Professional Documents
Culture Documents
Grating Black Start Plan at T/G El (+) 0.300 (3 Nos) Grating Black Start Plan at T/G El (+) 0.100 (2 Nos)
Grating Black Start Plan at T/G El (+) 0.300 (3 Nos) Grating Black Start Plan at T/G El (+) 0.100 (2 Nos)
PLANT NOTES:
NORTH
STEEL CONTRACTOR NOTES
1. ALL DIMENSIONS ARE IN MM (U.N.O.)
UTM TRUE 2. NO DIMENSIONS TO BE SCALED OFF THE DRAWING ONLY WRITTEN DIM TO BE FOLLOWED.
H NORTH 3. WELDING ELECTRODE SHALL COMPLY TO AWS A5.1 E70xx UNLESS NOTED OTHERWISEREAD THIS H
DRG. WITH RESPECT TO RELEVANT STRUCTURAL, M&E DRGS. DISCREPANCY &
FABRICATION/ERECTION DIFFICULTIES IF ANY SHALL BE BROUGHT TO OUR NOTICE BEFORE THE
COMMENCEMENT OF FABRICATION.
4. CONNECTION BOLT SHALL BE GRADE ASTM A325 ( HIGH STRENGTH BOLT )
N GRATING SPECIFICATIONS.
Mesh/Pitch : 30x100mm
Pattern : N100
F F
REMOVABLE REMOVABLE
GRATING GRATING
REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE
AJV-DPW-10-000-MP-PLP-0002 POWER PLANT AREA PLOT PLAN
E E
AJV-DPW-00-580-CL-DWG-0127 CLEAN DRAIN FLASH TANK PIT - LAYOUT AND RC DETAILS
AJV-DPW-10-130-MP-GAD-0006 GENERAL ARRANGEMENT STEAM TURBINE AND AIR COOLED
CONDENSER AREA
AJV-DPW-00-580-CL-DWG-0022 STEEL STANDARD DRAWING-GRATING AND HANDRAIL DETAIL
AJV-DPW-00-580-CL-DWG-0255 CLEAN DRAIN FLASH TANK PIT - FRAMING PLAN & DETAILS
GRATING BLACK START PLAN AT T/G EL(+)0.300 GRATING BLACK START PLAN AT T/G EL(+)0.100
(3 Nos) (2 Nos)
32 THK GRATING AND SPAN WILL BE SHORTER DIRECTION UNO. 32 THK GRATING AND SPAN WILL BE SHORTER DIRECTION UNO.
(REF.CLIENT DRG.No.AJV-DPW-00-580-CL-DWG-0095)SHT.01 OF 01-R0 (REF.CLIENT DRG.No.AJV-DPW-00-580-CL-DWG-0095)SHT.01 OF 01-R0
D D
31-JAN-21
17-JAN-21
C C
B B
PETROJET
THE PETROLEUM PROJECTS
AND TECHNICAL CONSULTATIONS CO.
A1 (841mm x 594mm)
AOD10-VN03-UPV-1106172