FIELD INSPECTION AND TESTING REPORT

INSULLATION RESISTANCE & CONTINUITY TEST FOR POWER CABLE

OWNER : PT PLN Persero CHECK SHEET NO. : TEI-DOC-KAL-IX-501-01

MAIN CONTRACTOR : PT ALTRAK 1978 SYSTEM NAME : INSULLATION RESISTANCE & CONTINUITY TEST

LOCATION : PLTD Muara Komam WEATHER : SUNNY

Instrument Test Equipment: Kyoritsu Insulation-Continuity Tester Model 3005A

Test Voltage
Purpose of Test (Tick Appropriate Box) After Cable Pulling Test Duration
(1000Volt.)
Cond. Size
Cable No. Cable Rated Voltage From To M Ohm Continuity Passed Or Failed
( mm2 )
R1 - GRD 0,6/1,2kV 240 mm² GCP Transformer 400 OK Passed

R2 - GRD 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

R3 - GRD 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

S1 - GRD 0,6/1,2kV 240 mm² GCP Transformer 400 OK Passed

S2 - GRD 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

S3 - GRD 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

T1 - GRD 0,6/1,2kV 240 mm² GCP Transformer 400 OK Passed

T2 - GRD 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

T3 - GRD 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

R1 - S1 0,6/1,2kV 240 mm² GCP Transformer 400 OK Passed

R1 - T1 0,6/1,2kV 240 mm² GCP Transformer 400 OK Passed

S 1 - T1 0,6/1,2kV 240 mm² GCP Transformer 400 OK Passed

R2 - S2 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

R2 - T2 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

S2 - T2 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

R3 - S3 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

R3 - T3 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

S3 - T3 0,6/1,2kV 185 mm² GCP Transformer 400 OK Passed

Note :

REPRESENTATIVE NAME SIGN DATE

PT ALTRAK 1978 11-Sep-17

PT TANG ENERGY INTERNATIONAL 11-Sep-17

PT PLN Persero 11-Sep-17


FIELD INSPECTION AND TESTING REPORT

INSULLATION RESISTANCE & CONTINUITY TEST FOR POWER CABLE

OWNER : PT PLN Persero CHECK SHEET NO. : TEI-DOC-KAL-IX-501-02

MAIN CONTRACTOR : PT ALTRAK 1978 SYSTEM NAME : INSULLATION RESISTANCE & CONTINUITY TEST

LOCATION : PLTD Muara Komam WEATHER : SUNNY

Instrument Test Equipment : Kyoritsu Insulation-Continuity Tester Model 3005A

Test Voltage
Purpose of Test (Tick Appropriate Box) After Cable Pulling Test Duration
(5000Volt.)
Cond. Size
Cable No. Cable Rated Voltage From To M Ohm Continuity Passed Or Failed
( mm2 )
R - GRD 12/20kV 50 mm² Transformer MV Panel OK Passed
S - GRD 12/20kV 50 mm² Transformer MV Panel OK Passed
T - GRD 12/20kV 50 mm² Transformer MV Panel OK Passed
R-T 12/20kV 50 mm² Transformer MV Panel OK Passed
S-T 12/20kV 50 mm² Transformer MV Panel OK Passed
T-R 12/20kV 50 mm² Transformer MV Panel OK Passed

Note :

REPRESENTATIVE NAME SIGN DATE

PT ALTRAK 1978

PT TANG ENERGY INTERNATIONAL


Test Voltage
Purpose of Test (Tick Appropriate Box) After Cable Pulling (5000Volt.)
Test Duration

Cond. Size
Cable No. Cable Rated Voltage From To M Ohm Continuity Passed Or Failed
( mm2 )

PT PLN Persero
FIELD INSPECTION AND TESTING REPORT

EARTHING RESISTANCE TEST FOR GROUNDING SYSTEM

OWNER : PT PLN Persero CHECK SHEET NO. : TEI-DOC-KAL-IX-501-03

MAIN CONTRACTOR : PT ALTRAK 1978 SYSTEM NAME : EARTHING TEST

LOCATION : PLTD Muara Komam WEATHER : SUNNY

Instrument Test Equipment : HIOKI FT6031 EARTH TESTER

Result
No. Point of Earthing Remarks
(Ohm)

1 Body Transformer
1.00
2 Lightning 1
0.24
3 Lightning 2
0.24
4 Body Generator
0.27
5 Earthing Test for Existing PLN
0.87

Note :

REPRESENTATIVE NAME DATE SIGN

PT ALTRAK 1978 11-Sep-17

PT TANG ENERGY INTERNATIONAL 11-Sep-17


Result
No. Point of Earthing Remarks
(Ohm)

PT PLN Persero 11-Sep-17