Pile Cap Design US Code (ACI 318-11) - Metric
Pile Cap Design US Code (ACI 318-11) - Metric
PILE ARRANGEMENT
Footing Geometrical Data
Column Dimensions
Column Shape : Rectangular
Pedestal
Include Pedestal : No
Pedestal Shape : N/A
Pile Capacities
Axial Capacity PP : 600.000 kN
Lateral Capacity PL : 100.000 kN
Uplift Capacity PU : 300.000 kN
Material Properties
Concrete f'c : 28000.005 kN/m^2
Reinforcement fy : 414000.070 kN/m^2
Concrete Cover
Bottom Clear Cover CCB : 0.075 m
Side Clear Cover CCS : 0.075 m
Pile in Pile Cap PCP : 0.050 m
For the loads shown in this table, the sign convention is the same as that for JOINT LOADS in STAAD.Pro when global Y is the vertical
axis.
Load Self
Load Case
Combination Load Combination Title Weight
Multiplier
Number Factor
54 GENERATED NSCP 2015 DRIFT CHECK COMBO 1 1.00 1.00
55 GENERATED NSCP 2015 DRIFT CHECK COMBO 2 1.00 1.00
56 GENERATED NSCP 2015 DRIFT CHECK COMBO 3 1.00 1.00
57 GENERATED NSCP 2015 DRIFT CHECK COMBO 4 1.00 1.00
file:///D:/CJNA/FINAL%20OUTPUTS/Construction%20of%20Barracks,%20NSJA/STA... 21/04/2021
Pile Cap Design Page 2 of 6
Load Self
Load Case
Combination Load Combination Title Weight
Multiplier
Number Factor
15 GENERATED NSCP 2015 USD/LRFD + EV 1 1.00 1.00
16 GENERATED NSCP 2015 USD/LRFD + EV 2 1.00 1.00
17 GENERATED NSCP 2015 USD/LRFD + EV 3 1.00 1.00
18 GENERATED NSCP 2015 USD/LRFD + EV 4 1.00 1.00
19 GENERATED NSCP 2015 USD/LRFD + EV 5 1.00 1.00
20 GENERATED NSCP 2015 USD/LRFD + EV 6 1.00 1.00
21 GENERATED NSCP 2015 USD/LRFD + EV 7 1.00 1.00
22 GENERATED NSCP 2015 USD/LRFD + EV 8 1.00 1.00
23 GENERATED NSCP 2015 USD/LRFD + EV 9 1.00 1.00
24 GENERATED NSCP 2015 USD/LRFD + EV 10 1.00 1.00
25 GENERATED NSCP 2015 USD/LRFD + EV 11 1.00 1.00
26 GENERATED NSCP 2015 USD/LRFD + EV 12 1.00 1.00
27 GENERATED NSCP 2015 USD/LRFD + EV 13 1.00 1.00
28 GENERATED NSCP 2015 USD/LRFD + EV 14 1.00 1.00
29 GENERATED NSCP 2015 USD/LRFD + EV 15 1.00 1.00
30 GENERATED NSCP 2015 USD/LRFD + EV 16 1.00 1.00
31 GENERATED NSCP 2015 USD/LRFD + EV 17 1.00 1.00
32 GENERATED NSCP 2015 USD/LRFD + EV 18 1.00 1.00
33 GENERATED NSCP 2015 USD/LRFD + EV 19 1.00 1.00
34 GENERATED NSCP 2015 USD/LRFD + EV 20 1.00 1.00
35 GENERATED NSCP 2015 USD/LRFD + EV 21 1.00 1.00
36 GENERATED NSCP 2015 USD/LRFD + EV 22 1.00 1.00
37 GENERATED NSCP 2015 USD/LRFD + EV 23 1.00 1.00
38 GENERATED NSCP 2015 USD/LRFD + EV 24 1.00 1.00
39 GENERATED NSCP 2015 USD/LRFD + EV 25 1.00 1.00
40 GENERATED NSCP 2015 USD/LRFD + EV 26 1.00 1.00
41 GENERATED NSCP 2015 USD/LRFD + EV 27 1.00 1.00
42 GENERATED NSCP 2015 USD/LRFD + EV 28 1.00 1.00
43 GENERATED NSCP 2015 USD/LRFD + EV 29 1.00 1.00
44 GENERATED NSCP 2015 USD/LRFD + EV 30 1.00 1.00
45 GENERATED NSCP 2015 USD/LRFD + EV 31 1.00 1.00
46 GENERATED NSCP 2015 USD/LRFD + EV 32 1.00 1.00
47 GENERATED NSCP 2015 USD/LRFD + EV 33 1.00 1.00
48 GENERATED NSCP 2015 USD/LRFD + EV 34 1.00 1.00
49 GENERATED NSCP 2015 USD/LRFD + EV 35 1.00 1.00
50 GENERATED NSCP 2015 USD/LRFD + EV 36 1.00 1.00
51 GENERATED NSCP 2015 USD/LRFD + EV 37 1.00 1.00
file:///D:/CJNA/FINAL%20OUTPUTS/Construction%20of%20Barracks,%20NSJA/STA... 21/04/2021
Pile Cap Design Page 3 of 6
Fy
(kN)
Load Fx Fz Mx Mz
Downwards is
Case (kN) (kN) (kNm) (kNm)
negative Upwards
is positive
15 -23.808 -431.426 -41.530 -12.553 1.176
16 -21.371 -407.444 -40.661 -18.132 8.383
17 -20.708 -381.559 -37.180 -13.064 3.313
18 -17.209 -363.968 -35.191 -9.635 -9.329
19 -23.251 -375.565 -36.013 -11.896 10.625
20 -20.412 -349.802 -17.266 38.657 1.045
21 -20.409 -389.118 -52.946 -58.260 1.002
22 -14.314 -369.908 -36.366 -10.814 -17.362
23 -26.397 -393.103 -38.011 -15.335 22.546
24 -20.719 -341.575 -0.516 85.770 3.386
25 -20.713 -420.208 -71.877 -108.063 3.300
26 -8.911 -265.694 -25.884 -5.820 -19.918
27 -20.994 -288.889 -27.530 -10.342 19.990
28 -15.316 -237.361 9.966 90.764 0.829
29 -15.310 -315.994 -61.395 -103.069 0.744
30 4.040 -444.711 -45.634 -0.345 -124.367
31 5.244 -448.888 -51.386 -17.774 -128.926
32 -63.495 -619.310 -52.341 -17.230 136.383
33 -62.291 -623.487 -58.094 -34.660 131.824
34 -31.177 -447.536 11.587 175.394 11.496
35 -27.192 -461.872 -7.568 117.290 -3.659
36 -31.059 -606.326 -96.159 -152.295 11.116
37 -27.074 -620.662 -115.314 -210.399 -4.040
38 9.443 -340.497 -35.152 4.649 -126.924
39 10.647 -344.674 -40.905 -12.781 -131.482
40 -58.092 -515.096 -41.860 -12.237 133.826
41 -56.888 -519.273 -47.612 -29.666 129.268
42 -25.774 -343.322 22.068 180.388 8.940
43 -21.789 -357.658 2.913 122.284 -6.216
44 -25.656 -502.112 -85.678 -147.301 8.560
45 -21.671 -516.448 -104.833 -205.405 -6.596
46 26.278 -35.417 -5.784 13.526 -127.756
47 27.482 -39.595 -11.537 -3.904 -132.314
48 -41.257 -210.016 -12.492 -3.360 132.995
49 -40.052 -214.193 -18.244 -20.789 128.436
50 -8.939 -38.243 51.436 189.265 8.108
51 -4.954 -52.578 32.281 131.161 -7.048
52 -8.820 -197.032 -56.310 -138.424 7.728
53 -4.835 -211.368 -75.465 -196.528 -7.428
54 -17.209 -363.968 -35.191 -9.635 -9.329
55 -23.251 -375.565 -36.013 -11.896 10.625
56 -20.412 -349.802 -17.266 38.657 1.045
57 -20.409 -389.118 -52.946 -58.260 1.002
58 -14.314 -369.908 -36.366 -10.814 -17.362
59 -26.397 -393.103 -38.011 -15.335 22.546
60 -20.719 -341.575 -0.516 85.770 3.386
61 -20.713 -420.208 -71.877 -108.063 3.300
62 12.457 -292.171 -30.950 4.094 -124.783
63 13.662 -296.349 -36.702 -13.336 -129.342
64 -55.077 -466.770 -37.657 -12.792 135.967
65 -53.873 -470.947 -43.410 -30.221 131.409
66 -22.760 -294.997 26.271 179.832 11.081
67 -18.775 -309.332 7.116 121.729 -4.075
68 -22.641 -453.786 -81.475 -147.856 10.700
69 -18.656 -468.122 -100.630 -205.960 -4.455
70 -8.911 -265.694 -25.884 -5.820 -19.918
71 -20.994 -288.889 -27.530 -10.342 19.990
72 -15.316 -237.361 9.966 90.764 0.829
73 -15.310 -315.994 -61.395 -103.069 0.744
74 17.860 -187.957 -20.468 9.088 -127.340
75 19.065 -192.134 -26.221 -8.342 -131.898
76 -49.674 -362.556 -27.176 -7.798 133.410
77 -48.470 -366.733 -32.928 -25.228 128.852
78 -17.357 -190.782 36.752 184.826 8.524
79 -13.372 -205.118 17.597 126.722 -6.632
80 -17.238 -349.572 -70.994 -142.862 8.144
81 -13.253 -363.908 -90.149 -200.966 -7.012
Two Pile Combination cannot resist transverse moment,hence for shear,punching,BM calculations transverse moment is ignored. So for
pile cap parallel to X, Mx=0,Fz=0. And for pile cap parallel to Z, Mz=0,Fx=0.
file:///D:/CJNA/FINAL%20OUTPUTS/Construction%20of%20Barracks,%20NSJA/STA... 21/04/2021
Pile Cap Design Page 4 of 6
This is the load case for which the pilecap depth required is the maximum. If there are
multiple load cases for which the same maximum depth is required, then the load case with
the highest axial load (absolute value) is considered as the critical load case.
_ Arrangement Reaction
X Z Axial Lateral Uplift
Pile No.
(m) (m) (kN) (kN) (kN)
1 0.000 -0.600 -422.694 42.588 0.000
2 0.000 0.600 -297.150 42.588 0.000
Shear Force
Pile No.
x1-x1(kN)
1 0.000
2 0.000
file:///D:/CJNA/FINAL%20OUTPUTS/Construction%20of%20Barracks,%20NSJA/STA... 21/04/2021
Pile Cap Design Page 5 of 6
VC = = = 1065.229 kN
Selection of Reinforcement
Along Length
dBeta =
= 0.650
Smin<= S <= 18 inch and selected bar size < selected maximum bar size. The reinforcement is accepted.
Along Width
For two Pile arrangement, no moment acts in transverse direction. So, minimum reinforcement is
sufficient.
file:///D:/CJNA/FINAL%20OUTPUTS/Construction%20of%20Barracks,%20NSJA/STA... 21/04/2021
Pile Cap Design Page 6 of 6
Concrete
3
- Length (m) Width (m) Thickness (m) Volume (m )
Formwork
Footing : 4.48 m2
Pedestal : 0.00 m2
Total : 4.48 m2
Soil Excavation
file:///D:/CJNA/FINAL%20OUTPUTS/Construction%20of%20Barracks,%20NSJA/STA... 21/04/2021