REMAINING RECTIFICATION WORKS @ BGHMC

A. TRAUMA CENTER PHASE 1


 Elevator shafts
o Tie rod PVC holes (patching works)
o Surface alignment (inside shaft)
o Leaks (foundation to basement floor)
o Uneven openings
o Surface prep for finishing (cleaning of concrete and removal of
stuck forms)
 Cistern tank (@ secondary domestic water tank)
o Rectification at secondary domestic water tank leaks
o Finishing of Trench (prep to receive trench grating)
 Stairs to pump room
o Leaks at stairs
 Basement parking (Slab on grade)
o Leaks and cracks
 Ground Floor (Gridlines 1-2)
o Uneven slab finish at GF entrance to basement parking.
 Genset Room (Powerhouse – separate structure)
o Floor finish must be smooth (epoxy)
o Final coat of truss paint
B. TRAUMA CENTER PHASE 2
 Basement Parking
o SOG Cracks
o Rectification of Scaling
o Repair of Paint markings
 Basement heat pump rooms & storages
o Scaling of paint/floor finish repair
 Stairs (Basement to GF, and GF to 2F
o Removal of stuck formworks
C. MULTI-SPECIALTY CENTER PHASE 1
 Cistern Tank leak testing and rectification
 Cafeteria (Lower Ground Floor)
o Siding and beam bottom alignment
o Column and Retaining Wall alignment
 Elevator shafts
o Tie rod PVC holes (patching works)
o Surface alignment (inside and outside shaft)
o Leaks (foundation to basement floor)
o Uneven openings
o Surface prep for finishing (cleaning of concrete and removal of
stuck forms)
 Ground floor to 3rd floor beams and columns
o Beam bottom alignment
o Column and Retaining Wall alignment (inside)
o Patching of tie rod holes
o Removal of stuck formworks/tie wires
 Ground Floor Slab
o Concreting of manholes left for material access into cistern
tanks.