B&H TRANSPORT STRATEGIC DOCUMENTS
FRAMEWORK TRANSPORT POLICY OF BOSNIA AND HERZEGOVINA FOR THE PERIOD 2015 - 2030
(Official Gazette of BiH 62/15)
• Vision
• Objectives
• Regional cooperation and EU integration of BiH
• Promoting sustainable economic and social development
FRAMEWORK TRANSPORTATION STRATEGY OF BOSNIA AND HERZEGOVINA (Official Gazette of BiH
71/16)
• Infrastructure
• Services
• Regulatory issues
• Intermodal transport
4
BOSNIA AND HERZEGOVINA RAILWAY NETWORK
5
TECHNICAL CHARACTERISTICS OF THE
RAILWAY NETWORK
• Railway Network of B&H is 1048 km long, with standard gauge of 1032 km;
• Railway Network is single track, except of the 87 km of double track;
• 776 km of the Network is Electrified with system 25kV and 50Hz;
• Total number of the railway stations is 103, 52 stations with full interlocking
system and 51 stations with simple interlocking system;
• Total number of the level crossings 491;
• Gauge Profile UIC GA and GB;
• Maximum speed Vmax=120km/h;
• Axle load D4 (22,5 t/ax) and C3(20 t/ax)
6
NUMBER OF EMPLOYEES
7
TRANSPORT VOLUME
PROJECT DESCRIPTION M€
1. Signalling and Telecommunications System on the section Doboj – Banja 19,1
Luka
2. Reconstruction of the track section Sarajevo – Bradina and tunnel 25,4
„Ivan“
4. Procurement and installing of the optical fiber from Bradina station to 2,4
the Čapljine bordercrossing station 9
FUTURE INFRASTRUCTURE PROJECTS
10
Status of Status of
Investment Railway Investment
Railway section L(km) technical L(km) technical
(Mil.Euro) section (Mil.Euro)
documentation documentation
Route 9a (parallel to Corridor X)
ŽFBiH
ŽFBiH
Total
Total
ŽRS
ŽRS
Corridor Vc
Main design and Feasibility study Conceptual design and Pre F/S
Jelina-Zenica 9 for overhaul
- 10 10 Živinice- for overhaul, electrification, t/c
Caparde- and signalization are planned by
45 the EU IPA 2017. Preparing of
54 36 90
Conceptual design and Zvornik (incl.
Zenica- Prefeasibility study for overhaul. the M/D and F/S is planned by the
55,2 Preparing of the M/D and F/S is
- 54 54 tunnel Križevići) EU IPA 2019
Podlugovi
planned by the EU IPA 2017
15
CONNECTIVITY WITHIN THE PAN
EUROPEAN CORRIDORS
16
FUTURE CONNECTION TO THE MEDITERRANEAN
TRANSPORT CORRIDOR
Vc
17
CONCLUSIONS & RECOMMENDATIONS