NO Equpiment/Process flow line/Valves Name need to be painted
1 FIRE pump house door
2 RAW water pump-1,2 RAW water STORAGE TANK 3 MAK Tank- 1&2 4 MHL and DHL TANK- 1&2 5 Degasser Tank,pumps ,Blower Names 6 UF system-1,2 7 N-pit pump-1,2 DM and UF storage tank 8 BLR-9 ID fan 1&2 both cooler 9 BLR_9 fd fan -1&2 10 Burner numbering in BLR-10 11 CBD inching MIV 12 BLR-10 feed water isolation MIV 13 ACW pump 14 0mtr air washer pump 15 22 mtr Air washer pump 16 All CT riser cell 17 AVR room AC numbering 18 19 20 21 22