Professional Documents
Culture Documents
Sched Log
Sched Log
Sched Log
EXE
=========================================================
Default Project..................................................WTCFL.UP9
TIA R0
Projects:
WTCFL.UP9 TIA R0.................................................WTC
BPS Flood Protection - Program Update #9 as of 11/01/2021
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar
Advanced
--------
Calculate multiple float paths...................................No
Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................243
# Not Started....................................................121
# In Progress....................................................21
# Completed......................................................101
# Relationships..................................................319
# Activities with Constraint.....................................17
Project: WTCFL.UP9 TIA R0 Activity: A1000 Start Suspension
Project: WTCFL.UP9 TIA R0 Activity: A1010 Contract Suspension
Project: WTCFL.UP9 TIA R0 Activity: A1020 End Suspension
Project: WTCFL.UP9 TIA R0 Activity: A1030 Resumption of Contract
Work
Project: WTCFL.UP9 TIA R0 Activity: CON-1560 Instal BPS Post -
Ph 1B Sec 1 - Washington Place
Project: WTCFL.UP9 TIA R0 Activity: FWN-1000 Phase 2W NTP
Project: WTCFL.UP9 TIA R0 Activity: FWN-1010 Phase 1B (A)
Section 2 NTP - Fulton Street and Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: FWN-1020 Phase 3B NTP -
Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: FWN-1030 Phase 1W NTP -
Stair N
Project: WTCFL.UP9 TIA R0 Activity: FWN-1040 Phase 4B NTP -
Greenwich Street
Project: WTCFL.UP9 TIA R0 Activity: FWN-1050 Phase 1B Section 1
NTP - Washington Place
Project: WTCFL.UP9 TIA R0 Activity: MIL-1070 Final Completion
Project: WTCFL.UP9 TIA R0 Activity: PACC-003-324 PACC-003R1
NTP
Project: WTCFL.UP9 TIA R0 Activity: PACC-003-385 PACC-003R1
NTP
Project: WTCFL.UP9 TIA R0 Activity: PACC-007-445 PACC-007 NTP
Project: WTCFL.UP9 TIA R0 Activity: PAFI-001-120 Procure
Chassis for BPS Storage Containers
Project: WTCFL.UP9 TIA R0 Activity: PAFI-002-195 Prepare &
Submit S/D
Errors:
-------
Warnings:
---------
Activities without predecessors..................................39
Project: WTCFL.UP9 TIA R0 Activity: A1030 Resumption of Contract
Work
Project: WTCFL.UP9 TIA R0 Activity: APP-1410 Review and Approve
Perimeter Flood Barrier - Revision 1
Project: WTCFL.UP9 TIA R0 Activity: APP-1440 Review and Approve
Window Barrier Type 0 - Security Guard Booth /Greenwich ST- Revision #1
Project: WTCFL.UP9 TIA R0 Activity: CON-1550 NYSDOT Permit -
Liberty & West ST
Project: WTCFL.UP9 TIA R0 Activity: EXT-1000 Performing Art
Center Construction
Project: WTCFL.UP9 TIA R0 Activity: FWN-1050 Phase 1B Section 1
NTP - Washington Place
Project: WTCFL.UP9 TIA R0 Activity: MIL-1000 NTP
Project: WTCFL.UP9 TIA R0 Activity: PACC-003-324 PACC-003R1
NTP
Project: WTCFL.UP9 TIA R0 Activity: PACC-003-385 PACC-003R1
NTP
Project: WTCFL.UP9 TIA R0 Activity: PACC-005-275 Field
Measure
Project: WTCFL.UP9 TIA R0 Activity: PACC-007-445 PACC-007 NTP
Project: WTCFL.UP9 TIA R0 Activity: PAFI-001-120 Procure
Chassis for BPS Storage Containers
Project: WTCFL.UP9 TIA R0 Activity: PAFI-002-185 Field
Measure
Project: WTCFL.UP9 TIA R0 Activity: PRE-1060 Field Survey -
Phase 1B Section 1 Washington Place
Project: WTCFL.UP9 TIA R0 Activity: SUB-1050 Prepare and Submit
Designated Debris Material
Project: WTCFL.UP9 TIA R0 Activity: SUB-1080 Coordination of
WTC 964.946 barriers with PAC & WBVA - Type B
Project: WTCFL.UP9 TIA R0 Activity: SUB-1140 Coordination of
WTC 964.946 barriers with PAC & - Type L
Project: WTCFL.UP9 TIA R0 Activity: SUB-1160 Coordination of
WTC 964.946 barriers with PAC & WBVA - Type L.1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1180 Coordination of
WTC 964.946 barriers with PAC & WBVA - Type O
Project: WTCFL.UP9 TIA R0 Activity: SUB-1430 Coordination of
WTC 964.946 barriers with PAC & - Type N
Project: WTCFL.UP9 TIA R0 Activity: SUB-1440 Prepare and Submit
Submittals Schedule - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1460 Prepare and Submit
CPM Schedule - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1490 Prepare and Submit
Schedule of Values - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1520 Prepare and Submit
Certificate of Insurance - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1530 Prepare and Submit
QA/QC Plan - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1550 Prepare and Submit
Subcontractor & Material List - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1560 Prepare and Submit
Designated Debris Material - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1561 Prepare and Submit
Subcontractor & Material List - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1590 Prepare and Submit
Perimeter Flood Barrier - Revision 2
Project: WTCFL.UP9 TIA R0 Activity: SUB-1600 Prepare and Submit
BPS Shop Drawings & Calculatios - Phase 1B Section 1 Washington Place
Project: WTCFL.UP9 TIA R0 Activity: SUB-1610 Prepare and Submit
Window Barrier Type 0 - Security Guard Booth /Greenwich ST- Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1620 Prepare and Submit
Stairwell Barrier Type N Shop Drawings and Calculations - Stair N - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1630 Prepare and Submit
Stairwell Barrier Type N Samples - Stair N - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1640 Prepare and Submit
Vehicle Opening Barrier Type B - Vehicle Access /Vesey ST - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1650 Prepare and Submit
Double Door Barrier Type L Shop drawings and Calculations - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1660 Prepare and Submit
Double Door Barrier Type L Samples - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1670 Prepare and Submit
Single Door Barrier Type L.1 - West Pedestrain Opening /Vesey ST - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1680 Prepare and Submit
Single Door Barrier Type L.1 - West Pedestrain Opening /Vesey ST - Revision #2
Project: WTCFL.UP9 TIA R0 Activity: SUM-1390 Start of Phase 1B
Sec 1 - Washington Pl
Out-of-sequence activities.......................................7
Project: WTCFL.UP9 TIA R0 Activity: APP-1150 Review and Approve
Vehicle Opening Barrier Type B - Vehicle Access /Vesey ST
Project: WTCFL.UP9 TIA R0 Activity: APP-1170 Review and Approve
Stairwell Barrier Type N Shop Drawings and Calculations - Stair N
Project: WTCFL.UP9 TIA R0 Activity: APP-1190 Review and Approve
Double Door Barrier Type L Shop Drawings and Calculations
Project: WTCFL.UP9 TIA R0 Activity: APP-1370 Review and Approve
Subcontractor & Material List - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: APP-1430 Review and Approve
BPS - Phase 1B Section 1 Washington Place
Project: WTCFL.UP9 TIA R0 Activity: APP-1460 Review and Approve
Stairwell Barrier Type N Shop Drawings and Calculations - Stair N - Revision #1
Project: WTCFL.UP9 TIA R0 Activity: SUB-1120 Prepare and Submit
BPS Shop Drawings & Calculations - Phase 4B Greenwich Street
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................243
# Relationships with other projects..............................0
Data Date........................................................01-Nov-21
Earliest Early Start Date........................................01-Nov-21
Latest Early Finish Date.........................................25-Dec-22
Exceptions:
-----------
Critical Activities..............................................38
Project: WTCFL.UP9 TIA R0 Activity: APP-1130 Review and Approve
BPS - Phase 1B Fulton Street & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: APP-1180 Review and Approve
BPS - Phase 3B Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: APP-1200 Review and Approve
Stairwell Barrier Type N Samples - Stair N
Project: WTCFL.UP9 TIA R0 Activity: CLO-1010 Substantial
Completion
Project: WTCFL.UP9 TIA R0 Activity: CLO-1020 Punchlist
Project: WTCFL.UP9 TIA R0 Activity: CLO-1030 Final Inspection
Project: WTCFL.UP9 TIA R0 Activity: CLO-1040 Demobilization &
Site Recovery
Project: WTCFL.UP9 TIA R0 Activity: CLO-1050 O&M Manuals
Submission
Project: WTCFL.UP9 TIA R0 Activity: CON-1150 Mobilization and
Partial Removals - Fulton ST & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: CON-1170 Install Traffic
control and Channelizing Devices - Fulton ST & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: CON-1190 Install BPS Post
and Bollard Connection - Fulton ST & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: CON-1200 Install and
Inspect BPS Floodwall - Fulton ST & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: CON-1220 Remove BPS and
Send for Storage - Fulton ST & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: CON-1300 Mobilization and
Partial Removals - Vessey ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1320 Install Traffic
control and Channelizing Devices - Vessey ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1340 Install BPS Post
and Bollard Connection - Vessey ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1350 Install and
Inspect BPS Floodwall and Bracing - Vessey ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1380 Remove BPS and
Send for Storage - Vessey ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1420 Mobilization and
Partial Removals - Greenwich ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1450 Install Traffic
control and Channelizing Devices - Greenwich ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1460 Install BPS Post
and Bollard Connection - Greenwich ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1470 Install and
Inspect BPS Floodwall and Bracing - Greenwich ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1490 Remove BPS and
Send for Storage - Greenwich ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1520 Clean-up - Fulton
ST & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: CON-1530 Clean-up - Vessey
ST
Project: WTCFL.UP9 TIA R0 Activity: CON-1540 Clean-up -
Greenwich ST
Project: WTCFL.UP9 TIA R0 Activity: FWN-1010 Phase 1B (A)
Section 2 NTP - Fulton Street and Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: FWN-1020 Phase 3B NTP -
Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: MIL-1070 Final Completion
Project: WTCFL.UP9 TIA R0 Activity: PRE-1010 Field Survey -
Phase 1B (A) Section 2 - Fulton St & Vesey St
Project: WTCFL.UP9 TIA R0 Activity: PRE-1030 Field Survey -
Phase 3B Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: PRO-1030 Fabricate and
Deliver BPS - Phase 1B Fulton Street & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: PRO-1080 Fabricate and
Deliver BPS - Phase 3B Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: PRO-1090 Fabricate and
Deliver Stairwell Barrier Type N - Stair N
Project: WTCFL.UP9 TIA R0 Activity: PRO-1100 Fabricate and
Deliver BPS - Phase 4B Greenwich Street
Project: WTCFL.UP9 TIA R0 Activity: SUB-1030 Prepare and Submit
BPS Shop Drawings & Calculatios - Phase 1B Fulton Street & Greenwich
Project: WTCFL.UP9 TIA R0 Activity: SUB-1090 Prepare and Submit
BPS Shop Drawings & Calculations - Phase 3B Vesey Street
Project: WTCFL.UP9 TIA R0 Activity: SUB-1380 Prepare and Submit
Stairwell Barrier Type N Samples - Stair N