Accident Frequency Rate Target

2021/22 (1 April 2021 onwards)

Stretch Target AFR < 3.2

Target AFR < 5.0

Accident Frequency Rate (AFR) Target


- Rolling 12 months reportable accidents per 1,000 workers
- Reviewed every year (End March)
Accident Statistics
LAND & SYSTEM WORKS Two (2) Reportable Accident
Accident Frequency Rate (Rolling 12 Months) in August 2021
(Ending 31 August 2021)
Construction Industry (2019): 29.0
8
7.9 7.3 Construction Industry (2020): 26.1
7 6.7
6.5 6.4
6.2
6.0 5.9 5.9
6 5.6
AFR per 1,000 workers

5.2 5.3

5
Target ( FY2021-22 ) < 5.0
4

3 Stretch Target
3 (FY2021-22) < 3.2
2 2 2
2
2
1 1 1
1
0 0 0 0
0
Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21
No. of Reportable Accidents Rolling 12 Months
Contractor’s Cumulative AFR
HK Construction Industry : 27.7 (Year 2019) 31.7 (Year 2018)
TRD Land & Systems Rolling 12m : 5.6 (July 2021) 5.9 (Aug 2021)
TRD Target (2021/2022) : 5.0 Stretch : 3.2
July 21 Aug 21
3302 Eastern Vehicular Tunnel Advance Works CRBC 12.3 11.8 
3801 APM & BHS Tunnels on Existing Airport Island China State 7.0 6.8 
3503 Terminal 2 Foundation and Substructure Works Leighton-Chun Wo JV 6.2 6.4 
3301 North Runway Crossover Taxiway FJT-CHEC-ZHEC JV 3.5 3.5 
3508 Terminal 2 Expansion Works GECCL 0 1.9 
No Reportable Accident
New Integrated Airport Centres Wing
3402 3601 New Automated People Mover System (TRC Line) CRRC-PBTS JV
Enabling Works Hing
Sun Fook
3403 New IAC – Building and Civil Works 3602 Existing APM System Modification Works Niigata Transys
Kong

3603 3RS Baggage Handling System VISH

7
Sharing of TRD Accident
Reportable Accident – Left Fingers Injury
Date : 18 Aug 2021
Location : Area 2, L3
Circumstance :
IP was assigned to perform concrete block lifting. When IP completed
rigging, he instructed TC operator to start lifting.

IP observed that one of the hooks and the sling was tangled, he then
lowered (but not fully lowering the load) the load re-adjusting the position
of hook and at the same time instructing the crane operator to hold the Accident Scene Hook with
hook in position. After adjusting the sling, the tension released and his Defected Latch
finger was trapped between the hook and the sling.

Follow Up
1. First aid applied on site and IP was escorted to hospital and admitted
to ward for further observation.
2. Accident investigation was conducted by the managers
3. Reinforce safety sharing was provided to riggers by area supervisor
and lifting supervisor.
4. Rigger Cultural Assessment was arranged to assess all riggers by Simulation of accident
area managers and safety team.

8
Sharing of TRD Accident
Reportable Accident – Left Fingers Injury
Finding(s)

1. IP is a competent rigger/ Metal Formwork Erector registered


under CIC and with A12-Trade Test Certificate.
2. IP was assigned to life concrete block in Area 2, L3, GL 23 – 24
3. A 4-leg chain slings was used (Certificate dated 30 April 2021)
4. One of the latch on hook was defected and the throat opening
cannot be fully closed
5. IP was working alone on the task in roles of both rigger and
banksman.

Contributing factor(s)

1. The communicated lifting works safety rule on 3-3-3 principle,


2. Problem on the point/ tip load hook and defected latch on hook
and continue lifting with his hand or fingers on the hazardous
zone cause fingers being trapped.
3. Latch on the hook concerned was defected and the throat
opening cannot be fully enclosed when lifting.

9
Sharing of TRD Incident
Reportable Accident – Finger Injury
Date & Time : 26-Aug-2021 & 1630 hrs.
Location : APM (K-24), NAB
Circumstance:
IP and his co-worker were tasked to dismantle formwork at
APM, gridline K-24. IP had to strip the 1.8 meters of 2” x 4”
nailed vertical timbers which were placed outside the
formwork.
IP placed his left hand on top handrail in front of vertical
timber and attempted to pull vertical timber by his right hand
with full power.
Vertical timber came off after pulled and it struck the IP’s
middle finger/L, trapped between that timber and the handrail
and resulted in as fracture on finger tip.
Note: IP claimed that he was wearing a pair of semi-leather gloves.

10
Sharing of TRD Incident
Reportable Accident – Finger Injury
Remedial actions taken to prevent the recurrence:
 Lesson learnt review briefing is provided to the current work crew to strengthen
their hazard awareness to ensure no placing hands to any part with potential
hazard, i.e. position of top handrail.
 Reinforce the application of suitable tool(s) to avoid using hand for formwork
removal task.

11
Contractors’ Monthly
Site Safety Inspection Scores
Weekly Site Safety Inspection
Weekly Site Safety Inspection
Jul-21 Aug-21
100
99.5 99.4 99.5

99.0
99
98.5
98.3

98

97

96.0
96 95.8

95 94.8

94.3

94 93.8
93.6 93.6

93.0
93 92.8
92.5

92

3603 3602 3601 3801 3503 3508 3302 3403

13
Key Inspection Findings
Poor Welding Machine Management / Use of Non-approved AC Welding Set
No inspection record by CP Hot Work Permit showed all equipment
inspected and good working order

Loose welding cable and defective welding holder

Particular Specification (Safety)

14
Key Inspection Findings
Noise at Work on site
No Ear Protection defined No specified the distance for noisy machines or tools

Improvement Notice issued by LD


15
Key Inspection Findings
Poor access and egress

Risk
• Fall from height
• Slips and trips

16
Key Inspection Findings
Substandard Housekeeping Management

Risk
Risk
• • Slips
Slips and trips
and trips
• Collapse of
• Collapsematerials
of materials
• • Stab
Staband
and Cut
Cut

17
Fall Protection Rating
July 21 Aug 21

3601 New Automated People Mover System (TRC Line) PBTS-CRRC JV 10.0 10.0 

3602 Existing APM System Modification Works Niigata Transys 10.0 10.0 

3603 3RS Baggage Handling System VISH 10.0 10.0 


3302 Eastern Vehicular Tunnel Advance Works CRBC 9.9 9.6 
3503 Terminal 2 Foundation and Substructure Works Leighton-Chun Wo JV 9.7 9.6 
3508 Terminal 2 Expansion Works GECCL 9.7 9.5 
3403 New IAC SFK 9.6 9.5 
3801 APM & BHS Tunnels on Existing Airport Island China State 9.5 9.3 

18
Key Fall Protection Findings
No full planking Unsafe access and egress

Inadequate guardrail
Risk
Fall from
height

19
Electrical Safety Rating
July 21 Aug 21

3603 3RS Baggage Handling System VISH 10.0 10.0 


3602 Existing APM System Modification Works Niigata Transys 10.0 10.0 
3403 New IAC SFK 10.0 10.0 
3801 APM & BHS Tunnels on Existing Airport Island China State 10.0 10.0 
3302 Eastern Vehicular Tunnel Advance Works CRBC 9.0 10.0 
3503 Terminal 2 Foundation and Substructure Works Leighton-Chun Wo JV 9.5 9.5 
3508 Terminal 2 Expansion Works GECCL 9.5 9.5 
3601 New Automated People Mover System (TRC Line) PBTS-CRRC JV 10.0 NA NA

20
Key Electrical Inspection Findings
Damaged power cable and domestic socket used on site
Risk
• Electric Shock
• Damage of Cable
• Slip and Trip
• Fire

Cable laying on floor (Poor Power Cable Management)

21
Contractors’ Monthly Safety Reports
(August 2021)
Contractors’ Monthly Safety Reports

1. Risk of Key Safety Findings

2. Remedial Measures

3. Review of Remedial Measures


Contractor’s Report
1. 3801 – Site Management (21 nos. of IN)
2. 3508 – Management Strategy For Incident Handling
3. 3508 – Working Near Unprotected Edge at T2
4. 3503 – Dismantling of KP/Column, Tie & Bracing at T2 basement
5. 3503 – Unsafe rigging method for unloading of plywood

6. 3302 - Substandard sheet pile chain slings derigging sequence

23
Contractors’ Monthly Safety Reports
(3801)

Site Management -
LD improvement Notices
3801 – Poor Overall Site Management

Date : 18 Aug 2021 Ventilation Building:


Location : VB1 & Shaft 1b - Risk of fall at roof level

Observation:
A group of 10 LD Officers (2 from Safety
Management Office & 8 from Operation
Teams) visited 3801.

21 no. of Improvement Notices were


issued to CSCE & its subcontractors by LD
on 23 Aug 2021 relating to substandard
working platform, improper use of step
platform, unprotected projecting Shaft 1b:
nails/rebars and failure of equipping eye 1. Improper use of step platform (risk of fall)
2. Rebars without protection
protector etc. 3. No eye protecting while cutting timbers
4. Surveyors worked near the manhole (risk of fall)
PMR verbally stopped all works of roof
level at VB1 for two day and urged CSCE to
improve the overall conditions.

21 Improvement Notices & “Part 1” items


of Inspection Report Issued by LD
25
3801 – Follow Up Action

Management Actions taken as follows :-


a) Stop all work at the roof until performance was
improved to the satisfaction of CSCE PM
b) Stand-Down conducted and explained clearly
safety standard of TRD/3801 to all operatives
c) Enhance frontline supervision to ensure the fall
protective measures are reviewed from time to
time and ensure the suitable measures are
available at all time.
d) Plan ahead for the potential high risk area and
allocate suitable resource (material and
workforce) for fall protective measures
e) Daily Pre-work briefing by the frontline
supervisor to ensure all high risk area is
identified and respective safety measures
adopted
f) Designated housekeeping team for tidying the
work front and ensure all protruding object had
been properly protected or removed.

26
Contractors’ Monthly Safety Reports
(3508)

Management Strategy For Incidents Handling


5 Minor Cases in 15 days
The cases :-

Date Location Brief


Right forearm bruise and swollen by falling shackle
10 Aug 2021 Area 14
during the process of tightening a chemical toilet
Left back shoulder and right knee bruise as the IP fell on
20 Aug 2021 Area 2, L5 – L6
the scaffolding access
Right upper arm pain as IP strained his right upper arm
20 Aug 2021 Area 7
during cable tidying up works
Walkway between
24 Aug 2021 Right ankle sprained as IP stepped on stone
area 2 and 4
Area 2, L3, Smoke Right index finger contusion as IP’s finger hit by the
25 Aug 2021
duct area plywood when performing formwork dismantle works

28
3508 – Follow Up Action
Management Actions taken as follows :-

• Increase Senior Management PPD PD DPD and area managers Walks to


review the real site condition with and without the subcontractors.

• We have had a standdown and stopped works for a full day to improve
the site condition for Area 2.

• Increased inspections and use of IDRA and safety observations to


capture findings by frontline and safety team.

• Increased the number of supervision but more importantly ensure the


right person is available to push both safety and production.

• Enforce Gammons Rules

• Rule 3: If anything changes stop;

• Rule 4: If you spot anything unsafe stop the work.


Contractors’ Monthly Safety Reports
(3508)

Poor Site Management against Working Near


Unprotected Edge at T2
3508 –Working at Floor edge at T2

Date : 20 Aug 2021


Location : L6, Area 2

Observation:
A steel fixer was working at the
unprotected edge that could be liable to
fall more than 2 meters height. Moreover,
the steel fixer did not wear uniform and
reflective vest working on site.

Risk:
• Fall from height
• Falling objects

SSN was issued on 24 August 2021


31
3508 – Follow Up Action
Management Actions taken as follows :-

• Works stopped
• Edge protection reinstated as steel fixers had removed the edge protection
that had been erected to accommodate there works.
• Sequence of works reviewed against the on site conditions to ensure that
works are encapsulated within edge protection Safe Working Environment.
• Inspection undertaken with GECCL AAHK safety team and PMR
representative the following day and the SSN revoked.
• Investigation undertaken into who removed the edge and worker was
seriously warned as this endangered both himself and any other working in
the area.
• Subcontractor boss and real guys (steel fixers and carpenters) brought in to
reinforce the key message.
• Discuss and agree the work sequence of both companies
• Supervision in the area has been enhanced
• Briefing to all frontline workers has been conducted

32
Contractors’ Monthly Safety Reports
(3503)

Dismantling of KP/Column, Tie & Bracing at T2 basement


3503 – Dismantling of KP/Column, Tie & bracing at T2 Basement

Before
Date : 2 Sep 2021
Location : L1, T2 Basement

Observation: After
• Submission of Method Statement (MS)
were not completed and did not
address the key safety step from work
sequence in MS before commencement
of the work.

Risk:
• Collapse of steel structure
• Falling object during lifting

Safety Site Notice issued by TRD


34
3503 – Follow Up Action

Management Actions taken as follows :-

• As per the Project Director’s instruction, the concerned site


works had been suspended until the status ‘B’ of construction
method statement approved by AAHK with addressing
requested safety measures.
• Resubmit Method Statement and submit to AAHK for review
• Restart work after getting a Status “A” or B”

35
Contractors’ Monthly Safety Reports
(3503)

Unsafe rigging method for plywood unloading


3503 – Unsafe rigging method for unloading of plywood

Date : 6 Sep 2021


Location : NAB Steel Deck 1

Observation:
The chain slings wasn’t properly wrapped
the bundle of plywood, but the rigger still
instruct the crane operator to lift the load.

The lifting operation was stopped by TRD


immediately.

Risk:
• Falling object
• Struck by slewing load

Safety Site Notice issued by TRD


37
3503 – Follow Up Action

Management Actions taken as follows :-


• JV had immediately arranged and met the Management of the concerned Subcontractor.
• Applied “Just Culture” model and the one-off delivery truck and the concerned Rigger
had been banned to enter our T2 project again.
• Lesson learnt had been shared to all frontline supervision & lifting operatives to bear in
mind – “Don’t Walk By”. Any unsafe act/ condition observed – just raise and stop it.
• JV Rigger assisting the tower crane must conduct all-round checking HIA to confirm safe
with taglines in use before allowing any loading / unloading.
• The safe system of work – lifting plan is valid and the weekly master lifting plan is kept
maintained and communicated to all sections and the client AAHK.

38
Contractors’ Monthly Safety Reports
(3302)

Substandard sheet pile chain sling


derigging sequence
3302 – Substandard unrigging sequence

Date : 03 Aug 2021


Location : 3302/02
Observation:
The sheet pile unhook method are not
complied with the standard procedures.
The unhook action should be taken after
completion of butt weld to splice the upper
and lower sheet pile.

Risk:
Worker maybe hit by insecure sheet pile.

Safety Site Notice issued by TRD

40
3302 : Follow Up Action

Management Actions taken as follows :-


• Review meeting with sub-contractor and
TWC was conducted.
• A simplify pictorial procedure of sheet
piling bundle installation was developed
and displayed on site.
• Specific safety training for the standard
lifting procedures of sheet pile bundle
was provided to foreman and workers.

41
Serious and Fatal Incidents
Lesson Learnt
Lifting Failure : 2 cases
Plant and Equipment : 4 cases (11 fatal)
Fall from Height : 5 cases (2 fatal)
Electrical Shock : 2 cases (2 fatal)
Fire : 1 case
Total : 14 cases

Presented by : Caleb TSANG


Construction Safety Superintendent
Serious Incidents Lesson Learnt
Lifting Failure - 1 case
Sharing of Non-TRD Accident/Incident

Structural Deformation to the Boom of a Crawler Crane (Serious)

Date : 17 August 2021


Location : Hong Kong
Severity : Unknown

Circumstances:
The lattice boom of a crawler crane was
severely twisted and distorted in a foundation
site in Kowloon.

44
Sharing of Non-TRD Accident/Incident

Lorry Crane with Fly Jib Overturned (Serious)

Date : 9 September 2021


Location : Hong Kong
Severity : Unknown

Circumstances:
A crane lorry with fly jib lifting a set of man
basket overturned.

Video

45
Serious Incidents Lesson Learnt
Plant and Equipment - 3 cases (10 fatal)
Sharing of Non-TRD Accident/Incident

Truck-mounted Elevating Work Platform Collapsed (Fatal) Link

Date : 18 August 2021


Location : Sai Wan, Hong Kong
Severity : 1 dead & 1 injured
Circumstances:
Two workers while working on the working
platform of a truck-mounted elevating work
platform (“EWP”) to conduct tree pruning
work, fell together with the working platform
as the boom of the EWP suddenly broke.

One worker died and the other worker was


injured.
Video
47
Sharing of Non-TRD Accident/Incident

Tower Crane Collapsed during Dismantling (Fatal) Link

Date : 26 August 2021


Location : Nairobi, Kenya
Severity : 9 dead & 1 injured
Circumstances:
A group of ten workers were dismantling the
crane and it suddenly collapsed.
Nine workers were crushed to death and
another slightly injured.

Preliminary Findings indicated part of the


giant tower crane collapsed during its
decommissioning.

48
Sharing of Non-TRD Accident/Incident

Thumb Amputated by Angle Grinder (Serious) Link

Date : 30 August 2021


Location : Fo Tan
Severity : 1 injured

Circumstances:
When a worker was operating an angle
grinder, his left thumb was accidentally
amputated by the machine.

The injured was conveyed to hospital for


medical treatment.

49
Sharing of Non-TRD Accident/Incident

Loader fell down the slope (Fatal) Link

Date : 9 September 2021


Location : Yuen Long, Hong Kong
Severity : 1 dead

Circumstances:
The operator fell onto the slope of a pond
together with a crawler loader.

D/P was pressed by the loader to die.

50
Serious Incidents Lesson Learnt
Fall from Height - 5 cases (2 fatal)
Sharing of Non-TRD Accident/Incident

Worker Fell from External Scaffold (Fatal) Link

Date : 9 August 2021


Location : New Taipei City, Taiwan
Severity : 1 dead

Circumstances:
A worker fell to the catchwater nearby from
the 12th floor of a building while working on a
metal scaffold for a building’s exterior
renovation works.

He was pronounced dead at the scene.

52
Sharing of Non-TRD Accident/Incident

Worker Fell from Ceiling (Fatal) Link

Date : 16 August 2021


Location : Taipa, Macau
Severity : 1 dead
Circumstances:
A worker fell to the ground from the scaffold on the
5th floor while he was doing electrical wiring works.
He was found without vital signs when he was
conveyed to hospital for rescue, where he was later
declared dead.
The deceased suffered from open fractures near the
waist, both elbows and ankles. He was also found
wearing a safety harness equipped with buckles.

Video
53
Sharing of Non-TRD Accident/Incident

Worker Injured after Falling from Gantry Link

Date : 17 August 2021


Location : Tsuen Wan, Hong Kong
Severity : 1 injured

Circumstances:
A scaffolder fell down from a 7-metre gantry at
the site entrance.

He was conscious and was conveyed to hospital


for medical treatment with minor injuries.

54
Sharing of Non-TRD Accident/Incident

Worker Fall from metal scaffold (Serious) Link

Date : 20 August 2021


Location : Tai Chung, Taiwan
Severity : 1 injured

Circumstances:
A worker fell from the 2nd floor of the
metal scaffold without guardrails and struck
against the formworks nearby.
The formworks were collapsed and hit onto
the hoarding underneath.
Lacerations on his head and knee was
found.
Video
55
Sharing of Non-TRD Accident/Incident

Worker Fall from Roof (Serious) Link

Date : 26 August 2021


Location : Calgary, Canada
Severity : 1 injured

Circumstances:
A man suffered injuries after falling from the roof
he was working on into the open basement of the
house being built nearby. Firefighters rescued the
man by aerial truck.

I/P was taken to hospital with life-threatening


injuries.

56
Serious Incidents Lesson Learnt
Electric Shock - 2 cases (2 fatal)
Sharing of Non-TRD Accident/Incident
Worker Electrocuted to Death (Fatal) Link

Date : 28 August 2021


Location : Taipei City, Taiwan
Severity : 1 dead

Circumstances:
A worker while working at the residential building
site was suspected to have received a lethal electric
shock.

According to the emergency agencies, I/P was found


without vital signs when he was conveyed to
hospital, where he was later certified dead.

58
Sharing of Non-TRD Accident/Incident

Worker Electrocuted by Overhead Cable (Fatal) Link

Date : 24 August 2021


Location : Prince Williams County, US
Severity : 1 dead
Circumstances:
2 workers were doing shutter cleaning and
repairing at the complex by a boom lift (MEWP).
One of the workers received a fatal electric shock
whilst the cradle of boom lift contacted the
overhead power line.
I worker was killed and another was injured.

59
Serious Incidents Lesson Learnt
Fire - 1 case
Sharing of Non-TRD Accident/Incident

Fire Outbreak at Construction Site Link

Date : 22 August 2021


Location : Yau Ma Tei, Hong Kong
Severity : N/A

Circumstances:
A construction site got fire and generated thick
smoke. Fire Service Department was called to
extinguish the fire.

Fortunately, no one was injured.

Video
61
Safety Messages
from
Labour Department
Safety Highlights

Presented by : Tracy WONG


Construction Safety Superintendent
TRD Highlights
Eye-catching Banners & Facilities for “Beat the Heat”

Risk Mitigated:
Heat Stroke

“Lead Standard” Rating:

3801
CSCE

Provision of Banners, Fans & Refrigerators in Ventilation Building


TRD Highlights
Identification
Skysensor of ELS
Head Crashing RemovalSystem
Detection Sequence
for MEWP

Risk Mitigated:
Contused to strut or beam
while operating MEWP
Moving “Horizontally” “Lead Standard” Rating:
12 Sensors Installed
on the Basket Video 1

3801
CSCE
Buzzer, Signal Light & Moving “Upward”
Over-ride Button
Video 2 Video 3
TRD Highlights
Concrete block at the edge of trench adjacent the carriageway

Risk Mitigated:
- Public vehicle fall to the
trench

“Lead Standard” Rating:

3503
LCWJV
TRD Highlights
Project Safety E-Library with QR code system

Risk Mitigated:
- NA

“Lead Standard” Rating:

3503
LCWJV
TRD Highlights
Provision of Utilities identification and protection
before backfill of trail trench for pre-boring work

Risk Mitigated:
- Damage of utilities

“Lead Standard” Rating:

3508
GECCL
TRD Highlights
Durable LG tag with ID, SWL & Next inspection date

Risk Mitigated:
- Failure of lifting gear

“Lead Standard” Rating:

3508
GECCL
TRD Highlights
Use of scissor platform with Dynamic levelling, Auto-Stabilizing &
Drivable on uneven ground

Risk Mitigated:
- Avoid toppling of
platform

“Lead Standard” Rating:

3508
GECCL

Video
TRD Highlights
Full coverage of Netting to prevent falling objects

Risk Mitigated:
Falling objects

“Lead Standard” Rating:

3403
SFK
TRD Highlights
Salt stick to workers & Facilities for “Beat the Heat”

Risk Mitigated:
Heat stroke

“Lead Standard” Rating:

3403
SFK
Provision of ice maker and distributed salt stick to workers
for beat the heat campaign.
TRD Highlights
On-site display of sheet piling installation procedure

Risk Mitigated:
- Lifting failure
- Falling object

“Lead Standard” Rating:

Safe working procedure of sheet piling bundle installation 3302


was displayed near the related work area. CRBC
TRD Highlights
Enhanced PPI near Area 4’s entrance by gate and barrier

Risk Mitigated:
- Struck by vehicle or
plant

“Lead Standard” Rating:

3302
CRBC
Clear separation of pedestrian walkway and vehicle road.
TRD Highlights
Water bottle souvenir to workers

Risk Mitigated:
- Heat stroke

“Lead Standard” Rating:

With Spray
Distributed water bottle souvenir to workers function
for beat the heat campaign.
3302
CRBC
TRD Highlights
Display the emergency drill banner for fire drill

Risk Mitigated:
- Misleading other parties

“Lead Standard” Rating:

3302
CRBC
TRD Highlights
Protection of Electrical Wire
Electrical wire hung up overhead at site office area

Risk Mitigated:
- Electric Shock
- Tripping hazard

“Lead Standard” Rating:

3306
CAEL
TRD Highlights
Hand Tools Storage Container

Risk Mitigated:
- Slip and Trip

“Lead Standard” Rating:

• Good housekeeping
• Hand tool storage sorting clear 3408
BUCG - CCCL JV
TRD Highlights
Portable Electrical Saw with Residue Collector

Risk Mitigated:
- Slip and Trip
- Dusty environment

“Lead Standard” Rating:

Collect the residue from


the source

3723
TKJV
Safety Promotion

Presented by : Ice WONG


Construction Safety Superintendent
Safety Into Family Video Competition

Cash
$10,000

REMINDER:
TAKE LEAD ON sharing
“Eliminate Big 4” message
to family members

ASP To-do-list:
Important Dates
Display poster
 Submission Closing Date: 30 Sep 2021 Deliver message to frontline
 Result Announcement: 15 Oct 2021 and sub-contractors
 Award Presentation Ceremony: Beginning of Nov 2021 Encourage worker/staff to join
2021 Construction 4 Cell Story Competition
To raise safety awareness, promote
safety behaviour and encourage positive 16 Aug 2021
action for site safety Open for application

Theme
安全健康工作,保障一家生活
Safeguard on Families
by Working Safely
Groups Awards & Prize
Worker Group HK$10,000
Non-worker Group HK$10,000
Student Group Latest Laptop Computer

Scan QR Deadline
Code
For Detail
15 Oct 2021
Incentive Scheme Funding - 360 Degree Camera

Application is in progress

Coming
Soon
Video

360 Camera can apply in Different Plants

Excavator Crawler Crane Crawler Loader Bulldozer


83
Trial Innovative Device – Handbrake Alert System

Video
84
Any Other Business
Quarterly Promotion
2021 Q3 Safety Promotion

2021 Quarterly Promotion


Q3 “Eliminate the Big 4 + Beat the Heat”

Promotional Activities
Distribute Souvenirs
• Cooling Sleeves
• Cooling Towel
• Neck Sunshade Protector

Heat Stroke Prevention Seminar


Virtual Tour of Heat Stroke
Prevention
“Breezy Summer” Safety
Incentive Scheme

86
Safety Promotion
Breezy Summer Incentive Scheme - Cordless Blower
TRD will subsidize HKD $500 per
Cordless Blower at max
Max Application
Quantity: 5

Features:
1. Cordless
2. Diameter of Fan
(8” – 10”)
3. Provision of
Batteries and
Battery Cartridge
87
Safety Promotion
Q3 – Eliminate the Big 4 + Beat the Heat 3.0
Giveaway for Q3

Sun Shading Neck Drape

Virtual Tour: https://my.matterport.com/show/?m=VbCMt1TKR2z Neck Fan +


Safety Quiz: https://zh.surveymonkey.com/r/XFRZXSH Ice-cream Coupon Cooling Towel
88
Any Other Business
COVID-19 Update
VCommit Voluntary COVID-19 Testing Scheme

Scheme Tested Specimen COVID-19


Duration
No. (Qty) Test Result
1.0 4,5,6 and 9 Jan 2021 3986 All Negative
2.0 4 to 6 Feb 2021 1408 1 Positive
3.0 16 to 20 Feb 2021 4066 All Negative
4.0 3 to 5 March 2021 4465 1 Positive
5.0 - 10.0 18 March to 27 May 2021 32780 7639 (Truck) All Negative
25141 (DTS)
11.0 7 to 10 June 2021 5,236 1,271(truck) All Negative
3,965 (DTS)
12.0 21 to 24 June 2021 4,765 1,49(truck) All Negative
3,616 (DTS)
1,129 (truck)
13.0 5 to 8 July 2021 4,477 All Negative
3,348 (DTS)
1,106 (truck)
14.0 19 to 22 July 2021 3,846 All Negative
2,740 (DTS)
954 (truck)
15.0 2 to 6 Aug 2021 3,434 All Negative
2,480 (DTS)
1,332 (truck)
16.0 13 to 19 Aug 2021 3,566 All Negative
2,234 (DTS)
1,290 (Truck)
17.0 27 Aug to 2 Sept 2021 3,083 All Negative
1,793 (DTS)

Total 75,066 2 Positive

Scheme 18.0 : 10 to 16 September 2021


90
VCommit Voluntary COVID-19 Testing Scheme
Testing Trucks since 12.0 / 13.0 / 14.0 / 15.0 / 16.0
T2 (3508) RPSO T2 (3503)

T2 (3508) RPSO T2 (3503)

91
VCommit Voluntary COVID-19 Testing Scheme

Designated DTS Specimen Bottles at 3RS Collection Point


Reclaimed Land - East Site Area Reclaimed Land - West Site Area HKIACOM (AWTC)

LPSO T2 (SAB)

92
VCommit Voluntary COVID-19 Testing Scheme
❤️ 3RS VCommit Program COVID-19 Free of Charge Testing Scheme ❤️
For All Persons Working on 3RS

IMPORTANT NOTE

In scheme 17.0, we have collected 3,083 specimens but


with 0.6 % (21) Unstable / Unsuitable Result.

Cause of Unstable Results


 Leakage (Bottle Cap not tightened enough)
\

DON’T Take Saliva Specimen after brushing or


after drinking or after eating.

93
VCommit Voluntary COVID-19 Testing Scheme
Post 1 Oct 2021 Free Testing Arrangement
Every 14 Days - Free DTS Testing
For Staff / Worker with ARA Permit who are
vaccinated and need to work on Airside
2 collection points only

No CNTS Swab Testing Truck

T2 (SAB) LPSO

94
COVID-19 GET VACCINATION
❤️ 3RS VCommit Program COVID-19 ❤️
GET VACCINATION

95
Summary of VISA
Overall Rating & Planning of VISA (Aug-Sep2021)

Contract No. Contractor Assessment Date Focused Area Overall Rating

3801 China State 11 Aug 2021 ELS Dismantling YL


Vehicle Maintenance
3906 L99 Wai Ming 18 Aug 2021
Operation G

3802 GECCL 25 Aug 2021 Bored Pile Construction YH

3307 Paul Y 1 Sept 2021 Lifting and PPI YL

3408 BUCG-CCCL JV 8 Sept 2021 Safety Management System G

3602 Niigata Transys 16 Sept 2021 Safety Management System TBC


Any Other Business
A.O.B
Remember ...

Every Accident is Preventable


Our Goal is

ZERO
“Safety is Everybody’s