BILL OF QUANTITIES (MECHANICAL)

PROJECT : PROJECT CARRAGEENAN CLIENT : FARMESA ASIA PAIFIC INC. (FAPI)


LOCATION : LISP IV, MALVAR, BATANGAS CONTRACTOR : VERNOULLIS INDUSTRIAL CORP.
DATE PREPARED : 24-Aug-17

UNIT COST
ITEM DESCRIPTION UNIT QTY AMOUNT
(INSTALLED)
I. MECHANICAL INSTALLATION AND RELATED WORKS
A. Mechanical (Process and Industrial Utility Piping)
1 Process Utilities
a. Process Water System
1 lot 1 ₱ 128,652.23 ₱ 128,652.23
B. Steam and Condensate System
1 lot 1 ₱ 187,479.61 ₱ 187,479.61
C. LPG Line System
1 lot 1 ₱ 376,039.62 ₱ 376,039.62
D. Diesel Line System
1 lot 1 ₱ 217,302.92 ₱ 217,302.92
E. Ventilation System (Process and Storage Rooms)
1 lot 1 ₱ 310,335.38 ₱ 310,335.38

Summary I ₱ 1,219,809.76

II. INDUSTRIAL UTILITIES


A. Domestic Water Line System
1 lot 1 ₱ 278,787.99 ₱ 278,787.99
B. Air Conditioning System
1 lot 1 ₱ 383,301.07 ₱ 383,301.07

Summary II ₱ 662,089.06

III. CLIENT SUPPLIED EQUIPMENT (INSTALLATION)


A. Dyer Equipment and Appurtenances
1 lot 1 ₱ 25,933.77 ₱ 25,933.77
B. Grinding Equipment and Appurtenances
1 lot 1 ₱ 32,417.21 ₱ 32,417.21
C. Powder Packer Equipment and Appurtenances
1 lot 1 ₱ 25,285.42 ₱ 25,285.42

Summary III ₱ 83,636.40

IV. PROCESS EQUIPMENT FABRICATED ITEMS


A. Cooking/Washing Fabricated Equipments
1 Sorting Table
a. set 1 ₱ 28,527.14 ₱ 28,527.14
2 Srew Conveyor with Chute
a. set 1 ₱ 63,240.01 ₱ 63,240.01
3 Pre-Washed Tanks
a. set 1 ₱ 69,346.89 ₱ 69,346.89
4 Cooking Tanks
a. set 4 ₱ 233,403.90 ₱ 933,615.60
5 Final washed Tanks
a. lot 1 ₱ 50,181.84 ₱ 50,181.84
6 First Washed Tanks
a. lot 1 ₱ 50,181.84 ₱ 50,181.84
7 Liquor Tanks
a. lot 1 ₱ 226,920.46 ₱ 226,920.46
8 Modification Baskets/Dripping Bin
a. lot 1 ₱ 28,527.14 ₱ 28,527.14
9 Seewed Chopper
a. lot 1 ₱ 42,790.72 ₱ 42,790.72
10 Chopper Infeed Table
a. lot 1 ₱ 31,120.52 ₱ 31,120.52

Summary IV ₱ 1,524,452.16

V. DRYING FABRICATED EQUIPMENTS


A. Dryer Infeed band Conveyor
1 lot 1 ₱ 116,053.61 ₱ 116,053.61
B. Dryer Outfeed band Conveyor
1 lot 1 ₱ 49,274.16 ₱ 49,274.16
C. Dryer Outfeed band Conveyor
1 lot 1 ₱ 49,274.16 ₱ 49,274.16
D. Dryer Outfeed Grinder
1 lot 1 ₱ 42,790.72 ₱ 42,790.72

Summary V ₱ 257,392.65

VI. PROCESS PLATFORM/MEZZANINE


A. Process Working Platform
1 lot 1 ₱ 529,956.53 ₱ 529,956.53
B. Ladders and Railings
1 lot 1 ₱ 185,059.47 ₱ 185,059.47

Summary VI ₱ 715,016.00

VII. MISCELLANEOUS SYSTEM (AC, VENT, EXHAUST, ETC.)


A. Split/Packaged Type Room Air-Conditioning System
1 lot 1 ₱ 11,021.85 ₱ 11,021.85
B. and Other Areas
1 lot 1 ₱ 16,208.60 ₱ 16,208.60
C. Other Related Systems
1 lot 1 ₱ 10,373.52 ₱ 10,373.52

Summary VII ₱ 37,603.97

GRAND TOTAL ₱ 4,500,000.00


BIDDER/CONTRACTOR : VERNOULLIS INDUSTRIAL CORPORATION
NAME OF REPRESENTATIVE : JUNAR D. DIASANTA

DESIGNATION : MANAGER
SIGNATURE :