Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

19210

1050
4390

BASEMENT LEVEL (1) PLAN

NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

BASEMENT FLOOR PLAN

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 A-100 APR-2021 EA


No 36 - 38

+5.62
1100

+4.63

930

815

1010
200

BIKE STORE
A

A
150
BIN STORE
8470 1250

1150

800
1100

1000

1000

1500
325 1830 2200

200
B

B
No 34

765
3255

3350
CHAIR LIFT

150
ATRIUM WITH GLASS BANISTER
2080

+4.63

1660
+5.62

1400
No 32
NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

GROUND FLOOR LEVEL (2&3) PLAN

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

GROUND FLOOR PLAN

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 A-101 APR-2021 EA


2 +8.90 +7.58 1

1000
1425
1425
1200

2280
2305

150
Open Plan

1000

2500
Open Plan
Living/Dining/Sleep
Living/Dining/Sleep 1000 1750 1000
Area
Area 900 900

Shower Shower
Room Room

1m² 1m²
Bin space
with 80l Storage Storage Bin space
capacity
BOILER
with 80l
capacity BOILER

FIRST FLOOR LEVEL (4&5) PLAN

NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

FIRST FLOOR PLAN

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 A-102 APR-2021 EA


+10.23

1000
3
1425
1200

2280

150
Open Plan

1000

2500
Living/Dining/Sleep
1000 1750 1000
Area
900

Shower
Room

1m²
Storage Bin space
with 80l
capacity BOILER

MEZZANINE LEVEL - BEDSIT FLAT 3 - 41m² int gross


MEZZANINE FIRST/SECOND LEVEL (6) PLAN

NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

MEZZANNINE FLOOR PLAN

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 A-103 APR-2021 EA


1425 2 +11.55 +12.88

1000
1095
4 1200

2280
2305

150
5
Open Plan

1000

2500
Open Plan
Living/Dining/Sleep
Living/Dining/Sleep 1000 1750 1000
Area
Area 1100

Shower Shower
Room Room

1m² 1m²
Bin space
with 80l Storage Storage Bin space
capacity
BOILER
with 80l
capacity BOILER

LOWER SECOND FLOOR BEDSIT FLAT 5 - 38m² int gross SECOND FLOOR BEDSIT FLAT 4 - 37m² int gross

SECOND FLOOR LEVEL (7&8) PLAN


NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

SECOND FLOOR PLAN

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 A-104 APR-2021 EA


+15.73

+14.75

2300
SECOND FLOOR +12.88

350
2485

+11.55
350

SECOND FLOOR

2300
+10.23
MEZZANINE FLOOR

350

11130
9175

2300
7176

+8.90
350

FIRST FLOOR

2300
+7.58
GOLDHAWK STREET

FIRST FLOOR

350
2900

REAR STREET
2600
+5.65
GROUND FLOOR

GROUND FLOOR +4.63

NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

BASEMENT FLOOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

SECTION A-A

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 A-105 APR-2021 EA


1 2 3 4 5 6

4707 4595 2150 4005 4005


P1

C1 P1

P1
A C1 C1

P1
C1
P1

P1
C1 C1

19210

STRUCTURE SCHEDULE

1050
UB 254 X 102 X 25 MARK W H D
4390

P1 1200 X 1200 X 1200

C1 UC 254 X 254 X 73

P1
P1

P1

P1

P1

P1
C1 C1 C1
B C1 C1 C1

BASEMENT LEVEL (1) PLAN

NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

STRUCTURAL BASEMENT FLOOR

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-100 APR-2021 EA


1 2 3 4 5 6
PAD UNDERPINNING PAD UNDERPINNING PAD UNDERPINNING UNDERPINNING
4707 4595 2150 PAD PAD PAD
4005 4005
P1

C1

P1
A C1 C1

P1

P1
C1

P1

P1
C1 C1

19210

STRUCTURE SCHEDULE

UNDERPINNING
1050
UB 254 X 102 X 25 MARK W H D
4390
UNDERPINNING

P1 1200 X 1200 X 1200

C1 UC 254 X 254 X 73
P1

P1

P1

P1

P1

P1
300 600

C1 C1 C1
B C1 C1 C1

PAD UNDERPINNING PAD UNDERPINNING PAD PAD UNDERPINNING PAD PAD


UNDERPINNING
UNDERPINNING
UNDERPINNING LEVEL (1) PLAN
NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

STRUCTURAL UNDERPINNING PLAN

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-101 APR-2021 EA


UC 254 X 254 X73
TYP.

3.790

75 MAX

PACK
DRY
MASS
CONC.
UNDERPIN
1200 x 1200 x 1200
1200

NP EA

1200 0
10/04/21 10/04/21

APPROVED BY
DESCRIPTION REVISED BY
REV.
AND DATE AND DATE

CONTRACTOR

CONCRETE PAD
FOUNDATION DETAIL
Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

CONCRETE PAD FOUNDATION DETAIL

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/16@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-102 APR-2021 EA


STRUCTURE SCHEDULE

MARK W H D

B1 UC 203 X 203 X 71

C1 UC 203 X 203 X 71

RC1 600 X 151 MM

BEAM UB
203 X 133 X 30
BEAM UB
1 254 X 102 X 25 2 3 4 5 6
No 36 - 38
4707 4595 2150 4005 4005
C1
A C1 C1 C1
C1 C1
+5.62
1100

+4.63

930
ADDITIONAL COLUMN FOR

815

1010
RETAINING WALL STABILITY
200

BIKE STORE
A

A
150
BIN STORE
UB 254 X 102 X25 8470 1250

1150

800
1100

1000

1000

1500
325 1830 2200

200
B

B
No 34

765
3255

3350
CHAIR LIFT

150
WALK OVER GLASS
ATRIUM WITH GLASS BANISTER
2m X 1m +4.63

1660
+5.62

1400
C1 C1 C1
B C1 C1 C1

No BEAM
32 UB
254 X 102 X 25

NP EA
0
10/04/21 10/04/21

GROUND FLOOR LEVEL (2&3) PLAN REV.

CONTRACTOR
DESCRIPTION REVISED BY
AND DATE
APPROVED BY
AND DATE

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

STRUCTURAL GROUND FLOOR

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-103 APR-2021 EA


1 2 3 4 5 6

4707 4595 2150 4005 4005


C1
A C1 C1 C1
C1 C1
STEEL CONNECTION +5.62
STEEL CONNECTION +4.63
CONNECTION (L) STEEL CONNECTION STEEL CONNECTION
CONNECTION (L) CONNECTION (L) CONNECTION (L) STEEL CONNECTION STEEL CONNECTION
CONNECTION (L) CONNECTION (L)
BEAM 11 1NO. UC203X203X71

BEAM 11 1NO. UC203X203X71

BEAM 11 1NO. UC203X203X71

BEAM 11 1NO. UC203X203X71

BEAM 11 1NO. UC203X203X71

BEAM 11 1NO. UC203X203X71


BEAM 9 1NO. UC203X133X30
BEAM 1 1NO. UC254X254X73

STEEL CONNECTION STEEL CONNECTION STEEL CONNECTION


B

CONNECTION (E) CONNECTION (E) CONNECTION (F)

CHAIR LIFT

ATRIUM WITH GLASS BANISTER

+4.63
STEEL CONNECTION +5.62
CONNECTION (A)
C1 C1 C1
B C1 C1 C1

STEEL CONNECTION STEEL CONNECTION STEEL CONNECTION STEEL CONNECTION STEEL CONNECTION
CONNECTION (L) CONNECTION (L) STEEL CONNECTION
CONNECTION (L) CONNECTION (L) CONNECTION (L) CONNECTION (L)

GROUND FLOOR LEVEL (2&3) PLAN

NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

STEEL CONNECTION GROUND FLOOR

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-104 APR-2021 EA


A B A B

4445

+14.88
4510

UC 203x203x71

UC 203x203x71
+11.55 +11.55

UC 203x203x71

UC 203x203x71
UC 203x203x71
UC 203x203x71
2650

+8.90 +8.90
UC 203x203x71

UC 203x203x71

UC 203x203x71
UC 203x203x71
3250

+5.65 +5.65
UC 203x203x71
UC 203x203x71
UC 203x203x71

NP EA

UC 203x203x71

UC 203x203x71
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

+2.35 +2.35

+0.67 +0.67 Status

PROPOSED

4510 4445 Contract

34 Goldhawk Road London W12 8DH 0


Title

STRUCTURAL ELEVATIONS
ELEVATION @ AXIS (1) ELEVATION @ AXIS (2) JOB No.
W/ LEVELS TO TOP FINISHED FLOOR
SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-105 APR-2021 EA


B A
4265

+15.73

UC 203x203x71

UC 203x203x71
+12.88

UC 203x203x71

UC 203x203x71
+10.23

UC 203x203x71

UC 203x203x71
+7.58

UC 203x203x71

UC 203x203x71
+4.63
UC 203x203x71

UC 203x203x71
NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR

+2.35

+0.67 Status

PROPOSED

Contract

4265
34 Goldhawk Road London W12 8DH 0
Title

STRUCTURAL ELEVATIONS
ELEVATION @ AXIS (6) JOB No.
W/ LEVELS TO TOP FINISHED FLOOR
SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-106 APR-2021 EA


6 5 4 3 2 1

3 7. 5 1 + 4005 4005 2150 4595 4707


+15.53 UC 254x102x25 UC 254x102x25 UC 254x102x25

+14.88 57.41+
UC 203x203x71

UC 203x203x71
UC 203x203x71
UC 254x102x25

0032

UC 203x203x71

UC 203x203x71
+12.88 88.21+ ROO LF DNOCES
UC 254x102x25

053
UC 254x102x25

5842
UC 203x203x71

UC 203x203x71

UC 203x203x71
+11.55 55.11+

053
UC 254x102x25 UC 254x102x25
ROOLF DNOCES UC 254x102x25
0032

GOLDHAWK STREET
UC 203x203x71
UC 203x203x71

UC 203x203x71
+10.23 32.01+
ROUC
OLF ENINAZZEM
053

254x102x25
03111

UC 254x102x25

5719
0032
UC 203x203x71

UC 203x203x71

UC 203x203x71

6717
+8.90 09.8+
UC 254x102x25 UC 254x102x25 UC 254x102x25

053
ROOLF TSRIF
0032
REAR ROAD

UC 203x203x71
85.7+

TEERTS KWAHDLOG
+7.58

UC 203x203x71
UC 254x102x25 ROOLF TSRIF
053

UC 254x102x25

UC 203x203x71
0092
UC 203x203x71

UC 203x203x71
UC 203x203x71
TEERTS RAER

0062

+5.65 UC 254x102x25 56.5+


UC 254x102x25ROOLF DNUORG UC 254x102x25

+4.63 36.4+ ROOLF DNUORG


UC 254x102x25 UC 254x102x25
UC 203x203x71

UC 203x203x71
EA

UC 203x203x71
NP
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


UC 203x203x71

REV.
UC 203x203x71

AND DATE AND DATE


UC 203x203x71

CONTRACTOR

+2.35 ROOLF TNEMESAB

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

SIDE VIEW @AXIS (A) STRUCTURAL ELEVATIONS


W/ LEVELS TO TOP FINISHED FLOOR
JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-107 APR-2021 EA


1 2 3 4 5 6

4707 4595 2150 4005 4005


UC 254x102x25 UC 254x102x25 UC 254x102x25 +15.53

+14.88

UC 203x203x71
UC 203x203x71

UC 203x203x71
UC 254x102x25

UC 203x203x71
UC 203x203x71
+12.88
UC 254x102x25 UC 254x102x25

UC 203x203x71
UC 203x203x71
UC 203x203x71
+11.55
UC 254x102x25 UC 254x102x25 UC 254x102x25
GOLDHAWK STREET

UC 203x203x71

UC 203x203x71
UC 203x203x71

+10.23
UC 254x102x25 UC 254x102x25

UC 203x203x71
UC 203x203x71
UC 203x203x71
+8.90
UC 254x102x25 UC 254x102x25 UC 254x102x25

REAR ROAD
UC 203x203x71
+7.58
UC 203x203x71

UC 254x102x25 UC 254x102x25
UC 203x203x71

UC 203x203x71
UC 203x203x71

UC 203x203x71
UC 254x102x25 +5.65
UC 254x102x25 UC 254x102x25

+4.63
UC 254x102x25 UC 254x102x25
UC 203x203x71
UC 203x203x71
UC 203x203x71

NP EA
0
10/04/21 10/04/21

UC 203x203x71
UC 203x203x71

UC 203x203x71
DESCRIPTION REVISED BY APPROVED BY
REV.
AND DATE AND DATE

CONTRACTOR

+2.35

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

SIDE VIEW @AXIS (B) STRUCTURAL ELEVATIONS


W/ LEVELS TO TOP FINISHED FLOOR
JOB No. SCALE DRG. INITIATED BY REVISIONS

1/75@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-108 APR-2021 EA


GENERAL NOTES B A
EXCAVATION
1. EXCAVATION MUST BE FULLY SUPPORTED BY
PROPS AND SHORING
2. EDGE PROTECTION TO PROVIDED TO PREVENT
4655
FALLS INTO THE EXCAVATION
3. A TEMPORARY VERTICAL PROP OR SUPPORT MAY
BE PLACED UNDER THE WALL TO KEEP ANY LOOSE EXISTING HEAD BEAM
BRICKS OR MASONRY IN PLACE EXISTING BRICK WALL
4. THE MAIN LOAD FROM THE EXISTING WALL WILL M20 BOLTS
SPAN ONTO THE WALL AND FOUNDATIONS ON
EITHER SIDE OF THE EXCAVATION

CONCRETE PLACEMENT
1. BOTTOM EXCAVATION PREPARED FOR CONCRETE
TO ENSURE FLAT SURFACE
2. CONCRETE PLACED AND VIBRATED TO WITHIN
75mm OF EXISTING FOUNDATION
PROTECTION BOARD
DRYPACK AS PER SPECIFICATION
1. AFTER MINIMUM OF 24 HOURS CONCRETE BASE
CAN BE DRY PACKED USING A 1:1 MIXTURE OF
SHARP SAND AND CEMENT. RAMMED HARD WITH
MIN. WATER CONTENT TO ENSURE LITTLE
SHRINKAGE. NEW COLUMN H25@200
UB 254 X 102 X 25 LONGITUDINAL LOOSE REBARS

STEEL COLUMN C1
UC254X254X73

+4.79
EX. GRND.

1000
LAP
H25@200 O.C E.A
NIBBLE BACK FOOTING REINFORCEMENT
EXISTING CORBEC

150
STRUCTURAL SLAB
H25@200
+2.85 600 LONGITUDINAL LOOSE REBARS
+2.85 T.O.R 1000mm DEVELOPMENT LENGTH
T.O.R

600 250
200
BASE PLATE
STEEL ANCHOR BOLTS PIN / DOWEL

1200
NP EA
0

MASS CONCRETE PAD


10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

CONTRACTOR
NEW UNDERPINNING MASS CONCRETE
1200 (WIDTH) X 1200mm (DEPTH)

250
LONGITUDINAL REINFORCEMENT = H25@200mm
TRANSVERSE REINFORCEMENT = H25@200mm
USE REINFORCEMENT H25@600 O.C. E.A.
TO PREVENT SHRINKAGE FOR CONCRETE FOOTING REINFORCEMENT

Status

2 UNDERPINNING AT GL-4 (TYP.) BLINDING CONCRETE AS PER PROPOSED


ST-100-00 SCALE : 1:25 SPECIFICATION Contract

WELL COMPACTED SOIL


34 Goldhawk Road London W12 8DH 0
Title
UNDERPINNING DETAIL
ALONG GL-4 (TYP.)
JOB No. SCALE DRG. INITIATED BY REVISIONS

1/25@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-109 APR-2021 EA


EXISTING BRICK WALL

PROTECTION BOARD
AS PER SPECIFICATION

H25@200
LONGITUDINAL LOOSE REBARS

BRICK WALL

1000
LAP
H25@200 O.C E.A
STRUCTURAL SLAB FOOTING REINFORCEMENT
150

H25@200
+2.85 600 LONGITUDINAL LOOSE REBARS
T.O.R 1000mm DEVELOPMENT LENGTH
250
200

PIN / DOWEL
600
1200

MASS CONCRETE PAD


UC 253 X 253 X 73 UNDERPIN
COLUMN
250

H25@600 O.C. E.A.


FOOTING REINFORCEMENT

NP EA
0
10/04/21 10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.
AND DATE AND DATE

BLINDING CONCRETE AS PER CONTRACTOR


SPECIFICATION
WELL COMPACTED SOIL

1 RETAINING WALL SECTION


ST-100-00 SCALE : 1:25

MASS CONCRETE PAD


1.20 X 1.20 X 1.20 Status

PROPOSED

THE STRUCTURAL SLAB IS STEPPED ON ITS Contract

HIGHER SIDE. ITS DOWELLED INTO THE PAD 34 Goldhawk Road London W12 8DH 0
SUPPORTING COLUMNS. AND THE LOWER Title
UNDERPINNING DETAIL
SIDE IS DOWELLED INTO THE TOE OF THE
RETAINING WALL JOB No. SCALE DRG. INITIATED BY REVISIONS

1/25@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-110 APR-2021 EA


GROUND LEVEL
EXISTING HEAD BEAM
CONCRETE 140 mm +4.63
METAL DECK COMFLOR 80

M20 BOLTS
CASING - MASS POUR OF
CONCRETE
EXISTING BRICK WALL

PROTECTION BOARD
AS PER SPECIFICATION

NEW COLUMN H25@200


UB 254 X 102 X 25 LONGITUDINAL LOOSE REBARS

DRY PACKING

H25@200
LONGITUDINAL LOOSE REBARS
1000mm DEVELOPMENT LENGTH
STRUCTURAL SLAB 150

+2.85 600
T.O.R
BASE PLATE
200

PIN / DOWEL H25@200 O.C E.A


600

FOOTING REINFORCEMENT 0
NP
10/04/21
EA
10/04/21

DESCRIPTION REVISED BY APPROVED BY


REV.

MASS CONCRETE PAD AND DATE AND DATE

CONTRACTOR

H25@200 O.C. E.A.


FOOTING REINFORCEMENT

Status

PROPOSED
BLINDING CONCRETE AS PER
SPECIFICATION Contract

WELL COMPACTED SOIL 34 Goldhawk Road London W12 8DH 0


Title
RETAINING WALL & COLUMN DETAIL
2 RETAINING WALL AND COLUMN SECTION
ST-100-00 SCALE : 1:25
JOB No. SCALE DRG. INITIATED BY REVISIONS

1/25@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-111 APR-2021 EA


Code 5 lead apron flashing
between brick gable and
mansard roof
Code 5 lead flashing to ridge,
hollow roll with clipped lap joints
brick on end coping detail with
slate bedding to gable wall
slate roof tiles vertically
hung on battenc-batten with
breather membrane
new mansard roof to be
constructedto match
mansard extensions of adjacent
properties
150x50 C16 timber joists and
horizontal rafters with mineral
wool insulation between, WBP
plywood outer sheet
Code 5 lead cladding to new
dormer window beyond

lead valley gutter. laid to central


fall, chased and flashed into
existing masonry parapet 0
NP
10/04/21

REVISED BY
EA
10/04/21

APPROVED BY
REV. DESCRIPTION
AND DATE AND DATE

CONTRACTOR

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

ROOF DETAIL

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/15@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-112 APR-2021 EA


Single glazed walk-on product
for internal use

A A

Internal Finished Opening Span


1000 mm Product Height
Internal Finished Opening Width Glass Spec Product Height
2000 mm 25.5 mm 35.0 mm
33.0 mm 44.5 mm
Section ( Scale 1 : 4 ) 39.0 mm 51.0 mm
Section through installation detail

3mm Gap Packing to support


flooring (by others) Section ( Scale 1 : 4 )
50.7mm Upstand dimensions to
Flooring finish to be applied be constructed by others
Black obscured after installation (by others) Flooring finish shown
Walk-on to demonstrate depth
area of glazing 105mm
glass unit of product
9.5mm

Product height Product height


(see table) Support for flooring (see table)
(by others)
Internal Finished Opening
Powder coated measured to this point
aluminium framework
NP EA

15mm MAX
0
10/04/21 10/04/21

Structural support Site applied structural fixing REV. DESCRIPTION REVISED BY APPROVED BY

(supplied by Glazing Vision) Internal finishes 90mm MIN


AND DATE AND DATE

for CONTRACTOR
product (by others) Structural upstand
54.1mm ref.

Status

PROPOSED

Contract

34 Goldhawk Road London W12 8DH 0


Title

WALKOVER GLASS DETAIL

JOB No. SCALE DRG. INITIATED BY REVISIONS

1/4@A3 NP 0

1:500 5m 10 20 30 40 50 60 70 80 90 1:1250 10 20 30 40 50 100


DRAWING No. DATE DRG. CHECKED BY

1:50 1m 2 3 4 5 6 7 8 9 1:100 1m 2 3 4 5 6 7 8 9 10 S-113 APR-2021 EA

You might also like