Laporan Reliability PLTD Suppa - Juli 2021
Laporan Reliability PLTD Suppa - Juli 2021
Laporan Reliability PLTD Suppa - Juli 2021
01
SIAP INTEGRATED MANAGEMENT SYSTEM Tgl Terbit 8/1/2017
Revisi 00
RESUME PKU DAN CHRONIC PROBLEM UNIT PLTD SUPPA
Halaman 01
Status PKU Inputan Tindak Lanjut Keterangan
KKS 2021 Work Order (WO) PLO Action Plan PIC Time
No Equipment Identifikasi Prioritas
Keterangan WO No Status PdM LK3 Keterangan MWH Loss
Juli Agu Sep Okt Nov Des
REKONDISI ON GOING
Main Diesel Engine Stationary Unit 1 SP10MJA01HA001 4 REKONDISI CYLINDER HEAD EX OVERHAUL 72000 JAM 3757 OPEN - - - - CM NI MEK 21/2/2020
5435 OPEN SERVICE INST 25/4/2021 ON GOING
SENSOR FAULT ALARM MV SWITCHGEAR BUSBAR #1
High Temperature Cooling Water Pump 1 SP10MJA01AP001 5 COULING HT MESIN #1 BOCOR 5693 CLOSED - - - - CM NI SERVICE MEK 6/7/2021 ON GOING
BAP 011 Central Control Panel Genset Unit 1 SP10MKY01GH002 5 LAMPU INDIKASI PANEL 011, 021, 041 & 051 TIDAK MENYALA 5750 OPEN - - - - CM NI SERVICE INSTRUMENT OPEN ON GOING
Generator Exciter Unit 1 SP10MKC01 5
Generator Exciter Cubicle Unit 1 SP10MKC01GU001 5
1. ELECTRICAL ANNEX MESIN #4 INDIKASI ABNORMAL SOUND 5175 CLOSED SERVICE ELEK 2/4/2021 SELESAI 2/4/2021
Main Diesel Engine Bearing Assembly Unit 4 SP40MJA01HD001 4 2. REPAINITNG PEREMAJAAN PEWARNAAN DI MAIN ENGINE 5194 OPEN - - - - CM NI REPAINTING MEK 2/8/2021 ON GOING
3. RCFA MESIN #4 TRIP AKIBAT WATER INLET HIGH TEMPERATURE 5196 CLOSED PEMBUATAN LAPORAN ENG 2/9/2021 SELESAI / 29/2021
400 VAC Distribution Panel (NE1 + NE1 + NE2) for Switchyard SP00BAY08GH001 5
Reverse Ormosis System (E.G. For Carbonate Hardness Removal) SP00GBF 1 1 1 1 1 1 SUDAH TIDAK DIGUNAKAN
Working Air Dryer No 3 SP00QFA20AT004 4 SCREW AIR COMPRESSOR FILTER AIR DRYER RUSAK 5567 OPEN - - - - CM NI SERVICE MEK 3/6/2021 ON GOING
Working Air Compressor SP00QFA20AN001 5
Working Air Oil / Water Separator SP00QFA20CL001 5
Working Air Vessel SP00QFA20BB001 5
Compressed Air Control Panel SP00QFA20GH001 5
5
Exhaust Gas Boiler 2 SP00QHA81BR002
Light Fuel Oil Fired Boiler System (Auxiliary Boiler) SP00QHA50 1 KERUSAKAN PLC LFO BOILER PADA SEMESTER 1 2018
FAN DALAM PANEL 02/03 KONDISI MATI 5300 OPEN SERVICE INST 22/3/2021 ON GOING
Separator Tank V.114 SP00GMB20BB001 4 - - - - CM NI
POMPA DIAGFRAGMA PUMP AREA FOPX FUEL TREATMENT 5379 CLOSED SERVICE MEK 14/4/2021 SELESAI / 14 - 4 - 2021
Fire Fighting Pump (Electrical Driven) P.432-2 SP00SGA11AP002 5 KACA HMR TIDAK JELAS PENUNJUKAN TIDAK JELAS 5807 CLOSED - - - - CM NI SERVICE INST 30/7/2021 SELESAI / 30 - 7 - 2021
5
Fire Fighting Jockey Pump Suction Strainer S.432-2 SP00SGA11AT003
Very Early Smoke Detector Alarm (VESDA) System in MV & LV cubicles, SP00SGA21CD001 5
DG Control Panel & Iine underground cable trenches in control building SP00SGA21CD002 5
Low Voltage Station Switchgear (Power House) SP00ANE10GS001 4 FAN DALAM PANEL CIRCULATION PUMP KONDISI MATI 5299 OPEN - - - - CM NI SERVICE INST 22/3/2021 ON GOING
5
150kV Metering Panel A (E00+X2 & E00+X3) SP00AQA01GH001
Multi-function Electronic Meter No 1 SP00AQA01GK001 5
Multi-function Electronic Meter No 2 SP00AQA01GK002 5
CB's; door switches SP00AQA01GS001 5
UPS No 1 SP00AQA01GY001 5
5227
CCTV MESIN #1 KONDISI BLANK TIDAK BISA MONITOR PARAMETER DI MESIN 5230 SERVICE INST 19/2/2021 ON GOING
CCCTV MESIN #5 KONDISI BLANK TIDAK BISA MONITOR PARAMETER DI MESIN 5345 OPEN SERVICE INST 22/2/2021 SELESAI / 22 - 2 - 2021
5526
LAMPU INDIKASI CONTROL PANEL BAP 011 MENYALA SECARA BERSAMAAN INDIKASI KORSLET CLOSED SERVICE INST 8/4/2021 SELESAI / 16 - 4 - 2021
5638
Power Line Carrier System ESB 2000i SP00AYB01EB001 4 CCTV MESIN #4 KONDISI BLANK TIDAK BISA MEMONITOR AREA MESIN ADAPTOR RUSAK
5641
CLOSED - - - - CM NI SERVICE ELEK 18/5/2021 SELESAI / 18 - 5 - 2021
CCTV AREA POWER HOUSE VISUAL TIDAK NORMAL OPEN SERVICE INST 22/6/2021 SELESAI / 23 - 6 - 2021
BATTRASI HT MOTOROLLA GP 3188 5694 CLOSED SERVICE INST 23/6/2021 ON GOING
CCTV UNDERGROUND ABNORMAL TIDAK BISA MEMONITOR CLOSED SERVICE INST 6/7/2021 SELESAI / 7 - 7 - 2021
Structures SP00U 5
Structures Of Grid And Distribution Systems Electrical System High Voltage SP00UA 5
High Voltage Switchyard SP00UAA 5
Transformer Bay E01 SP00UAA01 5
Three phase bus sections SP00UAA01GD001 5
Three phase bus disconnectors SP00UAA01GD002 5
Three phase circuit breakers gas type SP00UAA01GS001 5
Three phase surge arresters SP00UAA01GZ001 5
Three phase current and voltage transformers SP00UAA01GT001 5
for protection and measurement
Three phase current and voltage transformers for protection and measurment SP00UAA04GT001 5
Line traps fitted on voltage transformer for plc communication. SP00UAA04GC001 5
3546
1. LAMPU PENERANGAN DI PLTD SUPPA AGAR KIRANYA LAMPU PENERNAGAN DI GANTI SESUAI 5212 OPEN SERVICE ELEK 2/1/2020 ON GOING
2. PC WOIS CCR TIDAK BISA MEMONIT AKIBATBACK UP UPS RUSAK OPEN SERVICE 15/2/2021 ON GOING
3. MONITOR SPM TURBOCHARGING TIDAK BISA MEMONITOR TRENDING GRAFIK VIBRASI 5213 CLOSED SERVICE INST 15/2/2021 SELESAI / 26 - 2 - 2021
Supervision Computer & Acessories No 1 SP00ZAA01KB001 4 4. MONITORING OPERATOR CCR WOIS KONDISI BLANK 5214 CLOSED - - - - CM NI SERVICE INST 15/2/2021 SELESAI / 18 - 3 - 2021
5308 INST
5. PEMASANGAN AC SPLIT DI RUANGAN OFFICE 8 PEACES 5659 CLOSED PEMASANGAN AC UMUM 26/3/2021 SELESAI / 18 - 5 - 2021
6. SERVICE COMPUTER / PC SUPERVISOR ELEKTRIK OPEN SERVICE 29/6/2021 ON GOING
INST
Trending Unit 1
Supervision Computer & Acessories No 2 SP00ZAA01KB002 5
100
4
50 1%
Reporting Computer SP00ZAA01KB003 5 LINE KABEL AREA DOMESTIK PUMP KANTIN KORSLET ADA PERCIKAN BUNGA API 5744 CLOSED - - 0 - - CMNOV NI SERVICE ELEK 14/7/2021 SELESAI / 14 - 7 - 2021
JUL AGU SEP OKT DES
JUMLAH
Trending Unit 5
4
Plant Drains Streatment System (Waste Water Treatment) SP00GN 5 100 1%
80
Plant Site Oil Containment System (Filtering, Mechanical Cleaning System) SP00GNB 5 50
60
Oil/Water Separator System SP00GNB10 5 40
0
Oil/Water Separator SP00GNB10AT001 5 20 JUL AGU SEP OKT NOV DES
Oil/Water Pre-interceptor System SP00GNB10AT002 5 0 JUMLAH
Lot Regulation and By-pass Chamber SP00GNB10BB001 5 5
BREAKDOWN STANDBY FAULT Unit
Unit 5599%
(Juli)
(Juni)
Flow regulator SP00GNB10BP001 5 ALARM NORMAL BREAKDOWN STANDBY FAULT
Break Partition SP00GNB10BP002 5 ALARM 1 2 NORMAL
3 4 5
Trending
Trending Unit
Unit66
Coalescent Filters SP00GNB11 5
100
Coalescent Filters No 1 SP00GNB11AT001 5 80
80
Coalescent Filters No 2 SP00GNB11AT002 5 60
40
Coalescent Filters No 3 SP00GNB11AT003 5 40
Coalescent Filters No 4 SP00GNB11AT004 5 200 JUL AGU SEP OKT NOV DES
Coalescent Filters No 5 SP00GNB11AT005 5 0 JUMLAH 5
100%
BREAKDOWN
BREAKDOWN STANDBY
STANDBY FAULT
FAULT Unit 6 (Juli)
(Juni)
Obturation Device 1 SP00GNB12 5 ALARM
ALARM NORMAL
NORMAL BREAKDOWN STANDBY FAULT
Lot Instrumentation System for measurement 1 SP00GNB12DF001 5 ALARM 1 2 NORMAL
3 4 5
Trending Unit Common
Regulation and By-pass Chamber SP00GNB13 5 800
800 1 4
Flow regulator SP00GNB13CF001 5 700 3% 1%
700
600
600
500
500
400
400
300 BREAKDO
300 WN
200
200 100%
100 5
100
0 Unit Common
95% (Juli)
(Juni)
0 BREAKDOWN STANDBY FAULT
JUL AGU SEP OKT NOV DES 1
ALARM 2 NORMAL
3 4 5
JUMLAH
Ambulance SP00FL30 5
Pick Up SP00FL40 5
*Prioritas :
1. Berpengaruh langsung pada kemampuan Produksi Listrik (PLO)
2. Segera dieksekusi dalam waktu dekat
3. Dapat dieksekusi saat OH
* Chronic Problem :
Permasalahan berulang yang berpengaruh pada proses produksi listrik
UNIT 1
JUMLAH
STATUS
JUL AGU SEP OKT NOV DES
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 1 0 0 0 0 0
5 NORMAL 85 0 0 0 0 0
UNIT 2
JUMLAH
STATUS
JUL AGU SEP OKT NOV DES
1 BREAKDOWN 2 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 0 0 0 0 0 0
5 NORMAL 85 0 0 0 0 0
UNIT 3
JUMLAH
STATUS
JUL AGU SEP OKT NOV DES
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 2 0 0 0 0 0
5 NORMAL 83 0 0 0 0 0
UNIT 4
JUMLAH
STATUS
JUL AGU SEP OKT NOV DES
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 2 0 0 0 0 0
5 NORMAL 80 0 0 0 0 0
UNIT 5
JUMLAH
STATUS
JUL AGU SEP OKT NOV DES
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 1 0 0 0 0 0
5 NORMAL 84 0 0 0 0 0
UNIT 6
JUMLAH
STATUS
JUL AGU SEP OKT NOV DES
1 BREAKDOWN 0 0 0 0 0 0
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 0 0 0 0 0 0
5 NORMAL 85 0 0 0 0 0
UNIT COMMON
JUMLAH
STATUS
JUL AGU SEP OKT NOV DES
1 BREAKDOWN 24 23 23 23 23 23
2 STANDBY 0 0 0 0 0 0
3 FAULT 0 0 0 0 0 0
4 ALARM 9 0 0 0 0 0
5 NORMAL 679 0 0 0 0 0
PT PEMBANGKITAN JAWA BAL
SIAP INTEGRATED MANAGEME
MONITORING REKOMENDA
DGA
DGA Normal
Status Jumlah Prosentase Normal
Alarm
Normal 3 75% 25%
25% High Alert
Alarm
Alarm 1 25% Breakdown
75%
75% High Alert
High Alert 0 0%
Breakdown 0 0% Breakdown
Total 4 100%
Transformator
Thermography -
MCA -
Operasi 4 Kondisi Normal
1.Nilai TDCG kondisi 1 (normal)
2.Rasio CO2/CO masih normal 4.8
DGA 3
3. Gas CO masuk kondisi 3 dan gas
Auxilary Transformer No.2 CO2 masuk kondisi 3
4
T.322
Thermography -
MCA -
Operasi 4 Kondisi Normal
Main Diesel Engine
Vibrasi
1. Dilakukan pengambilan data
tekanan pembakaran atau peak
1. Pressure
pressure sesuai dengan firing order
2. Exhasut Gas 4
2. Pengambilan data di saluran buang
Manifold
exhaust gas manifold setiap cylinder
5 Main Diesel Engine #1 head
Oil Analysis
Vibrasi
1. Dilakukan pengambilan data
tekanan pembakaran atau peak
1. Pressure
pressure sesuai dengan firing order
2. Exhasut Gas 4
2. Pengambilan data di saluran buang
Manifold
exhaust gas manifold setiap cylinder
head
Vibrasi
1. Dilakukan pengambilan data
tekanan pembakaran atau peak
1. Pressure
pressure sesuai dengan firing order
2. Exhasut Gas 4
2. Pengambilan data di saluran buang
Manifold
exhaust gas manifold setiap cylinder
head
Oil Analysis
Vibrasi
Oil Analysis
Turbocharger
Vibrasi
11 Turbocharger Bank A #1 Oil Analysis
Operasi
Vibrasi
12 Turbocharger Bank B #1 Oil Analysis
Operasi
Vibrasi
13 Turbocharger Bank A #2 Oil Analysis
Operasi
Kerusakan Komponen Peralatan
Vibrasi 1
ABB Turbocharger
14 Turbocharger Bank B #2 Oil Analysis 1 Kerusakan Komponen Peralatan
ABB Turbocharger
Kerusakan Komponen Peralatan
Operasi 1
ABB Turbocharger
Vibrasi
15 Turbocharger Bank A #3 Oil Analysis
Operasi
Vibrasi
16 Turbocharger Bank B #3 Oil Analysis
Operasi
Vibrasi
17 Turbocharger Bank A #4 Oil Analysis
Operasi
Vibrasi
18 Turbocharger Bank B #4 Oil Analysis
Operasi
Vibrasi
19 Turbocharger Bank A #5 Oil Analysis
Operasi
Vibrasi
20 Turbocharger Bank B #5 Oil Analysis
Operasi
Vibrasi
21 Turbocharger Bank A #6 Oil Analysis
Operasi
Vibrasi
22 Turbocharger Bank B #6 Oil Analysis
Operasi
Compressed Air System
Vibrasi
Starting Air Compressor Thermography
23
No.1 MCA
Operasi
Vibrasi
Starting Air Compressor Thermography
24
No.2 MCA
Operasi
Vibrasi
Thermography
25 Working Air Compressor
MCA
Operasi
Vibrasi
Thermography
26 Control Air Compressor
MCA
Operasi
Vibrasi
Thermography
27 Screw Air Compressor
MCA
Operasi
Fuel System
LFO Unloading Unit
Vibrasi
Thermography
28 LFO Unloading Pump No.1
MCA
Operasi
Vibrasi
Thermography
29 LFO Unloading Pump No.2
MCA
Operasi
LFO Feeder Unit
Vibrasi
Thermography
30 LFO Feeder Pump No.1
MCA
Operasi
Vibrasi
Thermography
31 LFO Feeder Pump No.2
MCA
Operasi
HFO Unloading Unit
Vibrasi
Thermography
32 HFO Unloading Pump No.1
MCA
Operasi
Vibrasi
Thermography
33 HFO Unloading Pump No.2
MCA
Operasi
HFO Transfer Unit
Vibrasi
Thermography
34 HFO Transfer Pump No. 1
MCA
Operasi
Vibrasi
Thermography
35 HFO Transfer Pump No. 2
MCA
Operasi
HFO Feeder Unit
Vibrasi
Thermography
36 HFO Feeder Pump No.1
MCA
Operasi
Vibrasi
Thermography
37 HFO Feeder Pump No.2
MCA
Operasi
Fuel Oil Booster Unit
Vibrasi
Fuel Oil Booster Circulation Thermography
38
Pump No.1 #1 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
39
Pump No.2 #1 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
40
Pump No.1 #2 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
41
Pump No.2 #2 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
42
Pump No.1 #3 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
43
Pump No.2 #3 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
44
Pump No.1 #4 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
45
Pump No.2 #4 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
46
Pump No.1 #5 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
47
Pump No.2 #5 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
48
Pump No.1 #6 MCA
Operasi
Vibrasi
Fuel Oil Booster Circulation Thermography
49
Pump No.2 #6 MCA
Operasi
Main Fuel Oil Unit
Vibrasi
High Temperature Pre- Thermography
50
Heating Pump MCA
Operasi
Vibrasi
Fuel Oil Leakage Transfer Thermography
51
Pump No.1 MCA
Operasi
Vibrasi
Fuel Oil Leakage Transfer Thermography
52
Pump No.2 MCA
Operasi
HFO Separator Unit
Vibrasi
Thermography
53 FOPX Supply Pump #1
MCA
Operasi
Vibrasi
Thermography
54 FOPX Motor Separator #1
MCA
Operasi
Vibrasi
Thermography
55 FOPX Supply Pump #2
MCA
Operasi
Vibrasi
Thermography
56 FOPX Motor Separator #2
MCA
Operasi
Vibrasi
Thermography
57 FOPX Supply Pump #3
MCA
Operasi
Vibrasi
Thermography
58 FOPX Motor Separator #3
MCA
Operasi
Lube Oil System
Lube Oil Separator Unit
Vibrasi
Thermography
59 LOP Supply Pump #1
MCA
Operasi
Vibrasi
Thermography
60 FOPX Motor Separator #1
MCA
Operasi
Vibrasi
Thermography
61 LOP Supply Pump #2
MCA
Operasi
Vibrasi
Thermography
62 FOPX Motor Separator #2
MCA
Operasi
Vibrasi
Thermography
63 LOP Supply Pump #3
MCA
Operasi
Vibrasi
Thermography
64 FOPX Motor Separator #3
MCA
Operasi
Vibrasi
Thermography
65 LOP Supply Pump #4
65 LOP Supply Pump #4
MCA
Operasi
Vibrasi
Thermography
66 FOPX Motor Separator #4
MCA
Operasi
Vibrasi
Thermography
67 LOP Supply Pump #5
MCA
Operasi
Vibrasi
Thermography
68 FOPX Motor Separator #5
MCA
Operasi
Vibrasi
Thermography
69 LOP Supply Pump #6
MCA
Operasi
Vibrasi
Thermography
70 FOPX Motor Separator #5
MCA
Operasi
Lube Oil Unloading Unit
Vibrasi
Thermography
71 LO Unloading Pump
MCA
Operasi
Fresh Lube Oil Transfer
Unit
Vibrasi
Fresh Lube Oil Transfer Thermography
72
Pump MCA
Operasi
Used Lube Oil Transfer Unit
Vibrasi
Used Lube Oil Transfer Thermography
73
Pump MCA
Operasi
Lube Oil Maintenance Unit
Vibrasi
Lube Oil Maintenance Thermography
74
Pump MCA
Operasi
Main Lube Oil Unit
Vibrasi
Thermography
75 Pre Lube Oil Pump #1
MCA
Operasi
Vibrasi
Thermography
76 Pre Lube Oil Pump #2
MCA
76 Pre Lube Oil Pump #2
Operasi
Vibrasi
Thermography
77 Pre Lube Oil Pump #3
MCA
Operasi
Vibrasi
Thermography
78 Pre Lube Oil Pump #4
MCA
Operasi
Vibrasi
Thermography
79 Pre Lube Oil Pump #5
MCA
Operasi
Vibrasi
Thermography
80 Pre Lube Oil Pump #6
MCA
Operasi
PT PEMBANGKITAN JAWA BALI SERVICES No. Dokumen : FM-SP-4.2.3.01
SIAP INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 06/04/2018
Revisi : 00
MONITORING REKOMENDASI PDM
Halaman : 01
A
Normal
Normal
Alarm
High Alert
Alarm
Breakdown
High Alert
Breakdown
: 01
Evaluation
Kondisi
2Nd Overall
Month
4
4
4
4
4
1
4
4
4
4
4
4
4
4
4
4
4
No WO No KKS
1 00005673 SP00SGA11AP004
00005674 SP10EGA12AT002
2 00005675 SP20EGA12AT002
3 00005676 SP30EGA12AT002
4 00005677 SP40EGA12AT002
5 00005678 SP50EGA12AT002
6 00005679 SP60EGA12AT002
7 00005680 SP00XJA10AV001
8 00005681 SP00UAA
9 00005682 SP00GMB70AP001
10 00005683 SP00QEA10AN001
11 00005684 SP00QEA10AN002
12 00005685 SP00QFA20AN001
13 00005686 SP00XJA
14 00005687 SP10MKY01GH003
15 00005688 SP20MKY01GH003
16 00005689 SP30MKY01GH003
17 00005690 SP40MKY01GH003
18 00005691 SP50MKY01GH003
19 00005692 SP60MKY01GH003
20 00005693 SP10MJA01AP001
21 00005694 SP00AYB01EB001
22 00005695 SP10MJA01AP001
23 00005696 SP10MJA01AP002
24 00005697 SP00QHE10AP001
25 00005698 SP60EGA12AT002
26 00005699 SP00SMB10AE001
27 00005700 SP10EGA10
28 00005701 SP20EGA10
29 00005702 SP30EGA10
30 00005703 SP40EGA10
31 00005704 SP50EGA10
32 00005705 SP60EGA10
33 00005706 SP00SGA11AT001
34 00005707 SP00SGA11AT002
35 00005708 SP10MJA01HA001
36 00005709 SP20MJA01HA001
37 00005710 SP30MJA01HA001
38 00005711 SP40MJA01HA001
39 00005712 SP50MJA01HA001
40 00005713 SP60MJA01HA001
41 00005714 SP00BTX02GW002
42 00005715 SP00BTX03GW002
43 00005716 SP00BTX05GW001
44 00005717 SP00BTX02GW001
45 00005718 SP00UAA
46 00005719 SP00EGA03AP001
47 00005720 SP00EGA03AP002
48 00005721 SP00EGA03AP003
49
50 00005722 SP00PAC15BB003
51 00005723 SP10EGA08AP005
52 00005724 SP20EGA08AP005
53 00005725 SP30EGA08AP005
54 00005726 SP40EGA08AP005
55 00005727 SP50EGA08AP005
56 00005728 SP60EGA08AP005
57 00005729 SP00QHA30AT001
58 00005730 SP00QHA30AT002
59 00005731 SP00EGA08AP003
60 00005732 SP10MJA01
61 00005733 SP20MJA01
62 00005734 SP30MJA01
63 00005735 SP40MJA01
64 00005736 SP50MJA01
65 00005737 SP60MJA01
66
67 00005738 SP10MJA01AN001
68 00005739 SP20MJA01AN001
69 00005740 SP30MJA01AN001
70 00005741 SP40MJA01AN001
71 00005742 SP50MJA01AN001
72 00005743 SP60MJA01AN001
73 00005744 SP00ZAA01KB003
74 00005745 SP10MJA01HB001
75 00005746 SP40MJA01HB001
76 00005747 SP50MJA01HB001
77 00005748 SP60MJA01HB001
78 00005749
79 00005750 SP10MKY01GH002
80 00005751 SP00UAA
81 00005752 SP00QEA10AN001
82 00005753 SP00QEA10AN002
83 00005754 SP00QFA20AN001
84 00005755 SP00QHA10AP001
85 00005756 SP00QHA10AP002
86 00005757 SP00EGA08AP002
87 00005758 SP00EGA07AP001
88 00005759 SP00EGA07AP002
89 00005760 SP00QHA81BR001
90 00005761 SP00QHA81BR002
91 00005762 SP00SAA10GH001
92 00005763 SP00SAA30GH001
93 00005764 SP00SMB10AE001
94 00005765 SP00SMC10AE001
95 00005766 SP00GMB10AP001
96 00005767 SP00GMB10AP002
97 00005768 SP00GMB12AP001
98
99 00005769 SP00UAA
117 00005787
100%
Flushing of Operation
Mekanik Check Friction Pad
Flushing of Operation
Mekanik Check Friction Pad
Flushing of Operation
Mekanik Check Friction Pad
Flushing of Operation
Mekanik Check Friction Pad
Elektrik
Flushing of Operation
Mekanik Check Friction Pad
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
Closed Selesai
CLosed Selesai
P
S
LAPORAN RE
Monitoring Kon
Kondisi
No Location System / Equipment Dampak
Keterangan Status
Aset rusak berat
- APAR ada (powder dan foam)
Generator Extreme Risk (tidak dapat
- Hydrant ada (Hose Reel)
digunakan lagi)
Power House
Kerusakan aset
dapat diperbaiki
Auxilary - APAR ada (powder) Low Risk
dengan FLM dan
PM
Power House - APAR ada (powder) Kerusakan aset
Radiator Moderate
- Smoke Detector ada moderate
Kerusakan aset
dapat diperbaiki
Depan Powerhouse - Fire Cabinet ada Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Belakang Powerhouse - Fire Cabinet ada Low Risk
dengan FLM dan
PM
Kerusakan aset
- Vesda Alarm MV
dapat diperbaiki
Koridor - Vesda Alarm CR Low Risk
dengan FLM dan
- Vesda Alarm LV
PM
Kerusakan aset
dapat diperbaiki
Under Koridor Low Risk
dengan FLM dan
PM
- Smoke Detector ada
Kerusakan aset
- Hydrant ada (Hose Reel) dapat diperbaiki
Main Exit Low Risk
- Exit Lamp ada dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Gudang Logistik Luar - APAR ada (powder) Low Risk
dengan FLM dan
PM
Kerusakan aset
- APAR ada (powder)
dapat diperbaiki
Gudang Sparepart I - Smoke Detector ada Low Risk
dengan FLM dan
- Manual Call Point ada PM
Kerusakan aset
- APAR ada (powder)
dapat diperbaiki
Gudang Sparepart II - Smoke Detector ada Low Risk
dengan FLM dan
- Manual Call Point ada
PM
Kerusakan aset
Gudang Sparepart - APAR ada (CO2) Low Risk dapat diperbaiki
Elektrik - Smoke Detector ada dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Fast Moving Warehouse - Hydrant ada (Hose Reel) Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Grinding Machine - APAR ada (powder) Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Tool Keeper Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Special Tool Room - Smoke Detector ada Low Risk dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Supervisor Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Instrument Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
Locker Room - Smoke Detector ada Low Risk dapat diperbaiki
- Manual Call Point Ada dengan FLM dan
PM
Kerusakan aset
Washing Machine - Smoke Detector ada Moderate
moderate
Kerusakan aset
dapat diperbaiki
Archive Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
Meeting Room - Smoke Detector ada Low Risk dapat diperbaiki
dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Manager Room - Smoke Detector ada Low Risk dengan FLM dan
PM
Kerusakan aset
Office Operation and dapat diperbaiki
Maintenance Room - Smoke Detector ada Low Risk dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
Admin Room - Smoke Detector ada Low Risk
dengan FLM dan
PM
Kerusakan aset
- Smoke Detector ada dapat diperbaiki
Kitchen Low Risk
- Manual Call Point ada dengan FLM dan
PM
Kerusakan aset
- APAR ada (foam) dapat diperbaiki
Emergency Exit Area Low Risk
- Exit Lamp ada dengan FLM dan
PM
Kerusakan aset
Loading - Unloading dapat diperbaiki
- APAR ada (powder) Low Risk
Area dengan FLM dan
PM
Kerusakan aset
dapat diperbaiki
TPS LB3 - APAR ada (powder) Low Risk
dengan FLM dan
PM
56%
13%
Status
PT PEMBANGKITAN
SIAP INTEGRATED M
MONITORING RCFA DA
Awal kerusakan LFO Boiler pada Tanggal 13 April 2018 dan dilakukan
Pengecekan dari Tim PJBS Unit Kendari untuk Inspeksi dan awal analisa SP00QHA50
pada Sistem PLC Instrument LFO Fired Boiler
Perbaikan CBA dan Review untuk RCFA Kerusakan PLC pada SP00QHA50
LFO Auxiliarry Fired Boiler Unit Sejak dari Tahun 2018
* Dilakukan pengelasan
pada tanki dengan
menggunakan filler
Indikasi Kerusakan disebabkan elektroda yang sesuai
karena tanki hot whell sudah mulai dengan materila yaitu cast * selesai
kropos iron
* Tim Instrument
Melakukan Perbaikan pada
Peralatan diantaranya Relay
K.10 yang merupakan AC
Indikasi Kerusakan pada Saat Full Speed No auaxiliarry Contactor, MCB
Load atau Idle Test Tegangan Tidak (F.25) pada Panel BAC 011 * selesai
Terbaca Pada HMI atau Voltmeter untuk
Tegangan di Panel BAP 061
* Tim Instrument
Melakukan Penggantian
Push Button S.10 Sehari
Setelah dilakukan Line
Charging dan Pada Saat
Indikasi Kerusakan pada Saat full speed No Pengujian Baru Bisa
Load atau Idle Test Dilakukan Pembacaan Dilaksanakan Pada Hari
Normal pada HMI Namun Rabu tanggal 21 Oktober
pada Saat Mesin Sudah Mulai Normal dan 2020 dan berhasil sinkron * selesai
Akan Dilakukan Sinkron namun Pushbutton dengan Menggunakan
S.10 Tidak dapat Merespon Sehingga Mesin #6 metode melepas tegangan
Tidak Bisa Sinkron sebelum trafo tegangan 11
kV
* Reparasi turbocharger
Bank A Unit #4 SM 1 2018 selesai
* Penggantian turbin blade
Selesai
* akan dilakukan
Penarikan/Unduh ulang
Sistem Logic pada PLC tetapi
Terkendala pada Mother
Board Jika tidak berhasil
dipertimbangkan untuk SM 1 2018 Selesai
Penggantian / Pembelian
PLC
*Repair / perbaikan
kebocoran pada SF6
trafo #2 atau penggunaan
special tools apabila level
gas berkurang kembali
SM 1 2019 Selesai
MONITORING CHR
Beban pada blok 1 tidak bisa Kapasitas Trafo #1 tidak sesuai dengan daya
Main Transformer #1
maksimal mampu mesin pada blok 1
Pembacaan KWh net lebih besar Kesalahan pembacaan pada KWh meter
KWh Meter
daripada gross transaksi
Gedung LFO Boiler Gedung LFO Boiler Kelembapan Suhu Ruangan, Pengaruh
Mengalami Keretakan Cuaca
Bangunan yang berada di tepi Pantai (Area
Jetty)
PLC LFO Fired Boiler indikasi PLC tidak bisa menerima perintah Logic
LFO Fired Boiler Tidak bisa Run untuk Perintah sehingga indikasi yang terbaca Press Reset
Logic pada Panel
Kerusakan Pada
Starting Air Compressor Tidak Bisa Indikasi Kerusakan Peralatan Life Time
Peralatan Starting Air
Digunakan Peralatan
Compressor #2
Kwh Meter
Pembanding
Penyampain PLN Persero Bahwa
untukPemakain Pemisahan Pemakain Pada
Pemakain PS
Sendiri PS (Office, Bangunan Terkait
unit akan ditagihkan
Workshop dan
Gudang)
Dampak Tinda
Keterangan (MWH Loss, Ketaatan Regulasi,
Safety) Penanganan
Terjadi kerusakan pada trafo #1 dan
diganti dengan trafo dengan Pengadaan trafo baru
kapasitas 27 MVA
Jangka Pendek
Kalibrasi
Jangka Panjang
Pengadaan KWh meter baru
Jangka Panjang :
Casing Mengalami Kebocoran Overhaul Turbocharging dan Renew
Turboharging
Peralatan Critical Berada di dalam Jangka Pendek
Bangunan Pembaruan Cat Pelamor Untuk
(LFO Boiler, Chimical Dosing Unit Menghilangkan Keretakan
dan FOPX Separator)
Jangka Panjang
Menambakan Besi Beton dan ditarik
Kedalam untuk Memperkuat Bangunan.
Jangka Pendek :
Dilakukan pegisian Gas SF6 Trafo #2 jika
terjadi penurunan level dan dibuatkan
kajian RCFA dari Enjiniring Unit untuk
Kekurangan level Gas SF 6 Trafo #2 Mengetahui Akar Permasalahannya
PLTD Suppa, dan bisa
Membahayakan Kondisi Peralatan Jangka Panjang :
Sudah dibuatkan Spesifikasi Pembelian
Gas SF 6 dan Special tools Berupa
Regulator untuk proses Top Up Gas SF 6
Trafo #2 yang Bocor
Jangka Pendek :
Memindahkan CVT dari Line Pare II Phasa
R (Kondisi PMT Line II Pare di GI Pare
Bocor) Agar Line Pare I Bisa Beroperasi
Penyaluran Hanya dilakaukan pada
PMS Line II arah Parepare
Jangka Panjang :
Pengadaan Baru CVT (On Progress)
Jangka Pendek :
Udara Starting atau Udara Bertekanan
Untuk Startup Diesel Generator Set Hanya
disupplai dari Startign Air Compressor No.
Udara Bertekanan Berkurang Untuk #1
Penggunaan Start Diesel Generatoe
Set Jangka Panjang :
Akan dilakukan Perbaikan peralatan
secepatnya di Semester 1 TW 1 Oleh Tim
PLTD Suppa
Jangka Pendek :
Sudah Dilakukan Pemaangan KwH Meter
Pembanding diBangunan Office, Workshop
dan Gudanng
Penggunaan Listrik PS Pemakain
Sendiri di Bangunan Office, Jangka Panjang :
Workshop dan Gudang Dilakukan Pemasangan KwH Meter
Pembanding di Bangunan Terkait dengan
Adanya Trafo Sendiri
Jangka Pendek :
Sudah dilakukan plug di coil 1 sampai
Efisiensi dari boiler dari kapasitas dengan 3 pada EGB mesin 3
steam yang dihasilkan 3 ton menjadi
2,3 toon Jangka Panjang :
Recovery atau melepaskan jalur line coil
super heat di section 1
No.Doc : FM-KP-4.1.5.04
Tgl.Berlaku : 25-05-2015
No.Revisi : 01
Halaman :1
Tindak Lanjut
Status
Schedule Hasil Akhir PIC
Pekerjaan Selesai
2018 PJB Selesai
Tahun 2018
Pembuatan
2018 RCFA / untuk Saran Enjiniring PJBS Unit On Progress
Penggantian Kendari
Gagal Pengadaan
Unit PLTD Suppa
2019 Terkendala Anggaran Batal
PT.PJB / PT. PJBS
pada Tahun 2019
Menunggu Koordinasi
Unit PLTD Suppa
2019 dengan Kantor Pusat PT. On Progress
PT.PJB / PT. PJBS
PJB dan PT. PJB Services
Akan dilakukan
Unit PLTD Suppa
pengecekan coil dengan
2021 PJB Kantor Pusat On progress
menggunakan Alat Uku
PJBS kantor Pusat
Thicness
Plan Do Check
No
(Uraian Kegiatan) (Progres Kegiatan) (Permasalahan)
1 PMS 72K Mesin Unit #4 Idle Test and / Tes Idle Test Pengecekan
Comisioning #4 Safety Device Pada
Peralatan / Comisioning
Test dengan Load /
Beban Pada Engine.
OH Selesai Penyusunan
4 PMS 72K Mesin Unit #3 & #4 (Pembuatan Final Keselurahan OH #3 &
Report) #4
Revisi Pembuatan TOR untuk pengerjaan Pembuatan TOR dan Salah Satu Temuan dari
7 dan pembaharuan rockwool dan isolasi line pencarian pihak ke 2 Tim SMK3 pada saat
pipe steam atau kontaktor Assesment
Pengajuan dan pengadaan material spare Pembuatan TOR dan Kurangnya sparepart
10 part rekondisi cylinder head dan governor pencarian supplier / untuk status rekondisi
drive TOR dibuat dari bidang enjiniring Vendor peralatan
Peninjauan Ulang
Pembuatan Tor dan Kontrak dengan Pihak
Pengajuan dan Pengaadaan Jasa Untuk
12 jenis pekerjaan untuk pelaksana untuk
Pekerjaan Pest and Rodent Control Services
pembasmian hama Pekerjaan Pest and
Rodent Control Services
Adanya Indikasi
Pengajuan dan Pembuatan Spesifikasi Kebocoran ada Seal
Pembelian untuk Gas SF 6 dan Special Pembuatan Spesifikasi Circuit Breaker Trafo #2
22
Tools untuk Proses Top Up Gas SF 6 Trafo Pembelian PLTD Suppa Sehingga
#2 PLTD Suppa Level Gas SF 6
Berkurang
Dibutuhkan gudang
terbuka untuk
Pengajuan dan pembuatan TOR lengkap
menyimpan beberapa
dengan gamber teknik dan spesifikasi untuk Pembuatan TOR dan
32 sparepart bekas dan
rak container dan atap rak container gudang gambar spesifikasi
pekerjaan hot work di
terbuka
lakukan di area gudang
terbuka
Pembuatan TOR dan
perjanjian pekerjaan AVR DECS 125 - 15 tiba
Pengajuan dan pembuatan TOR untuk
33 yang akan dilakukan tiba trip yang berada di
rencana jasa service AVR DECS 125 - 15
oleh pelaksana mesin #5
pekerjaan
sudah dilakukan
pembuatan TOR untuk
Adanya beberapa
pencarian spesifikasi
Pembuatan TOR untuk pembelian exhaust exhaust fan unit yang
34 teknik yang sesuai
fan unit sudah rusak dan type 1
dengan exhaust fan
phasa dan 3 phasa
yang akan digunakan
diunit
Pembuatan spesifikasi
Membuat spesifikasi pembelian / pekerjaan pembelian membuat rekomendasi untuk
37 Penambahan rak kontainer di gudang gambar / modelling dan diadakan gudang
terbuka PLTD Suppa menentukan material terbuka di PLTD Suppa
yang akan digunakan
Rekomendasi untuk
Pembuatan spesifikasi
pembuatan handreal
Membuat spesifikasi pembelian / pekerjaan pembelian membuat
dan perbaikan drain pit
38 pembuatan handreal dan perbaikan drain pit gambar / modelling dan
instrument workshop
instrument workshop menentukan material
merupakan temuan
yang akan digunakan
P2K3 PLTD Suppa
Pembuatan spesfikasi
pembelian untuk Rekomendasi untuk
Membuat spesifikasi pembelian / pekerjaan
menentukan titik pekerjaan merupakan
39 penambahan lampu penerangan dia cooling
penerangan dan temuan P2K3 PLTD
water radiator PLTD Suppa
material yang akan Suppa
digunakan
Dilakukan pembuatan
Pengajuan dan pembuatan TOR untuk jasa Battery charger sudah
TOR sesuai dengan
40 pengadaan battery charger untuk peralatan tidak berfungsi atau
spesifikasi teknik yang
switchyard PLTD Suppa dalam keadaan rusak
sesuai
Dilakukan pengecekan
ukuran dimensi yang Panel jetty sudah mulai
Membuat spesifikasi pembelian / untuk panel
41 sesuai dengan housing kropos dan salah satu
housing di jetty PLTD Suppa
panel di jetty PLTD temuan dari tim P2K3
Suppa
bergabungnya limbah
Dilakukan pengukuran
Review TOR untuk pembuatan pemisahan domestic grey water dan
42 ulang dan design yang
limbah domestic IPLC black waste PLTD
sesuai
Suppa
Jadwal di trending
Pembuatan trending penambahan gas SF6 Berkurangnya gas SF6
43 sesuai dengan
CB breaker trafo di CB breaker trafo #2
penambahan gas SF6
Pembuatan TOR untuk rencana pekerjaan Pembuatan TOR dan Peningkatan keamanan
46 pembuatan bilik sanitizer spray di PLTD Tindak Lanjut sehubungan dengan
Suppa Pekerjaan siaga virus corona
Pembuatan TOR untuk rencana pekerjaan Pembuatan TOR dan Peningkatan keamanan
47 pembuatan alata sterilisasi dengan Tindak Lanjut sehubungan dengan
menggunakan lampu ultraviolet Pekerjaan siaga virus corona
Menormalkan kembali
Pembuatan TOR untuk pengadaan jasa Pembuatan TOR dan
fungsi peralatan pada
48 perbaikan PLC Card Annunciator Fire Tindak Lanjut
panel Annunciator Fire
Fighting Panel LE13 Nomor #3 & #4 Pekerjaan
Fighting
Pembuatan TOR untuk jasa perbaikan Pembuatan TOR dan Menormalkan kembali
49 Rectifier Battery Diesel Fire Fighing PLTD Tindak Lanjut fungsi peralatan pada
Suppa Pekerjaan diesel fire fighting
Menormalkan kembali
Pembuatan TOR dan
Pembuatan TOR unutk Jasa Perbaikan Main fungsi peralatan pada
50 Tindak Lanjut
Alarm Annunciator Fie Fighting GE Card panel Annunciator Fire
Pekerjaan
Fighting
Mernormalkan Kondisi
Review Pembuatan TOR Untuk Jasa Pembuatan TOR dan
Peralatan Untuk
51 Perbaikan Mechanical Annex dan Electrical Tindak Lanjut
Pendingin Mesin dan
Annex Pekerjaan
Auxiliarry
Mengifsienkan Kondisi
Pembuatan TOR dan
Review TOR Jasa Perbaiakan Rockwool Steam Agar
52 Tindak Lanjut
Pipa Steam PLTD Suppa Temperature / Panas
Pekerjaan
Tetap Stabil
Memberikan Informasi
Terhadap Pelaksana
Pembuatan TOR dan Pekerjaan Mengenaik
Membuat TOR Standarisasi Pengisian
55 Rindak Lanjut Jenis APAR yang
Tabung APAR Unit
Pekerjaan digunakan dan Media
Apa Saja Untuk
Persayaratnnya
Memberikan Informasi
Terhadap Pelaksana
Pekerjaan Mengenaik
Membuat TOR Standarisasi Pengisian Revisi Dokumen dan
61 Jenis APAR yang
Tabung APAR Unit Tanggal Terbit
digunakan dan Media
Apa Saja Untuk
Persayaratnnya
Pembuatan TOR
sesuai dengan Jumlah
APAR (Alat Pemadam
Membuat TOR Pembelian APAR (Alat Order dan Jenis APAR
62 Api Ringan) Sudah
Pemadam Api Ringan) (Alat Pemadam Api
dalam Keadaan Expired
Ringan) yang
diinginkan
Untuk Pengecekan
Peralatan yang
Membuat Spesifikasi Teknik Pembelian Bertujuan Tanpa
68 Spesifikasi Teknik
Endoscope Borescope / Video Check Membongkar dan
Merusaka Peralatan
Lainnya
Check Action
PIC
(Penyebab) (Tindakan) (Target)
Pengujian Stelah Penyusunan
Pelaksanaan Skenario Overhaul
Overhaul. dan Pemantaun PT. Jasuma Austindo
Parameter - May-18
O/M PLTD Suppa
Parameter Engine#4
dilaksanakan
Adanya Beberapa Meeting oleh Tim PT. Jasuma Austindo
penyebab Lagging UJP PJBS dan Tim May-18 O/M PLTD Suppa
(Spare part dan Jam Proyek Setiap Sore UJP PJBS
Kerja) untuk Membahas
Proggress harian
Dilakukan
Untuk dijadikan pengecekan
evidence Risk Survei perbandingan ke Flir KP PJBS Fire engineer
2019
2018 dari PT . dan perhitungan / LK3 PLTD Suppa
Endurra untuk modifikasi
yang dilakukan Unit
Untuk dijadikan
Dalam proses TOR
evidence Risk Survei KP PJBS Fire engineer
sudah diserahkan ke 2019
2018 dari PT . / LK3 PLTD Suppa
bidang Pengadaan
Endurra
segala perihal
Kerusakan pada tiang
pengerjaan sudah Engineering PLTD
penyangga dan warna 2018
dituangkan dalam Suppa
yang sudah pudar
TOR
Kropos pada lantai TOR sudah dibuat
Engineering PLTD
dan kerusakan pada (Progress 2018
Suppa
filter draining pengesahan)
tidak adanya
kesiapan spare part
TOR sudah dibuat
stand by untuk Engineering PLTD
(Progress 2018
pengerjaan rekondisi Suppa
pengesahan)
cylinder head dan
governor drive
Pembahasan Kontrak
TOR sudah dibuat Engineering PLTD
dengan Pihak
(Progress 2018 Suppa / Umum dan
Pelaksana dan durasi
pengesahan) Pengadaan
kerja salama 1 bulan
Dibuatkan
Spesifikasi
Pembelian untuk Engineering /
Indikasi Kebocoran
Gas SF 6 dan 2019 Pengadaan PLTD
Pada Peralatan
Special Tools untuk Suppa
Proses Top Up Gas
SF 6
Pembuatan TOR
saluran domestic
sudah dibuat perlu Engineering
water belum diketahui
dikoordinasikan 2019 Pengadaan
apakah tercampur
dengan top manajer Umum PLTD Suppa
atau tidak
di unit PLTD Suppa
Idnetifikasi Lokasi
Temuan dari Tim Risk
dan TOR di Buat Enjiniring KP/ Fire
Manajeme PT. 2020
Oleh Tim Kantor Enjiniring KP
Endurra
Pusat
Idnetifikasi Lokasi
Temuan dari Tim Risk
dan TOR di Buat Enjiniring KP/ Fire
Manajeme PT. 2020
Oleh Tim Kantor Enjiniring KP
Endurra
Pusat
Dilakukan
Umur Sparepart yang Perbaiakan dan
SCM / Enjiniring PLTD
terpasang di Rencana pembelian 2019
Suppa
peralatan Sparepart yang
Sesuai
Gambar pekerjaan
adanya beberapa sudah ada
Enjiniring PLTD Suppa
sparepart tidak diutamakan untuk 2019
/ Pemeliharaan
memiliki penyimpanan rak container gudang
terbuka
TOR sduah dibuat
Masa waktu peralatan
dan akan diserahkan
dan AVR tersebu Enjiniring
ke pihak pengadaan
diperkirakan sudah 2019 SCM
untuk proses
dalam keadaan Pemeliharaan
pencarian pihak
absolute
pelaksana pekerjaan
Penambahan rak
Spesifikasi
bertujuan untuk bisa Enjiniring
pembelian
menyimpan sparepart 2019 SCM
diserahkan kebidang
dengan ukuran yang
pengadaan
kecil
Pekerjaan dilakukan
Spesifikasi
untuk mengamankan Enjiniring
pembelian
dan memperbaiki 2019 SCM
diserahkan kebidang
kondisi peralatan
pengadaan
untuk saat ini
Enjiniring
TOR sudah dibuat
Tidak adanya LK3
dan diajukan ke 2019
pemisahan SCM
pengadaan
Akan dilakukan
Kondisi Operator Fuel Pengadaan Jasa
Enjiniring
Treatment dalam Pembauatan Bilik
2020 Operasi
Kondisi Unsafety Operator Fuel
Pengadaan
Condition Treatment PLTD
Suppa
Akan dilakukan
Lighitng Aerester di Enjiniring
Pembuatan Tools
Tangki B Storage Elektrik
Untuk Pekerjaan 2020
Indikasi Korosif dan LK3
Jika disepakati dari
Putus Pengadaan
Hasil Meeting
Setiap Pengisian
APAR pihak
Pelaksana
Ada beberapa APAR Enjiniring
Pekerjaan Akan
yang sudah Keadaan 2020 LK3
Memsatikan
Tidak optimal Pengadaan
Kesesuain dengan
Standar yang Sudah
dibuat
Akan Dilakukan
Tidak ada Akses Enjiniring
Pembuatan Anak
Jalan Menuju Ke 2020 LK3
Tangga atau Akses
Lokasi Tersebut Pengadaan
yang Sesuai
Pembuatan
Spesifikasi
Enjiniring
Pembelian dan
Terpakai 2020 Mekanik
Pencarian Supplier
Pengadaan
dari Pihak
Pengadaan
Pengecekan Tabung
Waktu Terlalu Enjiniring
dan Perhitungan
Rendah Untuk 2020 LK3
Lama Pemakaian
Digunakan Pengadaan
Tabung SCBA
Membuat Water
Bump dan Drainpit
Jika Terjadi Hujan Oli Enjiniring
dan disalurkan
yang Mengendap 2020 LK3
Menuju saluran Gray
Terbawah Air Hujan Pengadaan
Waste Unit PLTD
Suppa
Manajer Unit
Gelas Duga Bocor Revisi Tanggal
DM OP/HAR
Terjadi Kontaminasi Dokumen untuk 2021
Enjiniring
Air Minyak Peralatan Pengajuan Dokumen
Pengadaan
Pembuatan Sesuai
Ada beberapa APAR Enjiniring
dengan Tanggal
yang sudah Keadaan 2021 LK3
Terbit DPR dari
Tidak optimal Pengadaan
Bidang LK3 Unit
Enjiniring
Pembuatan DMR
Mekanik
Wire Rope Mulai untuk Pengajuan
2021 Elektrik
dalam Kondisi Korosif Pekerjaan Special
LK3
Tools
Pengadaan
Akan dilakukan
pengecekan Awal di
Dibuatkan Enjiniring
Peralatan EGB mesin 2021
Spesifikasi teknik Pengadaan
#3 Suction Coil Blok 1
Bocor