03 ※ Telecommunications for Offshore Facilities Apr 2019
40 14.40.04 ※ Telecommunications For Drilling Operations Jun 2019
42 14.40.06 Design and Installation of Telephone Cabling Nov 2017
43 14.40.07 Design Manual, Installation & Testing for Jan 2017
Upstream Telecommunication System
44 14.40.08 Structured Cabling For Telecommunication Nov 2017
45 14.40.09 Microwave Radio System Oct 2017
46 14.50.01 Subsea Production Control Systems – Subsea Feb 2016
Equipment (Amendments/Supplements To API
17F)
47 14.50.02 Subsea Production Control Systems – Topside Nov 2016
Equipment (Amendments/Supplements To API
17F)

2.6 SKG 15 – MATERIAL CORROSION & INSPECTION

No New PTS New PTS Title PSR Date of


Number Endorsement
1 15.01.05 Materials for Use in H2S-Containing Oct 2017
Environments in Oil and Gas Production
(Amendments and Supplements to
ANSI/NACE/MR0175/ISO 15156)
2 15.01.07 Materials Selection For Subsea Applications Feb 2016
3 15.01.09  Materials Selection for Upstream Facilities Apr 2019
4 15.02.01 Positive Material Identification (PMI) Yes Nov 2016
5 15.04.01 ※ Corrosion Management Apr 2019
6 15.06.01 Static Equipment History Record Jan 2017
7 15.10.01 Brittle Fracture of Metallic Materials Yes Oct 2017
PTS 00.01.01
INDEX TO PTS June 2019
Page 20 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
8 15.10.02 Materials and Fabrication of Chromium - Aug 2017
Molybdenum Steel Heavy Wall Pressure Vessels
for High-Temperature, High-Pressure Hydrogen
Service
9 15.10.03 Material For High Temperature Furnace Aug 2017
Components
10 15.10.04 ※ CRA Clad or Lined Steel Pipe Apr 2019
(Amendments/Supplements to API Spec 5LD)
12 15.10.06 Weldable Martensitic Stainless Steel Line Pipe Feb 2016
(Amendments/Supplements to API Spec 5LC)
13 15.10.07 ※ Specification For Linepipe May 2018
(Amendments/Supplements to API 5L)
15 15.10.11 ※ Offshore Structural Steels Apr 2019
18 15.10.17 Hot Induction Bends for Line Pipe Dec 2017
(Amendments/Supplements to ISO 15590-1)
19 15.11.01 Spoolable Fibre-Reinforced Plastic Pipes Feb 2016
20 15.11.03 Material Selection : Non-Metallics Nov 2017
21 15.12.01 Welding for Chemical, Oil, and Gas Industries Jan 2017
(Amendments / Supplements to API RP 582)
22 15.12.03 ※ Heat Tint on Stainless Steel and High Nickel Alloy Dec 2018
Welds
23 15.12.04 ※ Welding of Pipelines and Related Facilities Yes Apr 2019
(Amendments/Supplements To API Std 1104)
25 15.12.06 Structural Steel Fabrication Yes Oct 2017
26 15.12.07 Welding Of Pipeline And Related Facilities - CRA- Yes Nov 2017
Clad Or CRA-Lined Pipe Materials
27 15.12.10 Welding Of Structural Steel Jan 2017
(Amendments/Supplements To AWS D1.1)
28 15.12.11  Welding of 13Cr Pipelines and Related Facilities Apr 2019
(Amendments/Supplements to DNVGL-ST-F101
Appendix C & D)
29 15.13.01 ※ Thermal Insulation (Amendments/Supplements to Apr 2019
the CINI Manual)
30 15.13.02 Acoustic Insulation for Piping Dec 2016
31 15.13.05 Thermal Insulation for Subsea Components Dec 2016
32 15.20.03 ※ Protective Coatings and Linings Jun 2019
33 15.20.04 ※ Internal Cement Lining of Carbon Steel Pipes Apr 2019
35 15.20.06 ※ Electroless Nickel Plating (Amendments/ Apr 2019
Supplements to ASTM B 733)
36 15.20.07 Rubber Lining on Process Equipment Feb 2016
37 15.20.10 ※ Glass-Lined Steel Equipment and Piping Apr 2019
38 15.20.11 ※ Cathodic Protection for New Fixed Offshore Steel Apr 2019
Structures (Amendments/Supplements to DNV-
RP-B401)
PTS 00.01.01
INDEX TO PTS June 2019
Page 21 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
39 15.20.14 ※ Cathodic Protection System For Metallic Piping Oct 2018
(Amendments/ Supplements to NACE SP 0169)
40 15.20.15 Cathodic Protection System for Storage Tank & Oct 2016
Pressure Vessel (Amendments/ Supplements to
NACE and API Standards
41 15.20.16 ※ Preservation of Equipment, Piping and Facilities Apr 2019
42 15.23.01 ※ Evaluation of Pipeline and Pressure Vessel Steels Apr 2019
for Resistance to Hydrogen-Induced Cracking
(Amendments/Supplements To NACE TM0284)
43 15.30.01 Radiographic Testing Nov 2017
44 15.30.02 Ultrasonic Examinations Jan 2017
45 15.30.03 Automated Ultrasonic Testing (AUT) and Dec 2016
Engineering Critical Assessment (ECA)
Requirements for Pipelaying
(Amendments/Supplements to DNV-OS-F101
Appendix A & E)
46 15.30.04  Non Destructive Testing for Surface Defect Apr 2019
Detection (Magnetic Particle Testing and Dye
Penetrant Testing)
49 15.40.01 PETRONAS Risk-Based Inspection (PRBI) Dec 2016

2.7 SKG 16 – PROCESS

No New PTS New PTS Title PSR Date of


Number Endorsement
1 16.00.01 SI Quantities and Units Mar 2016
2 16.01.01 Offshore Facilities Design for Simultaneous Dec 2016
Production & Drilling (SIPROD)
3 16.11.01 Chemical Cleaning for Steam Generation System Jul 2017
4 16.12.01 Heat Transfer Equipment Fouling Factor Sept 2016
5 16.31.02 Glycol-Type Gas Dehydration Systems Nov 2017
6 16.31.03 Acid Gas Removal Unit (Solvent Based) Yes Oct 2017
7 16.32.01 Water Wash Injection System In Hydroprocessing Yes Aug 2017
Units For Mitigation Of Fouling And Corrosion
8 16.34.01 Liquefaction and Handling of Liquefied Natural Yes Nov 2017
Gas (LNG)
9 16.38.01 Sludge Treatment Facilities Nov 2017
16.38.02  Biological System for Wastewater Treatment Jan 2019
10 16.39.01 Hot Oil System Yes Jun 2017
11 16.39.02 Fuel System Yes Oct 2017
12 16.39.04 Corrugated Plate Interceptor (CPI) Jun 2017
13 16.39.06 Diesel Fuel System Yes Oct 2017
14 16.39.07 Instrument Air and Instrument Gas System Yes Jan 2017
PTS 00.01.01
INDEX TO PTS June 2019
Page 22 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
15 16.39.08 Nitrogen/Oxygen Supply and Distribution Yes Nov 2017
Systems
16 16.39.09 Steam, Boiler Feed Water and Condensate Yes Oct 2017
Systems
17 16.39.10 Closed Loop Cooling Water System Design Nov 2017
18 16.40.01 Plant Information Management System (PIMS) Oct 2017
16.40.02  Process Control Narrative Specification Nov 2018
19 16.43.01 Advanced Process Control Oct 2016
20 16.47.01 Operator Training Simulator (OTS) System Nov 2016
21 16.50.01 Design Conditions : Temperature, Pressure & Yes May 2017
Toxicity
22 16.51.01 Process Flow Diagram (PFD) and Piping and Apr 2017
Instrumentation Diagram (P&ID)
23 16.51.02 Safeguarding Memorandum (SM) And Process May 2017
Safeguarding Flow Diagram (PSFD)
24 16.51.03 Design Of Once-through Seawater Cooling Yes Jun 2017
Systems
25 16.52.01 Liquefied Petroleum Gas (LPG) System Yes Jan 2017
26 16.52.02 ※ Wastewater Treatment System Apr 2019
27 16.52.03 Chemical Injection Systems Yes Jan 2017
28 16.52.04 Design of Pressure Relief, Flare and Vent Systems Yes Jan 2017
29 16.52.05 Gaseous Oxygen Systems Yes Jan 2017
30 16.52.06 Column Internals Oct 2017
31 16.52.09 ※ Two Phase Gas and Liquid Separator Apr 2019
32 16.52.10 ※ Liquid-Liquid Separator And 3-Phase Separator Apr 2019
33 16.52.11 Filters For Hydroprocessing Feed Dec 2016
34 16.52.12 Steam Jet Vacuum Ejector System Oct 2017
35 16.52.13 Process and Surface Drainage System for Yes Jul 2017
Upstream and Downstream Facilities
36 16.52.14 ※ Loading Facilities For Bulk Road Vehicles Yes Jan 2019
37 16.52.15 ※ Produced Water Treatment System Jan 2019
38 16.52.16 ※ Water Injection System Jan 2019
39 16.52.17 ※ Produced Sand System Apr 2019
40 16.52.18 Safety System for Wellhead Production Facilities Yes Feb 2016
41 16.52.19 Refrigeration System Oct 2017
42 16.53.01 Overpressure And Underpressure - Yes Oct 2017
Prevention and Protection
43 16.53.02 Emergency Depressurizing And Sectionalizing Yes Oct 2017
44 16.53.03 Mechanical Locking System for Pressure Relief Yes Jan 2017
Devices
45 16.53.04 Steam Injection Systems for Steam Cracking Units Yes Jan 2017
46 16.54.01 Water Based Fire Protection Systems For Yes Jan 2017
Offshore Facilities
PTS 00.01.01
INDEX TO PTS June 2019
Page 23 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
47 16.55.01 Design of Multi-Pipe Slug Catchers Yes Dec 2017
48 16.62.01 Laboratory Design and Operation Aug 2017
49 16.63.01 Third-party Laboratory Data Quality Management Mar 2017
50 16.71.01 Hazardous Area Classification Yes Jan 2017
(Supplements/Amendments to International
Standards)
51 16.71.03 Hazards and Operability ( HAZOP ) Study Yes Jun 2017
52 16.71.04 Quantitative Risk Assessment (QRA) Jun 2017
53 16.71.05 Physical Effects Modelling Jun 2017
54 16.72.01 Offshore Facilities Life-Saving Appliance Yes Dec 2016
Requirements (Amendments/Supplements to
SOLAS and LSA Code)
57 16.73.01 ※ Fire Safety For Onshore Facilities Yes Dec 2018
58 16.74.02 ※ Human Factors Engineering – Valve Criticality Apr 2019
Analysis

2.8 SKG 18 – GHSE

2.8.1 These are the list of PTS that were transferred from ENGINEERING to GHSE.

No New PTS New PTS Title PSR Date of


Number Endorsement
1 18.54.10 Offshore Temporary Refuges Yes 2017
2 18.22.03 Design of Offshore Living Quarters 2017
3 18.53.15 Layout of Offshore Facilities Yes 2017
4 18.22.04 Control and Mitigation of Fires and Explosions on 2017
Offshore Production Installations
5 18.53.09 Human Factors Engineering In Projects 2016
6 18.53.10 Human Factors Engineering - Application During Delisted and
Construction combined with
PTS 18.53.09
7 18.55.06 Helidecks on Fixed and Mobile Offshore Delisted and
Installations combined with
PTS 18.56.02

2.9 SKG 19 – PROJECT MANAGEMENT

No New PTS New PTS Title PSR Date of


Number Endorsement
1 19.10.01 Fixed Offshore Structures Fabrication May 2016
2 19.10.02 ※ Project Documentation (Upstream) Jun 2018
3 19.30.02 ※ Installation of Offshore Structures: Jacket and Dec 2018
Topsides
4 19.30.03 Load-Out And Sea-Fastening For Upstream Mar 2016
Facilities
PTS 00.01.01
INDEX TO PTS June 2019
Page 24 of 47

No New PTS New PTS Title PSR Date of


Number Endorsement
5 19.30.04 Installation of Offshore Pipelines and Risers Apr 2016
(Amendments/Supplements to ASME B31.8,
ASME B31.4 and DNV OS F101)
6 19.30.05 Marine Transportation for Structure and Dec 2016
Linepipes (Amendments/Supplements to DNV-
OS-H101, DNV-OS-H202 and API RP 5LW)
7 19.30.06 Installation of Non-Conventional Offshore Oct 2017
Structures
8 19.30.07 Flexible Pipeline Installation Oct 2017
(Amendments/Supplements to API RP 17B)
9 19.40.01 ※ Pressurized Habitat Apr 2019
10 19.40.02 ※ Facilities Handover Apr 2019
11 19.60.01 Quality Management for Projects Nov 2017

2.10 SKG 20 – MARITIME

No PTS Number New PTS Title PSR Date of


Endorsement
1 20.10.01 Oil, Chemical and Gas Tanker Vetting Nov 2017
Requirement
2 20.11.01 Offshore Support Vessel and Marine Support Jun 2017
Craft Vetting
3 20.20.01 ※ Safety Requirements for Mobile Offshore Units Apr 2019
4 20.50.01 ※ Oil Loading and Discharging Hoses for Offshore Apr 2019
Mooring Installation

2.11 SKG 25 – DRILLING

No New PTS New PTS Title PSR Date of


Number Endorsement
1 25.00.21 Well Master Standards Compendium Yes Feb 2016
PTS 00.01.01
INDEX TO PTS June 2019
Page 25 of 47

3.0 PTS MAPPING ACCORDING TO SKG

3.1 00 - GENERAL
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 00 (General) EEx 00
01 EEx
02
03
04
05
06
07
08
09
EDO 10
11 EDO
12
13
14
15
16
17
18
19

3.2 SKG 11 – CIVIL, STRUCTURE & PIPELINE


Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 11 (Civil, Structure & General 00 General
Pipeline) 01
02
03 Floaters
04
05
06
07
08
09
Roads, 10 Design
Buildings, 11 Site Investigation
Foundations Infrastructure
12
PTS 00.01.01
INDEX TO PTS June 2019
Page 26 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
13 Foundation & Sub structure
14 Buildings
15 Upper Structure
16 Maritime
17 Inspection & Maintenance
18
19
Structure 20 Safety
21 Survey
22 Design
23 Construction
Installation & Pre-
24 commissioning
25 Integrity
26 Subsea Structure
27 Geotechnical
28
29
Pipeline 30 Pipeline Design
31 Pipeline Mechanical Design
Pipeline Cathodic
32 Protection & Coating
33 Pipeline Safety
Construction &
34 Commissioning
35 Inspection & Maintenance
36 Integrity Management
Advance Design &
37 Assessment
38
39
Metocean 40
41
42
43
44
45
46
47
48
49
50
PTS 00.01.01
INDEX TO PTS June 2019
Page 27 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
PTS 00.01.01
INDEX TO PTS June 2019
Page 28 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
92 Drawing
93
94
95
96
97
98
99

3.3 SKG 12 - MECHANICAL

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 12 (Mechanical) General 00 General
01 Rotating
02 Static Unfired
03 Piping
04 Static Fired
05 Reliability
06 Subsea
07
08
09
Rotating 10 Driver / Prime Mover
Engineering 11 Driven Equipment
12 Auxiliaries & System
13
14
15
16
17
18
19
Unfired Static 20 Pressure Vessel
Engineering 21 Heat Exchanger
22 Storage Tank
23 Lifting Equipment
24 HVAC
25 Auxiliaries & System
PTS 00.01.01
INDEX TO PTS June 2019
Page 29 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
26
27
28
29
Piping 30 Design & Fabrication
Engineering 31 Pipe Classification
32 Valve
33 Fire Fighting
34 System
35
36
37
38
39
Fired 40 Boiler
Equipment 41 Reformer / Fired Heater
Engineering
42 Flare/ stack
43 System
44
45
46
47
48
49
Subsea 50 System
51 Umbilical
52 Intervention
53 Control
54 Hardware
55
56
57
58
59
Reliability 60
61
62
63
64
65
66
PTS 00.01.01
INDEX TO PTS June 2019
Page 30 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
67
68
69
Reserved (TBA 70
by 71
Mechanical)
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99
PTS 00.01.01
INDEX TO PTS June 2019
Page 31 of 47

3.4 SKG 13 - ELECTRICAL


Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 13 (Electrical) General 00 Design
01 Power Quality
02 Testing & Commissioning
03 Facilities & Tools
04 Condition Monitoring
05 Package Equipment
06
07
08
09
Distribution 10 Transformer
11 Switch Gear
12 UPS & Batteries
13 Heating System
14 Cables & Bus duct
15 Lighting
16
17
18
19
Generation & 20 Induction Machine
Drives 21 Synchronous Machine
22 Drive & Starter
23 Renewable
24 Small DC Power
25
26
27
28
29
Protection & 30 ENMC
Control 31 Protection
32
33
34
35
36
37
38
PTS 00.01.01
INDEX TO PTS June 2019
Page 32 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
39
Explosion 40 Maintenance
Proof 41 Assessment
Installation
42 Design & Selection
43
44
45
46
47
48
49
LPS/EMC 50 EMC
51 LPS
52
53
54
55
56
57
58
59
Safety 60 Inspection
61 Safety Rules
62
63
64
65
66
67
68
69
Subsea 70
71
72
73
74
75
76
77
78
79
PTS 00.01.01
INDEX TO PTS June 2019
Page 33 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99

3.5 SKG 14 – INSTRUMENT & CONTROL


Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 14 Instrument/Control General 00 General
01
02
03
04
05
06
07
08
09
Instrument & 10 Field Instrument
Control Process Control &
11 Monitoring System
12 Safeguarding System
13 Fired Equipment
14
15
PTS 00.01.01
INDEX TO PTS June 2019
Page 34 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
16
17
18
19
Machinery 20 Anti-Surge Control System
21 Machine Control System
22
23
24
25
26
27
28
29
Measurement 30 Metering
31 Analytical
32 Environmental Analytical
33
34
35
36
37
38
39
Telecommunic 40 Radio/PAGA
ation 41 Cable
42
43
44
45
46
47
48
49
Subsea 50 Control System
Instrumentati 51
on
52
53
54
55
56
PTS 00.01.01
INDEX TO PTS June 2019
Page 35 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
PTS 00.01.01
INDEX TO PTS June 2019
Page 36 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
98
99

3.6 SKG 15 – MATERIAL CORROSION & INSPECTION

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 15 Material, Corrosion General 00 General
and Inspection 01 Material Selection
02 QA/QC
03 Mill/Manufacturing Audit
04 Corrosion Management
05 Cleaning
06 Records
07
08
09
Materials 10 Metallic
11 Non-Metallic
12 Welding
13 Insulation
14
15
16
17
18
19
Corrosion 20 Corrosion Protection
21 Corrosion Control
22 Corrosion Monitoring
Corrosion Testing/
23 Analysis
Corrosion Prediction &
24 Modelling
25
26
27
28
29
Inspection Non Destructive testing
30 (NDT)
PTS 00.01.01
INDEX TO PTS June 2019
Page 37 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
31 Equipment Inspection
32 Welding Inspection
Double Wall LNG Tank
Hydrostatic Test using
33 Seawater
34
35
36
37
38
39
Asset Integrity 40 PRBI
41 Fitness for service (FFS)
42 Failure Investigation
43 Integrity Audit
44 Preservation
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
PTS 00.01.01
INDEX TO PTS June 2019
Page 38 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99

3.7 SKG 16 – PROCESS

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 16 Process Engineering General 00 General
01
02
03
04
05
PTS 00.01.01
INDEX TO PTS June 2019
Page 39 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
06
07
08
09
Operation 10General
11Start Up & Commissioning
12Shut Down
Maintenance &
13 Warehousing
14
15
16
17
18
19
Production 20 General
Planning 21
22
23
24
25
26
27
28
29
Technology 30 General
31 Treating
32 Reaction
33 Separation
34 Cryogenic
35
36
37
38
39 Utility & Offsite
Optimization 40 General
Process Data
41 Management
42 Regulatory Control
43 Advanced Process Control
44
PTS 00.01.01
INDEX TO PTS June 2019
Page 40 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
45 Process Modelling
46 Online Modelling
Operator Training
47 Simulator
48
49
Design 50 General
Design Philosophy &
51 Deliverables
Equipment & System
52 Design
53 Safety Design
54 Fire Safety Design
55
56
57
58
59
Analytical 60 General
Sampling, Techniques &
61 Test Method
62 Design
63
64
65
66
67
68
69
Process Safety 70 General
Process Safety Risk
71 Assessment (PSRA) Tools
72 Offshore Specific
73 Onshore Specific
74
75
76
77
78
79
80
81
PTS 00.01.01
INDEX TO PTS June 2019
Page 41 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99

3.8 SKG 19 – PROJECT MANAGEMENT

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 19 Project Management General 00 General
01 Resource Management
Infra & Admin
02 Management
Document & Records
03 Management
04
05
06
07
08
09
General Project General Project
Management 10 Management
11
12
13
PTS 00.01.01
INDEX TO PTS June 2019
Page 42 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
14
15
16
17
18
19
Project Risk 20 Project Risk Management
Management 21
22
23
24
25
26
27
28
29
Project Project Construction
Construction 30 Management
Management 31
32
33
34
35
36
37
38
39
Project Comm. Project Comm.
Management 40 Management
41
42
43
44
45
46
47
48
49
Project HSE 50 Project HSE Management
Management 51
52
PTS 00.01.01
INDEX TO PTS June 2019
Page 43 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
53
54
55
56
57
58
59
Project QA QC Project QA QC
Management 60 Management
61
62
63
64
65
66
67
68
69
Project HSE 70 Project HSE Management
Management 71
72
73
74
75
76
77
78
79
Project Control Project Control
Management 80 Management
81
82
83
84
85
86
87
88
89
90
91
PTS 00.01.01
INDEX TO PTS June 2019
Page 44 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
92
93
94
95
96
97
98
99

3.9 SKG 20 – MARITIME

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 20 Maritime General
00 General
01
02
03
04
05
06
07
08
09
Marine 10 Ship Vetting & Audit
Assurance Offshore Support Vessel &
Marine Support Craft
11 Procedures
12
13
14
15
16
17
18
19
Marine 20 Marine Safety of MODU
Operations 21 Use of Small Marine Craft
22 Offshore Marine Safety
Load Out and Sea
23 Fastening
PTS 00.01.01
INDEX TO PTS June 2019
Page 45 of 47

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
24
25
26
27
28
29
Port & Marine Handling Bulk Liquid at
Terminal 30 Jetty
Operations 31
32
33
34
35
36
37
38
39
Ship 40
Construction 41
42
43
44
45
46
47
48
49
Marine Oil Loading & Discharging
Equipment Hoses for Offshore Marine
50 Facilities
Offshore Facilities Life
51 Support Appliances (LSA)
52
53
54
55
PTS 00.01.01
INDEX TO PTS June 2019
Page 46 of 47

3.10 SKG 25 – DRILLING

Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 25 Drilling General 00 General
01 Well Engineering
02 Well Construction
03 Well Completions
04 Well Intervention
PTS 00.01.01
INDEX TO PTS June 2019
Page 47 of 47

4.0 BIBLIOGRAPHY

In this PTS, reference is made to the following Standards/Publications. Unless specifically


designated by date, the latest edition of each publication shall be used, together with any
supplements/revisions thereto:

PETRONAS STANDARDS
Index to PTS PTS 00.01.01
Requirements, General Definition of Terms, Abbreviations & PTS 00.01.03
Reading Guide