CADD Station Technologies PVT LTD., ILC Planning: Cement

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

CADD station Technologies pvt Ltd.

,
ILC Planning

CEMENT

Setting time
Initial, Fineness of Soundness of
Consistency of Setting time cement by dry cement by Le Compressive
Parameters Cement Final sieving Chartlier Strength
18-Mar √ √ √ √ √
19-Mar √ √
20-Mar √ √
21-Mar √
Fine Aggregates

Water Unit weight &


Parameters Gradation Specific gravity absorbtion voids Bulk Density
18-Mar √ √ √ √ √
19-Mar √ √ √ √
20-Mar √ √ √
21-Mar √ √ √

Coase Aggregets

Unit weight &


Elongation Water Aggregate voids (Bulk
Parameters Gradation Flakiness Index Index Specific gravity absorption Impact value Density)
18-Mar √ √ √ √ √ √ √
19-Mar √ √
20-Mar √ √ √
21-Mar √ √ √

BITUMEN

Parameters Penetration Ductility Flash Point Fire point Softening point


18-Mar √ √ √ √ √
19-Mar √
20-Mar
21-Mar √ √ √ √ √

Concrete Cubes

Compressive Compressive
Parameters strength cubes strength cubes
18-Sep √
19-Sep √
20-Sep √
21-Sep √

Prepared by : Approved By
ILC/PT Planning
Ambient Monitoring

Nitrogen Particulate Particulate Sulphur Ambient


Parameters Dioxide Matter 10 Matter 2.5 Dioxide Noise
13-Nov √
14-Nov √
15-Nov

Stack Monitoring

Velocity & Dust


Volume of flue Particulate Particulate Oxides of Sulphur
Parameters gas matter Emission Nitrogen Dioxide
13-Nov √
14-Nov √
15-Nov

Prepared by :