E-in-C's Branch List 'A' & Guidelines For Use, Formulating Specifications and Sourcing of Steel For Mes Works
E-in-C's Branch List 'A' & Guidelines For Use, Formulating Specifications and Sourcing of Steel For Mes Works
E-in-C's Branch List 'A' & Guidelines For Use, Formulating Specifications and Sourcing of Steel For Mes Works
\ cc- 6
Tele: 23018582 Jt Dir Gen of Works (Des)
Military Engineer Services
Engineer-in-Chief's Branch
Kashmir House
New Delhi-110 011
1. Further to the policy issued vide this HQ Policy letter No. 11/2004 under E2(Des)
letter No. 83044/Stee1/219/E2(Des-3) dated 24 Jan 05 and 83044/Stee/ 350/E 2 Des-3
dt 26 Jul 05.
2. After the issue of above Policy letter, suggestions received from various
formations to improve the Guidelines on the subject. Deliberations were held at this HQ
and it emerged that there is a need to revise above Policy letter in order to provide
wider base for availability to the contractors. Accordingly, the revised Policy letter is
hereby issued to include the procurement of TMT Steel, Structural Steel, Fabric
reinforcement and GI Sheets. This Policy letter will supersede our Policy letter referred
above and is to be read in conjunction with SSR Part-I and relevant BIS Codes. The
guidelines for procurement of Steel are only for the purpose of guidance to the
tendering authority.
(c) Galvanised Steel Sheets (Plain & Corrugated) conforming to IS: 277
5. Materials
(a) The Galvanised Iron Sheets & Fabric Reinforcement for Colit;re'ay to
be supplied by the contractors shall be ISI marked and shall be procured from
Main manufacturers.
(b) The Structural steel supplied by the Contractor will be procured from
Main producers like SAIL, Rashtriya 'spat Nigam Ltd, IISCO, TISCO or
Secondary producers who manufacture structural steel out of 151 marked billets
and are having BIS Certification of ISI marking on their Products and approved
by this HQ.
(c) TMT Steel supplied by the Contractor will be procured from Main
producers of steel like TISCO, SAIL, Rashtriya lspat Nigam Ltd, IISCO,
Reinforcing Bars upto 16 mm dia and less can be procured from the Secondary
EVCON Turbo process of
producers having Thermex, Tempcore or
manufacturing TMT Steel and approved by this HQ.
6. Procurement
The GE for every lot of steel shall obtain the particulars of the
(a)
manufacturer/supplier of steel from the contractor separately. The form given at
Appendix 'A' will be used for this purpose.
The site staff and GE shall verify the original documents in support of the
(b)
purchase of steel and will retain certified true copy of the results in GE's office.
The CEs will ensure that contractors place their demand/ requisition of
(c)
steel with adequate lead-time. The steel will be procurred from the storage
depots of the malts producers/approved Secondary producers and not from their
authorised agen/dealers as the authorised agents deal with the steel
manufactured by more than one manufacturer.
The authorised conversion agents of the main producers for TMT steel
(d)
can supply the steel to the contractors provided the main producers have given
such directions in a specific sale/purchase order and they are producing TMT
technology. In such case the
steel using Thermex/Tempcore/EVCON Turbo
purchase voucher or cash memo shall be from main producers. The difference
between "Authorised Conversion Agent" and "Authorised Agent/Dealer" needs
to be understood clearly. The purchase of steel when allocated through the
"Authorised Conversion Agent" by the main producer will have its quality assured
by the main producers. However the steel when purchased by a contractor
directly from the "Authorised Conversion Agent" or from "Authorised Dealer /
Agent" will not have its quality assured by the Main producers. It is therefore
necessary and mandatory to ensure that the contractor does not purchase steel
directly from the "Authorised Conversion Agent" or from "Authorised
Dealer/Agent" of the Main producer.
ke}}-- It has been confirmed by the Main producers that they would honour any
hich is 10 MT or more in quantity. The lower limit of 10 MT has been laid
P7r4' ( orde
—
., Dom_
■
4
-4
Jvz,r1:1,c)11'602
tSection Officer
Dv. No.
(,j
because of minimum one truckload would be sold by the main producers. The
quantity of 10 MT can be mix of various sections/diameters of the steel and not
necessarily be a single section/diameter. The approved Secondary producers
have confirmed that they will honour any order from MES contractors
irrespective of the quantity.
(g) At present the list of secondary producers for TIVIT steel, which stands
approved, is being forwarded alongwith. This HQ is making efforts to identify
more secondary producers on merits manufacturing adequate quality structural
steel, TMT bars sheets for inclusion in the list of approved secondary producers.
11. The steel directly procured by the department for issue under schedule `B'
required under exceptional circumstances will also be procured from main
producers/approved Secondary producers.
(J B Sharma)
CE
Jt DG (Design)
for E-in-C
Copy To: -
Internal
E2 (Army), E2 (Navy), E2 (AIR), E6, E8, E2W (PPC)
Appendix 'A'
6. Types of Steel, Dia & Qty (a) type: TMT/CRS (b) Dia—mm (c) Actual Wt—MT (d) Conversion Wt--MT
1. Bars size less than 10mm 1 Sample (3 specimens) for each test
for every 25 tonnes or part thereof.
Structural Steel
NOTE :- For various tests, acceptance criteria, tolerance etc. refer to Appendix 'A'
and relevant BIS codes.
Tele : 23019694 Dte Gen of Works (PPC)
Engineer—in-Chiefs Branch
Army Headquarters
Kashmir House
New Dehi — 110011
(i) That the relevant BIS Cods have been followed for
the consideration of loads for design of the bldgs (DL, LL,
WL, EL & Snow Load etc).
(iv) The hoist load, hook load etc have been taken into
consideration in the design.
(Sanjay S arma)
SE
Dir (Pol)
for E-in-C
Internal
E-2 (Est)
E-2 (Army)
E-2 (Air Force)
E-2 (N&DP)
E-4 (Utility)
E-5 (Budget)
CA-I
CA-II
E-8 (Contracts)
E-2 (Design) W.r.t. your note No. 22749/Misc/E2 (Design)
Dt 31 Jan 2006.
Policy No —5 2 6"
Tele 23018582 Jt Dir Gen of Wor s (Des)
Engineer-in-Chief's Branch
Military Engineer Services
Kashmir House
New Delhi-110 011
A/90154/ J j /E2 Des-3 \ Mar 2006
E-in-C List 'A' & 'B'
1. Policy letter No 5(2) 97-D0-11/D(Works) dated 02 Jan 98 has been issued by the
Government of India, Min of Defence whereby cement has been made contractors supply
for MES works. Accordingly, the guidelines were issued vide our works Policy No 04/98
(Letter No A/90154/E2 Des-1 dated 09 Mar 98) to facilitate acceptance of cement and to
exercise quality control. Due to difficulty in availability of Ordinary Portland Cement (OPC)
from the manufacturers as intimated by Zonal Chief Engineers and builders, it has now
been decided to use Pozzolana Portland Cement (PPC) in addition to OPC for the MES
works. The guidelines for use of PPC and OPC for MES works are as elucidated in
subsequent pares. These shall be read in conjunction with the provisions laid down in SSR
Part-I, Section 4 (Para 4.3). The Guidelines shall be suitably incorporated in the contracts
for regulating the supply and use of cement in works.
2. Types of Cement. The details of various types and grades of cement are
enumerated below :-
(i) Ordinary Portland cement. Grade 33 (IS:269-1989).
(ii) Ordinary Portland cement. Grade 43 (IS : 8112-1989).
(iii) Ordinary Portland cement. Grade 53 (IS : 12269-1987).
(iv) Rapid Hardening Portland cement (IS : 8041-1990).
(v) Portland Pozzollana Cement (IS : 1489-1991).
(vi) High Allumina Cement (IS : 6452- 1989).
(vii) Sulphate Resisting Portland Cement (IS : 12230-1988).
3. The type of cement to be selected will depend upon the specific use in the work.
Since the price difference between 43 grade and 33 grade OPC is marginal, use of 43
grade OPC in normal structural work is recommended.
4. Control on Cement Supplied by Contractors. Following checks shall be carried
out before the cement supplied by the Contractor is accepted and is approved for
incorporation in the works-
(a) Procurement. The Cement supplied by the Contractor will be procured from
main producers of cement. The particulars of the manufactures of cement
along with the date of manufacture shall be obtained from the Contractor for
every lot of cement separately. The documents in support of the purchases
of cement shall be verified by the site staff and GE.
Cont...2
-2-
(b) Manufactures . The following are the main producers of OPC & PPC :-
Besides the above, only OPC can be procured from the following producers
also :-
(i) PPC shall be allowed to be used in MES works only after ascertaining
non availability of OPC in their region by the Chief Engineer concerned.
(ii) Zonal CEs are required to ensure that PPC meets the strength criteria
of 43 Grade OPC as laid down in IS-8112-1989.
(iii) The minimum period before striking formwork given in clause 11.3.1 of
IS. 456-2000 is to be suitability modified at sites by the Zonal CEs.
(iv) In cold climate regions and important structures like Overhead
Resevoirs, Underground Sumps, Prestigeous Buildings and Buildings with
spans 10 m or more only OPC shall be used.
(v) Mixing of OPC & PPC shall not be allowed in a work.
(vi) Direction for price adjustment for use of PPC in place of OPC shall be
issued separately by E8 Section this HQ.
(vii) While procuring PPC, the following requirements are to be ensured
and certificate to that effect is to be obtained for each batch from the
manufacturer.
(aa) The quality of fly ash is strictly as per IS 1489 (Part 1)-2002.
(bb) Flyash is inter-ground with clinker not mixed with clinker.
Cont...3
-3-
Cont...4
Following points, inter alia, shall be suitably covered in the Contract
Specifications:-
6. Chief Engineers Zone will prepare the necessary specifications after taking
into consideration the aforesaid points and these are required to be approved from
their Chief Engineer Command before inclusion in the tenders at various levels.
7. This Policy has been approved by E-in-C and supersedes all previous policy
letters on the subject..
8. Please acknowledge.
(JB Sharma)
CE
Jt DG (Des)
For E-in-C
Copy to :-
Internal:-
Compressive
Insoluble Resdue
Loss on ignition
Magnesium ( %)
a) _J '3'
Lime Saturation
0 Strengths( Mpa) ,;•-•
--,,
Anhydride(%)
it)--
Aclumina Iron
Factor ( Ratio)
Ratio(Ratio)o
'tas---- ..o (3)
5-:
.0 0) cp o) a)
Alkailes(%)
co a) .- m C c (.) (,)
01
i..-. c .c- (D
Sulphuric
(0 --. CIL) , cal - If. C = 0 -0 a9
(.73 ----. c.)., >,
41.) cn 73
17:-
Dz D C) vi --- 05 tz >-.
ai a. cs)10as',7"0
) 0
o Tti CL) 0 0 E:
—I E
a)
C ..--
cz, •W 0 —., g c 7C-
(%0
(%)
o D al D .._.
C c E ,-, ,..... co a) w ....,
''' o 0
,_ f-- 2, CD 0
1
in < in 0 CO < _E i-: LT_ i= o 0 CV
As per relevant
IS
As per manufa-
cturer's test
certificate
As per random
test certificate
Accepted/Rejected
Remarks with Signature
Engineer-i n-Charge Garrison Engineer
Contractor Junior Engineer)
ele . 2301.9694
Policy letter: 04/2006
Engineer-in Chief's Branch
DDGW(PPC)/Works Dte
Army Head juarters
Kashmir House DHQ PO
New Delhi — 110011
1. It has been observed that several Comd & Higher Power Works include new E/M installations
which are to be manned on completion of the work for routine running and attending to the
complaints. All such installations do require, and are authorized, a telephone connection. However,
maintenance services suffer badly for want of telephone sanction for a long time.
2. Similarly, the buildings constructed under such projects often present an ugly look after a few
years of completion due to fading out of the exterior painting / fungous growth / blackening of the
fascia after rains and poor maintenance of flooring. This can be avoided by providing superior
specifications but this is generally not feasible due to financial constraints / authorization. However,
to provide a long lasting finish, there are number of protective coatings and flooring materials
presently available in the market which can be applied on external surfaces of buildings and for
flooring in all the MES installations.
3. In view of above, the provision of the following items of work may be included in the BPs and
AEs for sanction of the CFA at the NA stage itself; wherever MES installations are involved:-
(a) Provision of telephone in the estimates of the concerned E/M service, where any
new installation is coming up and which requires manning and operation for maintenance
after. completion.
(b) Provision of acrylic based exterior paints in place of white wash/cement based paint
as a special item in all new works / spl repairs.
(Sanjay Sharma)
5.E
[)ir (Pol)
For E-in-C
Copy to:-
Internal
1. To improve the existing design of charpoys, certain samples with revised specifications were got
manufactured from the local Zonal CEs to overcome the following problems in the existing pattern:-
(a) Sagging & frequent replacement of Niwar, thus resulting in user dissatisfaction.
(b) Breakages of GI charpoy from threaded joints and Bed Niwar from wooden joints.
(c) Restrictions on use of wood due to its short life and as part of the national policy.
(d) High maint/capital cost in the long run.
2. After detailed deliberations with the officers of Army and Arch Dte, the following revised specifications
of the charpoys, as indicated against each, have been approved by the E-in-C..
(a) Charpov for OR.
Existinq Specifications as per FD 220. 32 mm dia med grade GI pipe with Nylon
Niwar.
(ii) Revised Specifications. To be manufactured as per following specifications.
(aa) Rails - 65 x 25 mm rect tube x 16 gauge with 2 stiffeners of 25 x 25 mm Sq
tube x 16 gauge.
(ab) Legs - 32 x 32 mm Sq tube x 16 gauge with stiffener on each side.
(ac) Top - 12 mm thick commercial ply with beeding all around.
(ad) All metallic joints to be welded and painted / powder coated.
(b) Foldi g Charpov
(i) Existing Specifications. 25 mm dia conduit pipe x 16 gauge with Nylon Niwar
(ii) Revised Specifications. 25 mm dia Conduit pipe x 16 gauge with 12 mm thick
commercial ply fixed in 2 pieces with counter sunk screws.
(c) Charpov for JC0s.
(i) Existinq Specifications as per FD -- 227. 60 x 60 mm wooden rails with woodell
legs and cotton Niwar.
continued ----2/-
(ii) Revised Specifications.
To be manufactured as per following specifications.
(aa) Rails - 60 x 25 mm rect tube x 16 gauge,with 2 Stiffners of 25 x 25 mm.
(ab) Legs - 32 x 32 mm Sq tube x 16 gauge.
(ac) Stiffners - 25 x 25 mm Sq tube x 16 gauge between rails and legs.
(ad) Head Rest - 32 x 32 mm Sq tube x 16 gauge frame 200 mm high with particle
board.
(Sanjay Sharma)
SE
Dir (Pol)
For E-in-C
Copy to :-
Internal:-
TS to DGW
E-2(Army), E2 Air, E2 Navy, E2 (Design), E4 (U), E-5 (Budget), E-6, E8
Policy letter: 06/6006
Tele : 23019694 Dte Gen of Works (PPC & Est)
Engineer—in-Chief's Branch
Army Headquarters
Kashmir House
New Delhi — 110011
1. The Study Group was convened at this HQ, to review the list of reports
and returns.
2. The revised list of reports and returns recommended by study group has
been approved by DGW.
3. Revised list of reports and returns for E-1, E-2, E-3, E-4, E-5 and E-8
sections is forwarded herewith. The same will be implemented by 01 Apr 06.
4. No lower formations will further revised this list. In case any addition or
alternation is required, a case will be taken up with this HQ, for the approval of
DGW.
,
----..
( Sanjay Sharma)
SE
Dir (Pol)
For E-in-C
Encls: As stated
TS to DG (Pers)
SO to ADG (Pers)
Internal:
E-2 (ArmY)
E-2 (N&DP)
E-2 (Design)
E-4 (U)
E-5 (Budget)
E-2 (Estt)
E-8
CA-I
CA-II
REVISED LIST OF REPORTS/RETURNS : E4 Sec Appendix 'A'
(EFFECTIVE FROM 01 APR 2006)
SI No Title/Description Periodicity Indicating Initiation Level Intermediate Level and Final Level of
Position and Latest Date Latest Dates of Initiation
Till Reporting
1. Annual Comparative Statement of Elect of Initiation
Yearly Mar GE - 30th Apr
Supply of Previous Financial Yr 15 11 May CE Zone
Annual Return of Electric and Water Supply Yearly Mar GE - 15th May CWE
4. State
of
Agreements of Elect and Water Yearly Dec GE - 20th Jan
Supply with Civil Authorities C\i‘TE1 )11 Jan CE Zone
8. Status/Details of Water and Electric Supply to Yearly Jun GE - 15th Jul CWE - 30 Jul CE Zone
Pvt Consumers/Other Agencies *
A.
4
A
4
A
fi•
A
c
c
YI
C)
D
c
Cl)
CD
C)
n
A/C Installations by IEM next month
O
Demandand Discardof IT Vehicles GE -15th of CWE - 25m of E-in-C (ESP-4)
"
-,
I
K
n_
"1:3
CD
n)
fa)
k.<
SD
CD next month next month
CE Zone 10th &
25th of
CE Comd f ollowing
Month
Statusof Allotmentof MES/SM Nosto Plants Half Yearly Jul/Jan CWE — 20m of nextmonth CE Zone
and Eqpts *
Statusof Plantsand Eqpts Declared BER Half Yearly JuUJan GE - 10m CWE 20m of nextmonth CE Zone
but Awaiting Disposal * next month
FunctioningofChloronomes/ Chlorine Gas Quarterly Jun/Sep/ GE - 10th of CWE - 20th ofnextmonth CE Zone
Cylinder Dec/Mar next month
Serviceability Stateof Sewage & Water T Quarterly CE Zone
6.
9
9
Plants, Pump Sets incl Fire Fighting. AC/Cold
Storage Plants, Lifts, Cranesand DG Sets
etc
• M
Co
• (1) 0
s)
-)
V) 7
( ) <
-. rn
* o 5.
-i
cp 0
3
m
9,
o
9.,
(D
m0
o 1:4
C3 5
m
0
O 0 6.
0 0
0•
C
CU
(S.
CD 9
=1.
0.
0
o
0 CD
w0
CD
0.
LIWOW IX9U 10u103-B/w
o.
9
I
)1
A
1V, einxeuuv
YEARLY STATUSOFWATER / ELECTR IC SUPPLYTOPRIVA TECONSUM
ERS/ OTHER AGENCIES
c
71
3
z
(7) a
0
>
0
0
0'
CD o
ri•
r
ET. 0
O -1
"al 0
0< 0
mc 0
c
3
CD
O
O
0
O
•
O CD
o
0
<
43.
CC)
CO
xauuv ams,i
HALF YEARLY STATUS OFALLOTMENT OF MESNO TOPLANT AND EQUIPM
ENTS
Unit/Fo rmation
2 (l)
Typeof
0 a)
NI
C4
A.
01
0)
....j
on
Anne Y...tre 'C'
HALF YEARLY STATUS OF PLANT / EQPTS / VEHS DECLARED BER BUT AWAITING DISPOSAL
status of Remarks
Qty Declared BER Status of Fixation Status of
Unit/Formation Type of Plant / Declaration to Physical
Ser of MRP
Eqpt I Vehs MSTC for Disposal
No
Declared BER Auction
5 6
3 4
2
Annexure
4. Quarterly return of forecast % over (a) Column 3 & 4 showing different type of
SSR buildings to be merged into one category.
(b) One additional column of fencing, gate
and compound wall to be added
(c) The revised Annex P-4 attached.
5. Quarterly return of accepted No change
contracts
6. Quarterly monitoring delay in One more col after Col No 9 "From CDA to
payment of final bill AAO" to be added. Rev Appx P-6
enclosed.
7. Half yearly return in respect of No change
arbitration cases.
8. Quarterly return of over payment to No change
contractors / recoveries due from
them
9. Quarterly return of cases where No change
aititrators are yet to be appointed.
10. Quarterly return of cases where No change
decision of LA (Defence)/MoD
awaited.
11. Quarterly return in respect of STEs No change
observations
12. Quarterly return in respect of CWEs/ No change
CEs contracts
.1. • • r • • • • JP • P p ,1 .1, 41 D
RULING PERCENTAGE OVER SSR 2004 FOR PREPARATION OF AEs FOR QUARTER ENDING
APPLICABLE DURING QUARTER ENDING
Notes
1. Report will be issued by Zonal CEs. However wherein abnormal variation between same stations of various Zones occurs,
correction will be issued by CE Command within 15 days.
3. 10% extra to be added for works in side factory areas/Ord/Amn depot/Air Force//Navy Tech Area/ Remote locations etc.
4. Percentage indicated above are assessed percentages based on market trend and are not exclusively based on concluded
contracts, excl freakishly high/low accepted contracts.
5. Difference in cost of stores will be shown separately under respective cols, only for stations wherever applicable.
6. Percentage indicated are for normal specifications including internal services as catered for in Zonal Specifications. Any
additional effect of superior specifications to be taken separately.
7. Percentage are for AEs purpose only and not for acceptance of contracts
Annexure P-6 (R)
Formation
SI No CA No Date of Progress
Name of completion Movement of final bills (Dates) made
work and of work during
Name of Date of Submission From From From From From CDA to Qtr
contract of Final bill by Sub GE to CWE to GE to AAO to AAO
Contractor/Prepared Div to CWE GE AAO CDA
by MES GE
1 2 3 4 5 6 7 8 9 10 11
it occ 4) ooc/oC fi 1) ‹) ) t
SI. Title/Description Periodicity Indicating Initiation Intermediate Level and Final level of Remarks
No of report & return Position on Level and Latest dates of initiation reporting
latest date
of initiation
1. 2. 3. 4. 5. 6. 7. 8.
1 Abstract MER Monthly End of Jan, GE- 1" of .CWE - 3rd of month .E-in-C's Br / Only for 3
(Signal/Fax MER) (wef Jan to Feb & Mar month .CE Zone - 5th of month Service HQ. months
Mar only) .CE Comd/ - 10th of month
ACE(L)
2.
Main MER (Capital Monthly End of GE — 5th of .CWE - 10th of month .Comd./ ACE(L)
& Maint works) month month .CE Zone -15th of month .E-in-C's Br /
(Separate for each Service HQ.
service)
3. Progress report on Quarterly 31' Mar GE — 5th of .CWE - 15th of month .E-in-C's Br /
MFAI Cases 30 June month .CE Zone - 25th of month Service HQ.
30 Sep .CE Comd/ - 10th of 2nd
31 Dec month
ACE(L)
4. Progress report on Quarterly 31" Mar GE — 51h of .CWE - 15th of month .E-in-C's Br(E2
settlement of 30 June month .CE Zone - 25th of month .Army TTC) /
Outstanding Audit 30 Sep .CE Comd/ - 10th of 2'd Service HQ
Objns / LTARs 31 Dec month
ACE(L)
5.
Preliminary Report Yearly GE — 15 May .CWE - 01 Jun . .E-in-C's Br /
(PR) / 1st changes - CE Zone - 15 Jun .Service HQ.
in grants (for -.#-,, '
'' 4.`.CE Comd/ - 30 Jun (By 10 Jul)
current year) ACE(L)
6. PRE / 2nd changes Yearly GE — 30 June .CWE - 15 July .E-in-C's Br /
in grants for current - .CE Zone - 31 July Service HQ.
year .CE Comd/ - 16 Aug (By 31 Aug)
ACE(L) To be initiated
7. Forecast Estimates Yearly GE — 30 June .CWE - 15 July .E-in-C's Br / simultaneously
for next Fin year - .CE Zone - 31 July Service HQ.
.CE Comd/ - 16 Aug (By 31 Aug)
_____ _ _ ACE(L)
t; (J et) () 0 co ti oottic C 0 Q1 a) , ,
1
1. 2. 3. 4. 5. 6. 8.
7.
8. Revised Yearly GE — 01 Sep .CWE — 15 Sep .E-in-C's Br /
Estimates(RE)/3rd .CE Zone — 01 Oct Service HQ.
changes in grant - .CE Comd/ — 15 Oct (By 30 Oct)
for the current ACE(L)
Year To be initiated
9. Budget Estimates Yearly GE — 01 Sep .CWE — 15 Sep .E-in-C's Br/ simultaneously
for the next Fin ,i.
- ‘-'-- .CE Zone — 01 Oct Service HQ.
year -, .CE Comd/ — 15 Oct (By 30 Oct)
ACE(L)
10. Modified Yearly GE - 15 Dec .CWE — 01 Jan .E-in-C's Br/
Appropriation - .CE Zone — 10 Jan Service HQ.
(MA) .CE Comd/ — 20 Jan (By 05 Feb)
ACE(L)
11. MER 13th/ .March Yearly 31 Mar GE — 30 Apr .CWE — 10 May .E-in-C's Br/
Supplementary .CE Zone — 20 May Service HQ.
.CE Comd/ — 31 May (By 10 Jun)
ACE(L)
12. MER le/ March Yearly 31 Mar GE — 31 May .CWE — 10 Jun .E-in-C's Br/
correction .CE Zone — 20 Jun Service HQ.
• .CE Comd/ — 30 Jun (By 10 Jul)
ACE(L)
REVISED LIST OF REPORTS / RETURNS : E1A
(EFFECTIVE FROM - 01 APR 2006)
SI.
Title / Description of Report & Return
No Periodicity Indicating Initiation Intermediate
Position on Level and Final Level
Level and of Reportirt
Latest Date Latest Dates of
of Initiation Initiation
4. 5.
1.
Implementation of Move on Postings of
Quarterly
6.
0
JCOs / OR 31 Mar GE — 05st of
30 Jun . CWE - 10th CE Comd
next month of next month
30 Sep
31 Dec
. Zone - 20th
of next month
Initiation Intermediate
Level and Level and
Latest Date Latest dates
of Initiation of Initiation
5.
Quarterly 31 Mar GE— 1 of CWE — 5 of
30 Jun next month . Zone
(Changes to 30 Sep next month . Comd
to CWE
be intimated 31 Dec . E-in-C
by end of (E1B)
Non implementation of Out Standing Move eve month . Others*
Officers Quarterly 31 Mar CWE-10 • of
30 Jun next month
30 Sep
Strengthening of Administration,/ Premature 31 Dec
Retirement for Gp 'A' & 'B' Civ Officers under Quarterly 31 Mar GE-5 of
FR — 56 (J) 30 Jun next month
30 Sep
31 Dec
4. I Compassionate Ground Last Leg Posting for
Civilian Officers Half yearly 30 Jun
31 Dec . E-in-C
Report on Representation of SC/ST, OBC, (E1B)
Persons with Disability, Minority Community Yearly OWE-10' Jan
etc in Gp 'A' and 'B' of MES, . E-in-C
Res ective A ..c. on (E1B)
Monthly Status Report of Court Cases for
Officers End of GE — 30 of
(a) Running cases. month . E-in-C
each month
(b) Judgment delivered cases (highlighting [El — Legal
the potential CP cases) (Offrs)]
(c) Running CP cases
Annual Superannuation List of Offrs
Yearly 31 Mar CRO—
Apr
• • • • • •
4 1 • •
4. .0 4
OWE - 10 . Coma-30
31 Mar GE — 5" of
Quarterly - 20th . CRO
Outstanding Retirement Claims of Civ Of rs 30 Jun next month (Summary only)
f
(Indl details to be submitted only upto next of next month
30 Sep
higher Fmn) 31 Dec
31 Mar GE— 5 of
Centralisation of SBs of MES Civ Offrs (Direct 30 Jun next month
Recruitee and Promotee Offrs) 30 Sep
31 Dec
Quarterly 31 Mar
Final Settlement of GPF Claims of Retiring / 30 Jun
Death Cases of Offrs 30 Sep
31 Dec
• • • •
••• • • • • • • • •
' ‘,1
*
Final Level
Indiceng Initiation Intermediate
Periodicity
Title / Description of Report & Return Position on Level and Level and of
Latest ,I Latest Dates of Reporting
Date of 1 Initiation
Initiation
5.
th 05tthh
Monthly End of month GE — 30 \ . 'WE — 05
Status Report of Court Cases for Subordinate of month . Zone —10
. Comd —20th
Staff
of next month
(a) Running cases.
(b) Judgment delivered cases (highlighting
the potential CP cases)
(c) Running CP cases
REVISED LIST OF REPORTS I RETURNS : E1D (D&V)
End of Zonal CE :
10 Monthly Report on Disciplinary Cases of I Monthly month I Next month
l Retired Personals
4.
6 Progress on Quarterly 31 Mar GE — 10th of CWE — 20th of next a) CE Zone (E2 Pig) in
sanction of A/A for 30 Jun next month. month. respect of works to be
Para 11 & 12 30 Sep sanctioned by Area/Sub
works 31 Dec Area/Equivalent.
c) E-in-C's Branch,
E2 (Army) /(Air) /(Navy)
in respect of works to be
sanctioned by COAS / CNS /
CAS / GOI.
7 Progress on CR Quarterly 31 Mar GE — 10th of CWE — 20th of next Llp to CE Zone (E2W)
Part 'A' & Part 'B' 30 Jun next month month
30 Sep
31 Dec
8 Progress report on Quarterly 30 Apr GE — 10th of CWE — 20th of next . CE Comd / ACE(L)
ESH works. 31 Jul next month month . E-in-C's Branch
31 Oct (E2 Army/Air/Navy)
31 Jan C4 Zone (E2 W) — . Concerned staff HQ
30th of next month
9 Progress report on Quarterly 30 Apr GE — 10th of CWE — 20th of next . CE Comd / ACE(L)
Hospital & ECHS 31 Jul next month month . E-in-C's Branch
works 31 Oct (E2 Army/Air/Navy)
31 Jan CE Zone (E2 W) — . Concerned staff HQ
30th of next month
5. 6. 7. 8.
1. 2. 3. 4.
10 Progress report Quarterly 30 Apr GE — 10th of CWE — 20th of next month . ADG (OF & DRDO)
31 Jul next month (If applicable) . Concerned HQs
of R&D/ DGQA/
31 Oct CE (R & D) / CE (Fy)/CE . E-in-C's Br
Fy / DAD/Misc (E2 Army/Air/Navy)
works 31 Jan Zone (E2 W) - 30' of
next month
SI. Title / Description of Report & Return Periodicity Indicating Initiation Intermediate Final Level
No Position on Level and Level and of Reporting
Latest Date Latest Dates of
of Initiation Initiation
1. 2. 3. 4. 5. 6. 7.
1. Holding / Consumption of Cement Monthly End of month GE — 1st of CWE
next month
2. Progress Report on Loss Statements Quarterly 31 Mar GE — 05 Apr CWE - lath . CE Comd
30 Jun 05 Jul Zonal . E-in-C
30 Sep 05 Oct CE - 15th of (ESP)
31 Dec 05 Jan next month
6 7 8
2 3 4 5
1
CE Zone
CE Zone
3 4 5
1 2
t i I;
Annexure E2 (Pig)
3 4 5 6
1 2
sokl Apr 06
No. 95533/Pol/E2W (PPC)
„
Lists 'A' 81 ,B,
ESTABLISHMENT CHARGE
in AE's for
It is intimated that establishment charges are not to be catered
he lea that
MOD works, since the same is not allowed by MOD (Finance) on t p
establishment of MES is already being charged to concerned service.
(AK Jairath)
Brig
DDGW (PPC)
For E-in-C
Copy to:-
312/E2
his dispose ol your letter 200202/ADG/
ADGE OF & DRD01-_ T i
dated 22 Feb 06.
.10_44t, M I I 0--e-b-4
Tele : 23019694 Dy Dte Gen of Wks (PPC & Est)
Engr—in-Chief's Branch
Integrated HQ of MoD (Army)
Kashmir House
New Delhi — 110011
(Sanjay Sharma)
SE
Dir (Poi)
For E-in-C
Copy to:-
E-2 (Army)
E-2 (Air)
E-2 (N&DP) For comment & suggestion by 09th Aug 06.
E-4 (U)
E-8
1. It has been observed during the visit of E-IN-C to various buildings under construction
that while planning the toilet blocks adequate attention is not given to location of various
fixtures/fittings wrt proper circulation and visual barrier required to ensure privacy. The
commonly found deficiencies in toilet design arc as follows :-
01/ The wet area (bath, washing) and dry area (W1113/Urinals) are not \veil segregated
as a result of which the floor of toilet always remain wet and mishaps are likely to happen
due to skidding.
(d) The true dimensions according to contract drawings are not available due to faulty
plaster/dado work which does not allow adequate space and comfort.
(c) The floor trap/nahni trap are not provided at proper loc with respect to
slope/gradient of the floor.
(I) The plumbing of water supply pipe/vents/fixtures such as flushing sistern etc foul
with the ventilator.
(g) The ducts provided in multistoried buildings are inadequate in size and do not
allow desired ventilation and natural light. This causes smelling and unhygienic
conditions.
(h) Though the non-skid floor tiles to match with the dado/wall tiles arc available in
the market, the ceramic tiles of same specification as that of wall tiles arc provided whi::h
may result in skidding on the floor.
(i ) The toilet blocks are located at the entrance in foyer area or atrium. \\ hick
do 11:4
go with the ambience of the interior.
In view of the above it is pertinent to note that while preparing the toilet detail care must
he taken to avoid above deficiencies. It must be understood that the design of toilet is a matter of
detailing with due attention to functional requirements without compromising the comfOrt and
aspects of the user psychology.
In ordet to further improve the toilet plans the following suggestion arc made :-
(a) Anglo Indian type WC or Orissa Pan shall be provided to avoid sunken floor.
(b) 'he bath rooms in Ski barrack shall have thin PVC partitions instead of
,nventional eubicals, with a flap door as shown in the sketch.
(c) hrtead of water trough Ibr washing etc, stainless steel wash hand basins shall he
pr(vided a:. shown in the sketch.
(d) Inst.•ad of small size mirror over each WI-I13. one mirror with adequate length and
wia , shall be provided.
(e) The vovision for keeping shaving brush/shaving cream etc should he made by
provi( 1g a narrow glass plate or a niche.
Health, '
meet to be fixed on right side be provided in toilets of prestigious
building sand offices.
(g) Instead of
lroviding a separate room for Janitor Closet (K7) a small cupboard of
600 depth - ith PVC shutter is functionally sufficient where a broomstick, bucket
and cleanii4 liquid etc can be stored. The balance area can he merged to utilize
as circulatioil lace.
(11)
Adequate no. 0 'xhaust fans at suitable foe should be provided.
(i)
The plumbing of vater supply pipe should have duel water usage for solar water
heater system and nventional water supply system.
(j) The water supply pii s shall be concealed for aesthetic purpose.
(k) Guard bars are not re(1 , 'red to be provided.
(I)
The finished floor lent of toilet should be 10 mm sunk while bath and \VC
should he 20 mm sunk.
I IN • III III • • IIII 1111 • • • •
-0 URINAL
0
r- IN I—
CO >
o ff
7:3
.p
>< Z
—
0 ri c) M
ri 0 co
o r-
0
r— N• 0
m
-n
0 , CO Cf%
a m
0)
m ‘713 5 . . ^,
I-
0
1 c, , c, co
-13 -3
o
H O
0
70
=Z
cz.
c) c
10
M
X
(,) Z V---3-
cn 0
r- c>
c) 0 0
0)
C
03 z
o
co
c
•
z •
Cl
0
1iv13a 131101 1VOIdAl
L_ 1
L
c., .
Iv ro
c„, ... . „....
... ,
z z
x
V3?JV ON113M01.
L
HOIH IN CIZ NO11.1.thlVd OAd
1 I
11 I
e"-N ELL1
z
0
Cll Err
1111
rn
CO
Cfl
2z
1
m
mm
r—
>
M
DO
z
o
-n
Policy Letter No.13-1-2-(7)
Tele : 23019694 Dy Dte Gen of Wks (PPC&Est)
Engr-in-Chiefs Branch
Integrated HQ of MoD (Army)
Kashmir House
New Delhi - 110011
(Sanjay Sharma)
SE
Dir (Poi)
For E-in-C
Ends: As stated
Copy to:-
TS to DG (Pars)
SO to ADG (Per's).
Internal:-
RULING PERCENTAGE OVER SSR 2004 FOR PREPARATION OF AEs FOR QUARTER ENDING
APPLICABLE DURING QUARTER ENDING
Notes
1. Report will be issued by Zonal CEs. However wherein abnormal variation between same stations di various Zones occurs,
correction will be issued by CE Command within 15 days.
3. 1 0 % extra to be added for works in side factory areas/Ord/Amn depot/Air Force/Navy Tech Area/ Remote locations etc.
Percentage indicated above are assessed percentages based_on market trend and are not exclusi\ ely based on concluded
4.
contracts, excl freakishly high/low accepted contracts.
5. Difference in cost of stores will be shown separately under respective cols, only for stations wherever applicable.
Percentage indicated are for normal specifications including internal services as catered fo7 in Zork;ISpecifications. Any
6.
additional effect of superior specifications to be taken separately.
7 Percentage are for AEs purpose only and not for acceptance of contracts
r ;14, / Oaf OW mot airs maw maw ....
(
f. 4. 1 .1 1 11 1 ■
+.7 4.
. t) 4.) ‹,_, 4. .... ‘... s. 4. I Q. '
,_
6 Progress on Quarterly 31 Mar GE — 10'h of CWE — 20th of next a) CE Zone (E2 Plg) in
sanction of A/A for 30 Jun next month. month. respect of works to be
Para 11 & 12 30 Sep sanctioned by Area/Sub
works 31 Dec Area/Equivalent.
c) E-in-C's Branch,
E2 (Army) /(Air) /(Navy)
in respect of works to be
sanctioned by COAS / CNS /
CAS / GOI.
8 Progress report on Quarterly 30 Apr GE — 10th of CWE — 201h of next . CE Comd / ACE(L)
ESH works. 31 Jul next month month . E-in-C's Branch
31 Oct (E2 Army/Air/Navy)
31 Jan Zone (E2 W) — . Concerned staff HQ
30'h of next month
9 Progress report on Quarterly 30 Apr GE — 10'h of CWE — 20'h of next . CE Comd / ACE(L)
Hospital & ECHS 31 Jul next month month . E-in-C's Branch
works 31 Oct (E2 Army/Air/Navy)
31 Jan CE Zone (E2 W) — . Concerned staff HQ
301h of next month
.
, u. .
u. . 8.
1. 2. 3. 4.
10 Progress report Quarterly 30 Apr GE — 109' of CWE — 20th of next month . ADG (OF & DRDO)
of R&D/ DGQA/ 31 Jul next month (If applicable) . Concerned Has
Fy / DAD/Misc 31 Oct CE (R & D) / CE (Fy)/CE . E-in-C's Br
works 31 Jan Zone (E2 W) - 30'n of (E2 Army/Air/Navy)
next month
31 Mar GE — 10th of CWE — 20th of next month . CE Comd / ACE (L) As per
11 QPR Works Quarterly
next month (For all Power Wks) proforma
30 Jun
CE Zone — 30th of next . E-in-C's Br given vide
30 Sep
31 Dec month. (E2ArmyI Navy / Air) E-in-C's Br
(For Govt/ coAsi letter
CAS /CNS Power A/00032/E2
Wks) (Army)/TC dt
. 18 Oct 05
Conc-crne-' sten HO & Dec 05.
I 1 , I ; •
t) ti c,
t'
Annexure E2 P
AEs Remarks
Name of work Estimated Ceiling in Date BOO
SI No Ser of Stn amount / amount!
cost in Lakhs convening /
List finalization date date
Lakhs 10
7 8 9
4 5 6
2 3
T 1 RET RN
1:02.g1 I8c
REVISED LI T OF R
(Effective from 01 Apr 2006)
Remarks
Intermediate Level
Initiation and Latest dates of
Title/Description Level and
latest date of initiation
of report & return
initiation
Latest GE - 05 Feb
MES News Letter Half yearly 05 Aug
Format of report is
GE — 31 'lay CWE - 30 Jun complex and is
CE Zone - 31 Jul being simplified.
CE Comd - 31 Aug
GE — 30 Jun ME - 31 Jul
CE Zon - 31Aug
MES Org — Officer
Estt CE Coma 30 be
CE Corr.cd"A(;E(L)
CWE - '11 B 15 Jul
MES Org - Sub.Estt CE Zone -_i
REVISED LIST OF REPORTS /RETURNS : F3 SEC
(EFFECTIVE FROM - 01 APR 2006)
Progress Report on Loss Statements Quarterly 31 Mar C.,,:- 05 Apr CWE - 10th . CE Comd
2.
30 Jun ,' 7, Jul Zonal . E-in-C
30 Sep ...:5 0-3 Cdi: - 15th of (ESP)
31 Dec 05 Jan next mop .`.h
th AG's Branch
Quarterly CWE - 10
3. Progress Report on Rent & Allied Charges * Zonal
-do- -do-
th
CE - 15
CE Comd — 25th
of next month
4. Disposal of Salvage Stores and BER T&P & Quarterly -do- -do- CWE — 10th of Zonal CE
Vehicles next month
5. Disposal of Surplus Serviceable Stores / Half Yearly 30 Sep GE — 10 Oct CWE — 15 Oct Zonal CE
Plants (Other than Steel) 31 Mar 10 Apr & Apr
(
, • C.
• I
CE Comd / ACE(L),
30 Apr
Quarterly Report on 31 Jul E-in-C's Branch
Consultancy 31 Oct (E2 Design) By 20th
through Private I Jan of next month
Consultants &
Engg Colleges -do-
ADG (D&C) E.-In-C'S Branch
QPR for Quarterly 60 Apr of next
I 31 Jul (E2 Design)
Consultancy & By 23u! of next month
31 Oct
Rehabilitation
31 Jan
Works undertaken
b ADG D&C
GE —10`h c). CWE-20th of next.
Introduction of New next month month
Technology & Zone-30th of next
Products (B/R th
items in MES
Annexure E-2 (Resionl
5 6 7 8
1 2 3 4
CE Zone
5 6 7 8
1 2 3 4
CE Zone
6 7 8
4 5
REVISED LIST OF REPORTS / RETURNS : E1A
(EFFECTIVE FROM - 01 APR 2006)
SI. Title / Description of Report & Return Periodicity Indicating Initiation Intermediate
No Final Level
Position on Level and Level and of Reportin,
Latest Date Latest Dates of
1. of Initiation Initiation
2. -3. 4. 5. 6. 7.
1 Implementation of Move on Postings of Quarterly 31 Mar GE — 05 t of . CWE - 10th
JCOs / OR CE Comd
30 Jun next month of next month
3.') Sep
'1 Dec . Zone - 20th
of next month
2 Deputation — cum - Re-employment of JCOs / Half yearly 31 Mar GE.'St" of . CWE - 10th
OR in the Last Yr of Service in MES. E-in-C (E1A)
30 Sep next m,. 'th . Zone - 20th
. Comd - 30th
of next month
Periodicity
Pocition On Lavel and Lev.;": of
LeVE.N.I■ ant:
Datia Latest dates
In:tat-ion in"tiation
-
c.
— 303E) 31 •
••-
- C
•-• ; _ of . Zone
(Chances to 30 Sep
r.ext mcntil Ccmd
tC) 0.71IY
be intimated . E-ir-C
31 Dec
by end of (E1B)
I -
every month) . Others''
;t--ren--,entatlon of Cut Standino Move : Quarterly
Officer s 31 Mar • of . Zone - . E-in-C
30 Jun nex: month
• Comd - (EIS)
of next moriL-•
a - nf )1 Deo
••
Retirement f:r ,:;:c• 'A' & Civ Cff"•::ars unde :31 Mar . CWE -10"
FR — r I --7,3 - next 7onc.i - 90 m
30 Sep . Ccmd - 30th
! 31 Dec of rex rric.n:;-1
-•
%-7 r `.
30 JL
21 Dcc rex'. Tcnth
; ,CC . 31
Dcc z -••-• •, a fl
S .L Cc: Cse
1
1 rncn
— Leca:
Jcgme C:3es rct:t - c
c:er:;c C case; of 'ex: Tont
nrg CP c.,7-
innnual Superannuation Lis: of Off: v
' an
! 31 Mar I../ • •
Cc ncerne n
•
• . Comd-30"
4
4 4 4 •
GE — 5'" of . C - "..0 t CRO
4 4 4 4 4
Quarterly
31 Mar . :ore - 23' .(Summary only)
30 Jun \ next mon*.h
Outstanding Retirement Claims of Civ Offrs • of next month
B. (Indl details to be submitted only upto next 30 Sep
31 Dec CWE - 10 CR0
higher Fmn) GE— 5 of
Quarterly
31 Mar . Zone - 20thth
next month
iI Centralisation of SBs of MES Civ Offrs (Direct 30 Jun Comd - 30
9. 30 Sep of next month
Recruitee and Promotee Offrs) . E-in-C
31 Dec
MES GPF (E1B & E1C)
31 Mar
Quarterly Cell MRT — CE Comd
Claims of Retiring / 30 Jun
CD7F
Final beku_ ent of 30 Sep 5thof
Death Cases of c.)1,,_ next month
31 Dec
• !, ••
• • •
Monitoring of Recruitment of Minorities in Half yearly 31 Dec GE - 05th Jan . OWE - 10th E-in-C
7
Govt (15 points welfare of minorities) 30 Jun & ;JUI I . Zone - 20th (E1C-I)
Comd - 31st
31 Dec GE - 05th Jan OWE - 15th Jan CE Comd
8. Superannuation List of Non- Ind Pers Yearly Zone - 30th Jan
Retiring in the Year
31 Dec GE - 05th Jan . OWE- 15th Jan I CE Zone
9. Superannuation List of Ind- Pers Retiring in Yearly
the Year. • CWE - 10th Jan E-in-C
Yearly 31 Dec GE - 05Th Jan
10. I Representation of SC,ST,OBC, Ex- S/M, . Zone - 20th Jan (E1C I)
Sports Men, Women in Central Govt Comd - 31st Jan ,
• •
• • . ••••
• IT .1 • v• •
•
• • , a , • a •
• • • • •II. ' 411.
SI. Title / Description of Report & Return Periodicity Indicating Initiation Intermediate Final Level
No
Position on Level and Level and of
Latest Latest Dates of Reporting
Date of Initiation
1. Initiation
2. 3. 4. 5. 6. 7.
1. Status Report of Court Cases for Subordinate Monthly End of month GE — 30th . CWE — 05th E-in-C
Staff
(a) Running cases. of month . Zone — 10 th (E1C Legal)
(b) Judgment delivered cases (highlighting — . Comd —20th
of next month
the potential CP cases)
(c) Running CP cases
•
1 • •
•IM
•••
S
• • a .11
Appendix 'A'
REVISED LIST OF REPORTS/RETURNS : E4 Sec
(EFFECTIVE FROM 01 APR 2006)
SI No TitlelDescription Periodicity Indicating Initiation Level Intermediate Level and Final Level of
Position and Latest Date Latest Dates of Initiation Reporting
Till of Initiation
1. Annual Comparative Statement of Elect Yearly Mar GE - 30th Apr CWE - 15th May CE Zone
Supply of Previous Financial Yr
2. Annual Comparative Statement of Water Yearly Mar GE - 30m Apr CWE - 15th May CE Zone
Supply of Previous Financial Yr
3. Annual Return of Electric and Water Supply Yearly Mar GE - 15th May -- CWE
4. State of Agreements of Elect and Water Yearly Dec GE - 20th Jan CWE - 30''' Jan CE Zone
Supply with Civil Authorities
5. Blue Book : Data of E/M services, Plants and Yearly May GE - 15`b Jun CWE - 30th Jun CE Zone
Equipment
7. Census Return of MES Spl T &P Yearly : March GE - 20th Apr CWE - 30th Apr • CE Comd
CE Zone- 15th May
8. Status/Details of Water and Electric Supply to Yearly Jun GE - 15th Jul CWE - 301n Jul CE Zone
Pvt Consumers/Other Agencies *
7
_ aj w fro sow NEN MON NNW AKIN Mt /1111
J J J . 6 juiffrr= (177.
71 d d ot d U of 0/ til (1 071
9. Consumption and Expenditure of Electric & Half Yearly Mar/Sep GE-19 of 2 )-Th of
CWE -7: CE Zone
Water Supply next month next month CE Comd
10. Inspection of Electrical Installation by Half Yearly Jun/Dec GE - 10m of CWE - 20m CE Comd
Electrical Inspector next month of next
CE Zone -30 month
11. Inspection of Water , Sewage , DG Sets and Half Yearly Jun/Dec GE - 10" of CWE - 20m- of next month CE Zone
A/C Installations by IEM next month
Demand and Discard of 'B' Vehicles Half Yearly Mar/Sep GE -15m of — CWE .. 25m of E-in-C (ESP-4)
12.
next month next month
Status of Plants and Eqpts Declared BER Half Yearly Jul/Jan GE - 10m CWE 20In of next month CE Zone
14.
"next month --
but Awaiting Disposal *
15. Functioning of Chloronomes/ Chlorine Gas Quarterly Jun/Sep/ GE - 10Th of CWE - 20' of next month CE Zone
Cylinder Dec/Mar next month
16. Serviceability State of Sewage & Water T Quarterly -do- -do- -do- CE Zone
Plants, Pump Sets incl Fire Fighting, AC/Cold
Storage Plants, Lifts, Cranes and DG Sets
etc —
ji Run 'B' Vehicles -do-
Kl- SP-4)
17. -do- E-in-C(E
tro Mechanical
of Elec QMG
Status d .Intermediate
EnergyofMeters
Conversion
into Temper Proof Electronic GE I Concerne
18. Una within 03 MES
Latest Una 4"t"Cr-v0
Energy Meters * On days
occurance
\lel. Casualty Return
Notes
J 4J ) 4./ ‘t) IfiutivuOUUUOUUUUU (IUUUiJUi_10'
Annexure 'A'
7 8 9 10
1 2 3 4 5 6
Annexure 'B'
6 7 8
1 2 3 4 5
4J .1 ,) 4J tii) u(i 60006666 6666(4 000 1-1 6 6
Annexure 'C'
HALF YEARLY STATUS OF PLANT / EQPTS / VEHS DECLARED BER BUT AWAITING DISPOSAL
5 6 7 8
1 2 3 4
Annexure 'D'
(, ' Electric
Qty Action taken to
Ser Unit/Formation convert balance
Qty of Serviceable Meters Meters cs nverted
No Total Meters held
in to Electra: - Electric Meters in
Electronic Electrical Electronic Meters during the to Electronic
Electric
Meters Meters Qtr Mem.
1 2 3 4
REVISED LIST OF REPORTS/RETURNS (E-5 SECTION)
(Effective from 01 Apr 2006)
SI. Title/Description Periodicity Indicating Initiation Intermediate Level and Final level of Remarks
No of report & return Position on Level and Latest dates of initiation reporting
• latest date
of initiation
1. 2. 3. 4. 5. 6. 7. 8.
1 Abstract MER Monthly End of Jan, GE- 1s1 of .CWE - 3(`' of month .E-in-C's Br / Only for 3
(Signal/Fax MER) (wef Jan to Feb & Mar month .CE Zone - 51h of month Service HQ. months
Mar only) .CE Comd/ - 10'h of month .
ACE(L)
2. Main MER (Capital Monthly End of GE — 5th of .CWE - 10'h of month .Comd./ ACE(L)
& Maint works) month — month .CE Zone -15'h of month .E-in-C's Br /
(Separate for each Service HQ.
service)
3. Progress report on Quarterly 3151 Mar GE — 5'h of
.CWE - 15'h of month E-in-C's Br /
MFAI Cases 30 June month .CE Zone - 251h of month Service HQ.
30 Sep .CE Comd/ - 101h of 2"
31 Dec month
ACE(L)
4. Progress report on Quarterly 315' Mar GE — 5'h of .CWE - 151h of month .E-in-C's Br(E2
settlement of 30 June month .CE Zone - 251h of month .Army /TC) /
Outstanding Audit 30' Sep .CE Comd/ - 101h of 2' Service HQ
Objns / LTARs ' 31 Dec -- month • -
ACE(L) .
5. Preliminary Report Yearly GE — 15 May .CWE - 01 Jun .E-in-C's Br /
(PR) / 1st changes -,. - .CE Zone - 15 Jun .Service HQ.
in grants (for .CE Comd/ - 30 Jun (By 10 Jul)
current year) ACE(L)
6. PRE / 2"d changes Yearly GE — 30 June .CWE - 15 July .E-in-C's Br /
in grants for current - .CE Zone - 31 July Service HQ.
year .CE Comd/ - 16 Aug r(By 31 Aug)
ACE(L) I To be initiated
7. Forecast Estimates Yearly . GE — 30 June .CWE - 15 July .E-in-C's Br / , simultaneously
for next Fin year - .CE Zone - 31 July Service HQ.
.CE Comd/ - 16 Aug (By 31 Aug)
ACE(L)
V s L: I
4:,____,st____r____j;x.___.,. —Lep—',./9 —\419 8
1. 2. 3. 4. 5. 6. . 4,^N.°
8. Revised Yearly GE — 01 Sep .CWE — 15 Sep .E-in-C's Br /
Estimates(RE)/3rd .CE Zone — 01 Oct Service HQ.
changes in grant - .CE Comd/— 15 Oct (By 30 Oct)
for the current ACE(L)
Year To be initiated
9. Budget Estimates Yearly GE — 01 Sep .CWE — 15 Sep .E-in-C's Br/ - simultaneously
for the next Fin - .CE Zone — 01 Oct Service HQ.
year .CE Comd/ — 15 Oct (By 30 Oct)
ACE(L) .
10. Modified Yearly GE - 15 Dec .CWE — 01 Jan .E-in-C's Br/
Appropriation - .CE Zone — 10 Jan Service HQ.
(MA) .CE Comd/— 20 Jan (By 05 Feb)
ACE(L)
11. MER 13th/ .March Yearly 31 Mar GE — 30 Apr .CWE —10 May . ,E-in-C's Br/
Supplementary .CE Zone — 20 May Service HQ.
.CE Comd/_— 31 May ."By 10 Jun) •
ACE(L)
12. MER 14'h / March Yearly 31 Mar GE — 31 May .CWE —10 Jun ,E-in-C's Br/
correction .CE Zone — 20 Jun Service HQ.
• .CE Ccmd/ — 30 Jun (By 10 Jul)
ACE(L)
Note
REVISED LIST OF REPORTS/RETURNS (E-5 SECTION)
(Effective from 01 Apr 2006)
SI. Title/Description Periodicity Indicating Initiation Intermediate Level and Final level of Remarks
No of report & return Position on Level and Latest dates of initiation reporting
' latest date
of initiation
1. 2. 3. 4. 5. 6. 7. 8.
1 Abstract MER Monthly End of Jan, GE- 15t of .CWE - 3`d of month .E-in-C's Br / Only for 3
(Signal/Fax MER) (wef Jan to Feb & Mar month .CE Zone - 5th of month Service HQ. months
Mar only) .CE Comd/ - 10th of month .
ACE(L)
2. Main MER (Capital Monthly End of GE — 5th of .CWE = 10th of month .Comd./ ACE(L)
& Maint works) month — month .CE Zone -15th of month .E-in-C's Br /
(Separate for each Service HQ.
service)
3. Progress report on Quarterly 31' Mar GE — 5th of .CWE - 15th of month .E-in-C's Br /
MFAI Cases 30 June month .CE Zone - 25th of month Service HQ.
30 Sep .CE Comd/ - 10th of 2"d
31 Dec month
ACE(L)
4. Progress report on Quarterly 31st Mar GE — 5th of .CWE - 15th of month .E-in-C's Br(E2
settlement of 30 June month .CE Zone - 25th of month . .Army /IC) /
Outstanding Audit _ 30• Sep .CE Comd/ - 10th of 2nd Service HQ
Objns / LTARs 31 Dec — month
ACE(L) .
5. Preliminary Report Yearly GE — 15 May .CWE - Cl Jun .E-in-C's Br /
(PR) /1st changes .." - .CE Zone - 15 Jun .Service HQ.
in grants (for .CE Comd/ - 30 Jun (By 10 Jul)
current year) ACE(L)
6. PRE / 2"d changes Yearly GE — 30 June .CWE - 15 July .E-in-C's Br /
in grants for current - .CE Zone - 31 July Service HQ.
year .CE Comd/ - 16 Aug "(By 31 Aug)
ACE(L) To be initiated
7. Forecast Estimates Yearly . GE — 30 June .CWE - 15 July .E-in-C's Br / ,, simultaneously
for next Fin year - .CE Zone - 31 July Service HQ.
.CE Comd/ - 16 Aug (By 31 Aug)
ACE(L)
(..) UtilikAUU UlJUP V Le tl u k I l■ „v____.,
I Ma
L___.4., .,,. isA--..0-4,--V10 8. 4,—.0
1. 2. '4
3. 4. 5. 6.
8. Revised Yearly GE – 01 Sep .CWE – 15 Sep .E-in-C's Br /
Estimates(RE)/3rd .CE Zone – 01 Oct Service HQ.
changes in grant - .CE Comd/– 15 Oct (By 30 Oct)
for the current ACE(L)
Year . To be initiated
9. Budget Estimates Yearly GE – 01 Sep .CWE –15 Sep .E-in-C's Br/ - simultaneously
for the next Fin - .CE Zone – 01 Oct Service HQ.
year .CE Comd/ – 15 Oct (By 30 Oct)
ACE(L)
10. Modified Yearly GE - 15 Dec .CWE – 01 Jan .E-in-C's Br/
Appropriation - .CE Zone – 10 Jan Service HQ.
(MA) .CE Comd/ – 20 Jan (By 05 Feb)
ACE(L)
11. MER 1397 .March Yearly 31 Mar GE – 30 Apr .CWE – 10 May . .E-iii-C's Br/
Supplementary .CE Zone – 20 May Service HQ.
.CE ComdL– 31 May (By 10 Jun) •
ACE(L)
12. MER 14'h / March Yearly 31 Mar GE – 31 May .CWE – 10 Jun .E-in-C's Br/
correction .CE Zone – 20 Jun serviceHQ.
• .CE Comd/ – 30 Jun (By 10 Jul)
ACE(L)
Note
0 Lk-,
(Gk-We' Ile
Tele : 23019694 Dy Dte Gen of Works (PPC & Est)
Engineer—In-Chief's Branch
Integrated HQ of MoD (Army)
Kashmir House
New Delhi — 110011
(Sanjay Sharma)
SE
Dir (POL)
For E-In-C
Ends: As stated
Com/ to
ESP,
All Sub Wks Dte
Appendix
(Ref to para 2 letter No
37696/Gen/Pol/E2W (PPC) dt
08- Aug 06)
List 'A'113'
&
' v
(Sanjay Sharma)
SE
(POL)
For E-In-C
Encls :As above
Copy to
Internal
All Dtes
E-2 (Est)
E-2 (Army)
E-2 (AF)
E-2 (N&DP)
E-4 (Utility)
E-5 (Budget)
CA-I
CA-II
E-8 (Contracts)
E-2 (Design
A/89591/FP-1/1974 /2C06; )(GS-I)
Government of India
Ministry of Defence
New Delhi
dated 26 July 2006
To
Sir,
thereunder.
6. All purchaeas exceeding Rs five lakhs in value will be made on
the advice of the Tender Purchase Committee to be constitu by the
CFA and will include the IFA or his rep as a men or. The
cases it will be opt to the IFA to report the matter to the ney higher
5
IFA for pursuing :he matter further with the higher CFA or d'opping it
as deemed fit.
13. The financial powers contained in the Schedules are i.r respect
Yours faithfully,
-sd-
(T Rajeswari)
Director
SCHEDULE XVIII
2 :GOC-In-C 75 7 500 30
3 'Corps Commander 3
7 . 3.75 300 15
25 Lakhs
-
Merl., s
1. Prmers delegated to GOC-in-C also exercised by GOC-in-C ARTRAC
for 1-1Or‘!Esrs of AR Ti-r:AC, Shionla.
2. The financial powers vested in e6-a also be exercised by their locum lenens
wilen the incumbents are on leave.
3 In determining the CFA inn case ',here the pr_c_ij•!-.ci includes both authorised end
r-:pecial items of work the criterion shall not be the financial powers for the authorised
of v not k alone. In such a case, lith,ethre, if the estimated cost of the total of the
items of yr,:irk exceeds the financial powers of the CFA for those items the
approval shall be issued the CFA under vthose cowls the snecial
- i • --
ileitis of vrit k frill.
5. There will be no separate stage of re-ease after the issue of administrative approval.
;CFA will make initial allotment of funds to enable MES to commence planning/ execution
of works.
'6. The Works executed under Para 11 or the Defence Works Procethire,1936 will also b
slikaiiruc-ntly approved under CFA Po ...ers given above within a period of six months.
7. The works proposals be sanctione 1 oy CFAs mentioned above personally before Mm approvals
fi Spi)cial rkisponsation to RR Force C., is 10 execute Revenue Works in one Adm Approval unto Rs
110
9. Expenditure for RR Forces to be b:).,.,:ed to Major Head 2076, Minor Head 112 G.
Financial Powers for Sanction of E. uonditure under MH 2076 , Minor Head 111, Sub Head A Op Code
Ho'rrl 1L(5101
1. Irrimudiata and 1,10,,n1 repair and • .1 r.f Op works Eqpt finder those powers by EME Wksps out of MTA all .rtroit
or Op works allocation by Dependent :en will be sanctioned to EMS_ Functionaries in Sch XII.
i7. Normal Repair and Maint of Op Eqpt depending on exact requirement on case to case basis would be procust, I
for special
special allocation hy Frims out of C.r Works Fund and spent by EME Functionaries under Set) XII powers.
3. Annual Ivlaintainance Contract of 0", Works Eqpt depending upon requirement would be processed for special allocation and
spent by the Engineers.
TO BE HANDED OVER ON RELIEF
E-in-C's Branch
List 'A' &
2. However, it has been observed in the recent past that there are some MES fmns,
which are not maintaining Power Factor above 0.95 resulting in paying of penal tariffs to
the local SEBs. This lapse has been viewed seriously by MoD. In case any MES
formation receives an electricity bill that includes penalty for not maintaining
minimum requisite Power Factor as notified by concerned Electricity Board, the
electricity bill will be cleared only after concerned Command CE is informed by the
respective MES fmn. The matter will be further reported to E-in-C Branch
immediately (within 24 hrs).
4. - -
This has the approval of the E in C.
(RA Dub
CE
Jt Dir Gen Wks (U)
For E-in-C
POL LETTER NO 17/2006
Planning Stage
(b) Contractor should have executed at least two times the quantity of Pavement
Quality Concrete/Bitumonous concrete works as in current tender in last seven
years.
C2,
(c) Minimum annual turnover of the contractors/firms should be specified at pre
qualification stage.
(e) Firm should posses at least following plant in the books of the firm (not on
lease)
(i) Hot Mix Plant 60-90 TPH (if Bituminous works involved).
(f) Requirement of other Plant and Machinery like tippers, vibratory road rollers
etc required for the work should be listed in Pre qualification bid which the firm
should be able to muster if tender awarded.
(g) Firm should ensure at least three graduate engineers should be always
available on the work site whenever the work is in progress out of which one of
them should be Post Graduate in Pavement/Highways/Transportation Engg.
3. Pre qualification criteria should be got approved from it DG (Contracts) in the E-in-
Cs Branch.
5. It should be the endeavour to ensure that executives deployed for the airfield works
should have executed runway works before. Under no circumstances will work commence
unless above requirement is fulfilled. All executives (GEs/AGEs/)Es) executing the runway
construction/resurfacing works for the first time will visit at least one of the runway woriks
in progress and also SEM Wing, CME for training.
Mobilisation Stage
6. Before commencement of work, the Zonal CE will ensure that contractor has
employed qualified engineers and other technical manpower as also deployed specialized
equipment and T&P as per contract provisions. The condition and serviceability of the
same needs to be ensured.
8. All construction material (aggregate, cement, Bitumen etc) used in the work must
be from approved source and as per specifications in This issued by the E-in-C's Branch
from time to time.
9. Ideally, the quarry site which is the source of aggregate should be inspected
regularly during stacking/supply of meterils. However, in case of any doubt regarding the
contractor's motives, all aggregate must be checked by GE's rep at the gate of the
Aviation Base before allowing the vehicle inside. Preferably no materials should be
permitted to enter inside the work/plant site after sunset.
11. Design mix be obtained from IIT/approved lab/SEMT Wing, CME Pune based on
provided samples. Based on this mix, design samples will be prepared at site lab and
checked for their practical feasibility at site and most appropriate and practical design will
be approved by the GE. This activity should take place simultaneously during the
mobilization period after acceptance of contract. In case there is requirement of redesign
of design mix due to change of gradation of aggregates, change of type of binder or other
unforeseen reason, above procedure will be repeated.
Execution State
12. There is need to run a trial patch of each component of pavement before actual
execution. This will ensure serviceability of Plants & eqpt, set up drills for execution and
will project quality of materials.
13. Levels need to be transferred from benchmark properly and it should be ensured
that levels are checked every day before commencement and after days work is
completed. No cumulative errors should be permitted and cross checks be carried out at
regular intervals. Levels to the sensor paver should be ensured and total Stations Survey
Eqpt should be deployed continuously with paver to ensure profile of surfacing.
14. Paving Joints in bituminous surfaces remains a sore point and thus needs to be
eliminated. Following should be ensured :-
(a) Paver employed should be as wide as possible but no case less than 9.0m
wide.
(b) Edge of the previous run should be either heated with a blow torch
(sparingly) or a fine spray of hot bitumen be added just prior to next run.
15. Ensuring of Proper slope and profile of runway should be a Key Result Area
for the executives. The values should be maintained as per annexure 14 of ICAO to
facilitate quick flow of rainwater/snow.
16. Joint cutting in PQC must be done in time to avoid any kind of cracking. Care
should be taken as any premature cutting of joints will damage the edges of the PQS slabs
as also any delay in cutting will result in cracking of slabs. Hence, a site trial need to be
carried out to ascertain the optimum time for cutting of joints.
17. Joints in PQS must be thoroughly cleaned using compressed air and then covered
with perforated masking tape to prevent clogging of joints; specified sealants should be
filled earliest but not before drying of slabs.
18. Proper project site management must be ensured by having all construction
material dumped well away from the runway/taxi track and the area must be
segregated/screened to avoid any spilling over of aggregate on runway/taxi track.
19. Whenever, a contractor's vehicle has to cross the operational runway/taxi track a
temporary tarpaulin must be laid to prevent falling of loose particles on the surface.
Completion stage
20. CE Zones to ensure that load testing of newly laid surface is done using only
authorized/specified procedures and not by innovative adhoc measures such as skid turn
of helicopters/moving loaded vehicles in circles etc. In this regards, policy enunciated by
this HQ letter No 95610/Misc/E2 plg (Pay) dated 17 Jul 06 (copy enclosed).
(Sanjy Sharma)
SE
Dir (Pol)
For E-in-C
gopyts)
Internal
1. A detailed study has been carried out to use RMC (Ready Mixed Concrete) in RCC
works. It has been decided that as far as possible RMC must be used in all RCC works.
However, in works requiring small quantity of concrete, in-situ concrete may be allowed by
the Accepting Officer with the following requirements to be met.
E8, DG(MAP)
TO BE HANDED OVER ON RELIEF
REPORTING OF ACCIDENTS
1. Para 40 of MES Standing Orders lays down the procedure to report accidents to the
E-in-C's Branch. However of late it has been observed that instructions as laid down have
either been lost sight of or are not implemented in letter and sprit with the emphasis being on
not reporting untoward incidents to this HQ.
2. Since MES is a service provider such incidents invariably come to the knowledge of the
User and are then brought to the notice of this HQ through Staff Channels causing acute and
avoidable embarrassment.
3. In addition, there are instances when a CBI raid/trap is conducted or an amn depot
catches fire or there is a failure of civ works resulting in collapse of a roof; in such occasions
too, pro active action needs to be taken and information forwarded by the fastest available
means to the E-in-C's Branch.
4. The E-in-C has desired that first information received (FIR) can be sent by passing
established channels of command and hence gives the flexibility to a GE/AGE (I) to even ring
up the E-in-C/DGW/DG(Pers)/ADGE (Pers) to inform about the incident. In fact, it will be
acceptable in case this information is only partially correct and is later amended to provide full
details.
6. PI acknowledge.
(Sanjay Sharma)
SE
Dir Pol
For E-in-C
POLICY LETTER NO 20/2006
(iii) The procurement of computers & peripherals for MES fmns and units of
the Army, Navy & Air Force will continue to be done centrally by Addl Dte Gen
ESP/ESP-4 Section, E-in-C's Branch.
(b) Financial Year 2007-08 Onwards
(ii) The procurement of computers & peripherals for MES fmns and units of
the Army, Navy & Air Force will continue to be done centrally by Addl Dte Gen
ESP/ESP-4 Section, E-in-C's Branch.
(Sanjay Sharma)
SE
Dir Pol
For E-in-C
List 'A'113'
&
1. There had recently been a case of collapse of a slab under casting in one of the
stations. One of the reasons for the collapse probably would have been the use of wooden
props and formwork, which was not designed and erected properly. It has also been noticed
in past that timber formwork suffers from the following inadequacies :-
(a) The vertical props are weak and at times give way.
(c) The formwork of slabs, beams and column surfaces (soffits and sides) are very
rough and have been used number of times making the members weak. It also results
in poor finish.
2. In order to ensure safety of men, material and equipment and to have good quality
finishes, it has been decided that properly designed steel formwork (both verticals props and
surfaces) will only be used in all future works with immediate effect. In onaoing works, steel
formwork shall be used where length of props is more than 3.5 m or span is more than 4 m.
3. The price adjustment if any shall be as per instructions issued from E8 Section of this
Dffice.
°4-V./4\
(AK Jairath)
Brig
DDGW (PPC & Est)
For E-in-C
Copy to :-
Internal
E2W (Pol)
—Fax
Policy No. 02, 1A.171
ele 23018582 Jt Dir Gen of Works (Des)
23019518, 23019119 Military Engineer Services
Engineer-in-Chief's Branch
Integrated HQ of MoD (Army)
Kashmir House, Rajaji Marg,
New Delhi-110 011
A/90154/ \'S /E2 Des-3 Nov 2006
E-in-C List 'A' & 'B'
GUIDELINES FOR SPECIFICATION AND ACCEPTANCE
OF CEMENT SUPPLIED BY CONTRACTORS
1. Policy letter No 5(2) 97-D0-11/D(Works) dated 02 Jan 98 has been issued by the
Government of India, Min of Defence whereby cement has been made contractors
supply for MES works. Accordingly, the guidelines were issued vide our works Policy
No. 04/98 (Letter No A/90154/E2 Des-1 dated 09 Mar 98) to facilitate acceptance of
cement and to exercise quality control. Due to difficulty in availability of Ordinary
Portland Cement (OPC) from the manufacturers as intimated by Zonal Chief Engineers
and builders, it has now been decided to use Pozzolana Portland Cement (PPC) in
addition to OPC for the MES works. The guidelines for use of PPC and OPC for MES
works are as elucidated in subsequent paras. These shall be read in conjunction with
the provisions laid down in SSR Part-I, Section 4 (Para 4.3). The Guidelines shall be
suitably incorporated in the contracts for regulating the supply and use of cement in
works.
2. Types of Cement. The details of various types and grades of cement are
enumerated below :-
(a) Ordinary Portland cement. Grade 33 (IS:269-1989).
(b) Ordinary Portland cement. Grade 43 (IS : 8112-1989).
(c) Ordinary Portland cement. Grade 53 (IS : 12269-1987).
(d) Rapid Hardening Portland cement (IS : 8041-1990).
(e) Portland Pozzollana Cement (IS : 1489-1991).
(f) High Allumina Cement (IS : 6452- 1989).
(g) Sulphate Resisting Portland Cement (IS : 12230-1988).
3. The type of cement to be selected will depend upon the specific use in the work.
Since the price difference between 43 grade and 33 grade OPC is marginal, use of 43
grade OPC in normal structural work is recommended.
Cont...2
-2-
(b) Manufactures. The following are the main producers of OPC & PPC:-
(i) The Associated Cement Companies Ltd.
(ii) Grasim Industries Ltd
(iii) Ultra Tech Cement
(iv) The India Cement
(v) Dalmia Cement
(vi) Andhra Cement Ltd
(vii) Century Cements
(viii) Saurashtra Cement
(ix) Binani Cement
(x) Madras Cement
(xi) Mangalam Cement
(XII) Birla Corp Ltd
(xiii) Orient Cement
(xiv) Lafarge Cement
(xv) Shree Cement
(xvi) JK Lakshmi Cement
(xvii) Jaypee Rewa Cement
(xviii) Ambuja Cement Ltd
(xix) Star Cement Maghalaya (to be used in CE Shillong Zone
& CE (AF) Shillong area only)
In addition Only OPC manufactured by the following Manufacturers may
be used in CE Northern Command area only.
5. Use of PPC. While using PPC, the following requirements should be met :-
(a) PPC shall be allowed to be used in MES works only after ascertaining non
availability of OPC in their region by the accepting officer.
(b) The accepting officers are required to ensure that PPC meets the strength
criteria of 43 Grade OPC as laid down in IS 8112-1989_
(c) The minimum period before striking formwork given in clause 11.3.1 of
IS : 456-2000 is to be suitability modified at site by the Zonal CEs.
(d) In cold climate regions where temperature is lower than 15°C only OPC
shall be used.
(e) Mixing of OPC & PPC shall not be allowed in a work. However with the
strict control of the ground executives different buildings can have different types
of cement.
(f) While procuring PPC, the following requirements are to be ensured and
certificate to that effect is to be obtained for each batch from the manufacturer:-
(i) The quality of fly ash is strictly as per IS 1489 (Part I)-2002.
(ii) Flyash is inter-ground with clinker not mixed with clinker.
(iii) Dry fly ash is transported in closed containers and stored in silos.
Only pneumatic pumping should be used.
(iv) The fly ash is received from thermal power plants using high
temperature combustion above 1000°C should be used.
(g) Direction for price adjustment for use of PPC in place of OPC shall be
issued separately by E8 Section this HQ.
Cont...3
-3-
Testing/Storage/Documentation.
(b) Storage. Cement shall be stored over dry platform at least 20 cm high
in such a manner as to prevent deterioration due to moisture or intrusion of
foreign matters. In case of store rooms, the stack should be at least 20 cm away
from floors and walls. The stacking of Cement shall not be more than 10 bags
high. It shall be ensured that tested and untested cement are segregated and
stored separately with distinct identification.
Cont ...4
-4-
(c) The cost of test, samples etc. shall be governed as per condition (10 A) of
IAFW 2249.
(d) Schedule of supply shall be ensured and specified so as to match with the
progress contemplated in the CPM prepared for that project.
(e) Procedure for making payments for cement including accounting,
weighing, etc.
8. Zonal Chief Engineers will prepare the necessary specifications after taking into
consideration the aforesaid points and these are required to be approved from their
Chief Engineer Command before inclusion in the tenders at various levels.
9. This Policy has the approval of the E-in-C and supersedes all previous policy
letters on the subject.
K Jain )
/SE
Offg Jt DG(Des)
Copy to :- For E-in-C
internal -
E1/4241.etter1112,1AL 2006
DGW Secretariat
Tele : 23016708 Engineer-in-Chiefs Branch
Fax : 23018604 Integrated HQ of MoD (Army)
E Mail : Kashmir House, Rajaji Marg
New Delhi 110 011
29 Nov 06
No. 36323/E/M (MAP) E4(U1)
List 'A'
Instances have come to notice of this HQ where there has been some
1.
inadequacies in planning and execution of utility services at some MAP Stns.
This problem needs to be addressed appropriately to avoid its recurrence and
o fthis as stressed by the
inconvenience to the users. The importance letter No.
Engineer-in-Chief personally in para 2 (c) of E-in-C'
23266/GD/THU/D0/06 dated 29 June 06 addressed to all CE Comds.
Contd...2
-2-
3. The CE Comds must play a vital role towards the smooth planning 86
execution of the above aspects. If required, the Stn Cdrs must be appraised of
the serious consequences of such type of inadequate planning and execution of
MAP works without paying adequate attention towards augmentation of
existing utility services. Effort should be made to plan the utility services
simultaneously as integral part of the main project to be undertaken by MAP so
that chances of any delay in readiness of DU and its occupation is avoided.
Please acknowledge that the above orders have been passed on to all
4.
Zonal CEs in your Comd theatre.
23,-*
(Gai am Dutt)
Maj
DGW
A copy of QMG Br, AHQ ADG of LWE letter No 35105/79/Pol (Wks Proc) dt 07 Dec 06
alongwith revised Appx 'F is fwd herewith ' for your further necessary action. In this
connection please connect our letter No 37696/Gen/Pol/E2W(PPC) dt 12 Oct 2006 underwhich
copy of GOI, MoD letter No 35105/7/Pol(Wks Proc)/1135/DO-II(W-I) dt 09 Oct 06 was fwd to
your HQ and CE Zones vide E-mail dt 10 Oct 06.
(Sanjay Sharma)
SE
Dir (Pol)
For E-in-C
Ends : As above
CODV to
0,
Pk- is 1-16 163..LA'A 3/4\4,-)
Internal
Headquarters
\AI • Nr
3. Eastern Command only. your letter No.304000/DWP/Q3W
(P) dated 27 Nov 06.
( epak Singh)
Col
Dir Pol (Wks Proc)
For ADG LWE
Copy to:-
-in-C's Branch/DGW
DG MAP
AG's Branch/AWES, DGMS (Army)
Internal
Headquarters
1 (Wks Proc)/1135/D0-11 ID
A copy of Govt of India, MOD letter No. 35105/79/Po
1.
(W-1) dated 09 Oct 2006 is forwarded herewith for your information and record.
.------
rrWrivani)
fi
COI
Dir Pol (Wks Proc)
For ADG LWE
Copy to:-
E-in-C's Branch/DGW
DG MAP
AG's Branch/AWES, DGMS (Army),
Internal:
n, Oct 2006
To
The Chief of Army Staff •
The Chief of Naval Staff 0
The Chief of Air Staff
I am directed to convey the sanction of the President for revision of the existing
1.
"Scales of Furniture for Defence Services-1989' for married accommodation of the under
mentioned service Officers/JC0s/ORs and their equivalent ranks as per the scales
indicated in Appendices A to H to this letter:-
- Appendix - A
(a) The Chief of the Army Staff
The Chief of the Naval Staff
The Chief of the Air Staff
- Appendix - B
(b) The Vice Chiefs of the Army, Navy and Air Force
and PSOs of the rank of Lt Gens and their
equivalent ranks in the Air Force and Navy
- Appendix - C
(c) Lt Gene other than PSOs and their equivalent
ranks in Air Force and Navy
- Appendix -
(d) Maj Gens and their equivalent ranks in
Air Force and Navy
- Appendix — E
(e) Majs to Brigs and separated families
accommodation of Maj Gens and above and
their equivalent ranks in Air Force and Navy
- Appendix - F
(f) Gaols and below and separated families
accommodation upto Brigs and their equivalent
ranks in Air Force and Navy
- Appendix - G
(g) Married and separated families accommodation
of JCOs and their equivalent ranks in
Air Force and Navy
Appendix - H
(h) Married and separated families accommodation
of OR and their equivalent ranks in
Air Force and Navy
-2-
(DK Sharma) .
Desk Cfficer
Copy to:-
AG's Branch/Org 4(Civ (d)
Def (Fin) W-II, DFA (W), DFA (AG) QMG's Branch/Q3W (Policy)
D (N-III), D (Air-I1), D (Civ-I)
NHQ/Dte of Works
CGDA, New Delhi Air HQ/Dte of Works
DGADS, New Delhi
DADS, All Commands, CDA, All Commands,
CDA, Navy,CDA, Air Force CDA (0) Pune
Copy in ink to :-
/ALES OF FURNITURE FOR MARRIED ACCOMMODATION FOR THE CHIEF OF THE ARMY
STAFF, CHIEF OF THE NAVAL STAFF AND CHIEF OF THE AIR STAFF
„
11. Chair Verandah 8
„ 1
12. Chair Writing
13. CharpOy folding IP
11
1 With hard top
14. Display showcase built in 1 Shelves with glass sliding
shutters
„ 1
15. Hat stand with mirror
16. Ladder Aluminum
/I
1
17. Plate Rack
//
1
18. Rack Shoe Steel
11
2
19. Receptacle
• 11
1 PVC
20. Side board
1/
1
21. Sofa set 5 seater Cushioned Sets 2
22. Stool Dressin• Nos 3 With cushioned seat
23. Table Bed side
11
8
24. Table Centre (Size 4'x2')
11
2
25. Table Computer
11
1
26. Table Dining (8 Pers)
/1
1
„ 6 3+3 Dressing mirrors
27. Table Dressin• Ladies/dressing mirrors
II 4
28. Table Pe•
„ 1
29. Table 4'x3' for Printin•/Fax
30. Table Writing Size 4'x2' 6" " 1
„ 1
31. Tea.o
32. Teapoy Verandah
1/
2
33. Trolle for TV
/1
1 .
„ 2
34. Wooden shelves
- -------
•
Remarks
A/U f Quantity
Ser Description of item
Large - 1 (Half Hanging),
No
11
4
1. Almirah Steel Medium -1
Small - 2
3 PVC
Bath Stool It
1
Bed Hard Double Size 6'x6' 3") 4
3.
11
7. Cabinet Bathroom 1
'P
9. Chair Dinin
10. Chair Eas 1
11. Chair Writin
11
6
1 With hard to
12. Chair Verandah
11
4- 1 prfssIng mirror
2
Table Dinin
11
26.
4
Table Peg__ I/
28.
1
29.
Table Writin• Size 4'x2' 6" 1
30.
Tea o 2
31.
1
Trolle for TV 2
33.
34. Wooden Shelves
(Total items 34 only)
-
66"r
1:\gpS2112( C
2. Bath Stool 11
R arks
A/U Quantity
Description of item •
Ser Large -1 (Half hanging),
No • Nos 3
Medium — 1
1. Almirah Steel
Small - 1
I/ PVC
Bath Stool 1
Bed Hard Double Size 6' X 6' 3" 6
3.
Bed Hard Size 6" X 3' With Ironin • board._ _
4. 1
Bin Linen Multi •ur•ose 1 Glazed
Book shelf steel Built in
7. Cabinet Bath Room 1
Chair com•uter With cushioned seat.
8
9. Chair Dim. 2
10. Chair Eas 4
chair Verandah
11. •
11
With hard to
12. Chair Writing__ •
lass sliding shutters
•
13. Char 0 foldin
•IP Shelves with
14. Dm • la Showcase 1
15. Hat stand with mirror
16. Ladder Aluminum 11
1
17. Plate rack 1
18. Rack shoe steel 1 PVC
•
19. Rece tacle Nos 1
20. Side borciL Set' 1
Sofa set( 5 seater cushioned With cushioned seat.----
3
21.
/1
Tea o Verandah 1
31. 11
required
33 Wooden shelves
AC
AND SEPARATED FAMILIES UPTO COMMODATION FOR CAPT
BRIG AND EQUIVALENT AND BELOW
RANKS
IN
THE NAVY AND AIR FORCE
Description of item
A/U Quantity
Remarks
Bath stool
Bed hard 02
Book shelf 04
Bin linen multi ur • ose 01
Chair dining__ 01 With
6. Chair Verandah Ironing I3oard
06
Chair writinc
Chair corn•uter
Char• o IP Nylon newar
Hat and with mirror
Ladder Aluminum
Table Peg
Plate rack 04
Rece •tacle If
01
Rack shoe steel 01 PVC
Side board 01
Sofa set 4
II
seater cushionedi___ 01
1 Stool dressing_ Set 01
19 Table bed side Nos
--
01
20. Table Centre With cushioned seat
04
_21. 01
clining_(6 Pers)
22. Table dressing (Ladies/ 01
dreprror 02
1+1 dressing mirror
23. Table writing__
__
24. Table comp_uter _ _ 01
25. 01
26. )eapoy_Verandall 02
01
-G
II
01 With hardtop_ ____
Charpoy folding 11 „ 02
cnprpoy IP Nylon newar ., 02
Bed hard 02 ____
Pe• table ,, 02 Built in_____
Peg set of 6 01
Rack shoe steel
02
Table bed side 01
Table Centre
Table dining_(90 X 90 Cms_______ _ 01_
01
Table_(_90x60 Cm with drawers)
01
Dressingmirror 01
Table dressing Ladies
Almirah Steel for Capts Md Accn. Almirah Steel Medium (One No) has L.--?en
subsequently authorized for md accn of Capt and below vide QMG's Branch. Army 1-10
letter No 35105/79/Pol (Wks Proc) dt 07 Dec 2006.
3. TV Trolley for Capts Md Accn. Trolley for TV in md accn for Copts below
was disallowed on the grounds that they can not have same scale of furniture as that of
md accn for Majs and above since it has more plinth area.
4. Chair Verandah for JCOs McI Accn. 02 Nos chair verandah have bee;
authorized to JCO's md accn against 04 Nos authorized to OR md accn since JCOs
auth additional three Nos Chair Easy (with cushion).
5. Dining Table for JCOs Md Accn. Size of Dining Table in rud accn for JC(*..
is 90x.90 cm. After taking into consideration the total furniture auth and circulation spa,e(..
required, the size of table was considered adequate.
66[34 / by.
K., \\I Jo
1006 11:22 FAX 2005
CHIEF ENGINEER CEN COMM
Z001
-2-
(b) Matress for Hard Bed. Matress is not to be provided along with
bed. Matress was shown in Dig No FD/E6/MAP/108 for layout purpose only
(-Bharat Malik)
Col
Dir (E2VV/PPC)
for E-in-C
Copy to:-
Internal
List A 13
&
2. A large No. of married accommodation are being constructed under MAP Phase-1
with planning and execution by DG MAP. These married accommodations are provided
with superior specification in contrast to authorization as per Scale of Accn 1983.
Specially the number of 15 A Power point has been increased drastically and also electric
Geyser and Exhaust Fan have been provided in JCO's and OR's Married
Accommodations. Possibly the local MES auth are not aware whether adequate
measures were taken during pig stage to cater for the additional load and maintenance of
quality of electricity in terms of Power Factor and Voltage Drop etc.
3. MES is required to take over the M.d Accn on completion and maintain them
which includes payment of electricity tariff to State utilities Dept. Some of the completed
Md Accn have already been taken over from DU MAP and some serious problems have
been noticed after taking over of the accn from DG MAP which could be due to faulty
pig. As an example the case pertaining to GE Sulur under CF (AF) Bangalore arc
elaborated in the succeeding paras.
4. GE Sulur took over and accn completed by DG MAP in Sept 06 and these actin
were occupied during Oct 06. The problems faced by GE Sulur since then are as under:-
.../2
-3-
8. It has been directed by the DGW that 'NO' repeat `NO' accn will be taken over
by ME S if problems of similar nature as brought out in Para 4 above or any other
problems on account of faulty design and execution are noticed during the
handing/taking over proceedings.
9. You are also requested to confirm whether or not similar problems do exist in
your area for the and accn which have been taken over from DG MAP.
(RA Dubey)
Chief Engineer
Jt DGW (U)
For E-in-C
Copy to: -
Internal