Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ICB PACKAGE LSS-08

SECONDARY CANALS AND DRAINS RENTANG IRRIGATION MODERNIZATION PROJECT

BOREHOLE LOG Hole No.: BLT 1A


Project RIMP ICB Package LSS 08 Depth -25m Drilling Rig Toho
Site Lamaran Tarung Coordinate X: 199466.901 Y: 9296992.076 Inclination 0° Drilled by Pebi
Elevation 2.882m Date 26/09/2021 - 27/09/2021 GWL Logged by Galang
N-SPT Core Recovery (%) RQD (%)

Core Barrel ø
Permeability
SCR TCR

G. Symbol
Formation
Depth (m)

Elevation

Description Sample No.

Casing ø
Column
Section

Symbol
Sample
0 50 0 100 0 100 0 100

Value

Value

Value

Value
GWL
Date

0
(0 - 2m); Top soil; dark brown; residual soil;
clay; medium plasticity; soft; moist.
58 100
2.88m

1 OL/OH
2 73 100

86 91
2
(2 - 4.5m); Clay; medium creamy gray; 3 56 100
fresh; clay; high plasticity; soft; moist.

100 96
3
UDS/BLT
100 100 CL
1A/1

67 100
4
100 96

(4.5 - 8.55m); Clayey sand; medium gray;


13 62 100
fresh; clay, fine to medium grain; well
5 graded; non-plastic; medium dense; moist;
comp.: biotite, hornblende, quartz; weak 95 100
cementation.
17 73 100
6
73 100
SC
3 67 100
7
100 100

4 60 100
8
100 100

(8.55 - 12m); Clay; medium whitish gray; 1 67 100


9 fresh; clay; high plasticity; very soft; moist.

100 100

2 67 100
10
100 100 CL

2 67 100
11
100 96

2 67 100
12
(12 - 16m); Clay; medium gray; fresh; clay;
100 100
high plasticity; soft; moist.

2 60 100
13
100 96

2 64 100
14 CL
100 100

2 64 100
15
100 100

3 78 100
16
(16 - 19m); Clay; medium whitish gray;
100 100
fresh; clay; high plasticity; soft; moist.

3 67 100
17
100 100
CL
4 71 100
18
100 100

5 62 100
19
(19 - 21.25m); Clay; dark blackish gray;
100 100
fresh; clay; high plasticity; medium soft;
moist.
5 60 100
20
CL
100 100

Information:
SPT : Standard Penetration Test : SPT Sample VENDOR KONSULTAN KONTRAKTOR
STCB : Single Tube Core Barrel
DTCB : Double Tube Core Barrel : DS Sample
UDS : Undisturb Sample
DS : Disturb Sample : UDS Sample
ICB PACKAGE LSS-08
SECONDARY CANALS AND DRAINS RENTANG IRRIGATION MODERNIZATION PROJECT

BOREHOLE LOG Hole No.: BLT 1A


Project RIMP ICB Package LSS 08 Depth -25m Drilling Rig Toho
Site Lamaran Tarung Coordinate X: 199466.901 Y: 9296992.076 Inclination 0° Drilled by Pebi
Elevation 2.882m Date 26/09/2021 - 27/09/2021 GWL Logged by Galang
N-SPT Core Recovery (%) RQD (%)

Core Barrel ø
Permeability
SCR TCR

G. Symbol
Formation
Depth (m)

Elevation

Description Sample No.

Casing ø
Column
Section

Symbol
Sample
0 50 0 100 0 100 0 100

Value

Value

Value

Value
GWL
Date

6 67 100
21
91 100
(21.25 - 25m); Clay; medium creamy gray;
fresh; clay; medium plasticity; very stiff;
moist. 13 62 100
22
100 91

19 62 100
23
CH
100 91

21 60 100
24
100 95
-21.62m
22 67 100
25

Information:
SPT : Standard Penetration Test : SPT Sample VENDOR KONSULTAN KONTRAKTOR
STCB : Single Tube Core Barrel
DTCB : Double Tube Core Barrel : DS Sample
UDS : Undisturb Sample
DS : Disturb Sample : UDS Sample

You might also like