Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Khwaja Yunus Ali University

School of Science & Engineering


Department of Electrical and Electronic Engineering
Online Final Examination: Spring-2021
th rd st
Program: B.Sc. in EEE (8 Batch), 3 Year 1 Semester
Course Title: Fundamentals of Power System
Course Code: EEE 3107

Time: 10 Minutes Part-1 (MCQ) Total Marks: 10×1=10


[There are single best answer types of questions .Each of the following statement or a question has five suggested
answer or completion. Write down the most appropriate one on your answer script.]

1. The critical clearing time of a fault is power system is related to ---------limit.

(a) reactive power


(b) active power
(c) short circuit
(d) steady state stability
(e) transient stability
2. Which portion of our system is least prone to faults?
(a) Alternator
(b) Transformer
(c) Overhead lines
(d) Underground cable
(e) Underground lines
3. In transmission lines the cross arms are made of -----------
(a) copper
(b) wood
(c) R.C.C
(d) steel
(e) rod
4. Voltage regulation of a transmission line should be ------------.
(a) minimum
(b) maximum
(c) less than 50%
(d) more than 50%
(e) between 100% to 90%
5. The most serious type of 3 phase symmetrical fault is-------------fault.

(a) 3 phase short circuit


(b) single line to ground
(c) line to line
(d) double line to ground
(e) phase to phase
6. Load buses are known as-----------.
(a) P-Q
(b) P-V
(c) P-R
(d) Q-R
(e) R-V
7. ‘’Negative sequence impedance > Positive sequence impedance’’ occurs on the ----------.
(a) induction motors
(b) transformers
(c) transmission lines
(d) synchronous motors
(e) synchronous generators
8. The impedance offered by an equipment or circuit to negative sequence current is represented by-----------.
(a) Z1
(b) Z2
(c) Z3
(d) Z4
(e) Z0
9. Length of the cable is doubled, its capacitance c will be---------.
(a) one fourth
(b) one half
(c) doubled
(d) unchanged
(e) tripled
10. What should be the minimum depth (in metre ) of cable trench to dug for lying of 1.1KV?
(a) 0.75
(b) 0.90
(c) 1.05
(d) 1.20
(e) 3
Part-2 (SAQ)

Total time: 1 Hour and 50 Minutes Mark: 5×6=30


(Answer question no 1 and any four (4) questions from the followings)
(The figures of the right margin indicates full marks of the respective questions)

1. (a) Define ‘’Sub-station’’ [1]

(b) Draw the single line diagram of 11/400KV indoor substation. [2.5]
(c) Compare between indoor and outdoor substation. [2.5]

2. (a) Derive an expression for fault current of single line to ground fault by symmetrical component method. [3]
(b) The per unit values of positive, negative and zero sequence reactance of a network at fault are 0·08, 0·07 [3]
and 0·05. Determine the fault current if the fault is double line-to ground.

3. (a) A 3-phase transmission line operating at 10 kV and having a resistance of 1Ω and reactance of 4 Ω is [3]
connected to the generating station bus-bars through 5 MVA step-up transformers having a reactance of
5%. The bus-bars are supplied by a 10 MVA alternator having 10% reactance. Calculate the short-circuit
kVA fed to symmetrical fault between phases if it occurs
(i) at the load end of transmission line
(ii) at the high voltage terminals of the transformer
(b) A 3-phase alternator can supply a maximum load of 5000 kVA at 6600 V. The machine has internal [3]
reactance of 6%. Find the reactance per phase of the limiting reactor if the steady apparent power (kVA)
on short-circuit is not be exceed 5 times the full-load value.

4. (a) How can we boost voltage in A.C. power system? [2]

(b) Using symmetrical component prove that complex power, [4]

5. (a) Mention the diagonal and non-diagonal elements of Jacobean matrix elements equation for Newton- [3]
Raphson method of power flow analysis.

(b) Prove that for power flow equation ∑ ∑ [3]

6. In the three bus bar system shown in the following Figure-1, bus 1 is a slack bus with V1=1.05∠0° pu. A [6]
load of 256.6 MW and 110.2 MVAR is taken from bus 2 and another load from bus 3 is 138.6MW and
45.2MVAR. The line admittance is given in the question figure on a base of 100 MVA. Using the Gauss-
Seidel method, obtain the voltage magnitude and phase angle of bus 2 and bus 3. Perform three
iterations.

Figure: 1

You might also like