Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL LEGEND GENERAL INFORMATION

AW = drain water KW = cold water = above finished floor


Dat = dataline KWw = cold water soft SFB = separate filling-boiler
EZ = power line (supply) LR = VEW = demineralized water
FD = floor opening CNS = stainless steel ( inox ) WD = wall opening
HW-VL = hot water flow MK = supply chanell WS = wall slot
HW-RL = hot water return PA = equipotential conductor WW = warm water
KB = STL = control line WWw = warm water soft

700
593

285

AFFL
+40mm

PA

- - - -

Index Datum / Date Name

Das Urheberrecht an dieser Zeichnung verbleibt bei der HOBART GmbH.

This documnet contains proprietary and confidential data of HOBART GmbH. No disclosure, reproduction or use of any part there of may be made
CH without written permission of HOBART GmbH.
CH
EZ HOBART GmbH Tel.: +49(0)781.600-0
AW Fax.: +49(0)781.600-2319
KW 77656 Offenburg, Germany www.hobart.de

Datum / Date: Project:


27.02.2017
Gezeichnet / Drawn by:
R.Leonhardt / DW

-
Order-No.: Zeichnungsnummer / Drawing-No.:
Projectmanager:
1:20

release 07.2017 DIN A3 Blatt / Sheet 1/1

You might also like