The document is a checklist for inspecting site preparation and excavation work. It contains 12 items to check such as following the approved method statement and inspection test plan, recognizing health, safety, and environment risks and requirements, protecting existing buried services, ensuring working platforms and protections are in place, removing debris, establishing required set-out, markings, and levels prior to excavation, checking excavation dimensions, slopes, and depths comply with drawings, ensuring excavations and slopes are stabilized, dewatering systems are adequate, final surveys comply with drawings, moisture control is acceptable, compaction methods and equipment are appropriate, and field density and moisture reports are filed.
The document is a checklist for inspecting site preparation and excavation work. It contains 12 items to check such as following the approved method statement and inspection test plan, recognizing health, safety, and environment risks and requirements, protecting existing buried services, ensuring working platforms and protections are in place, removing debris, establishing required set-out, markings, and levels prior to excavation, checking excavation dimensions, slopes, and depths comply with drawings, ensuring excavations and slopes are stabilized, dewatering systems are adequate, final surveys comply with drawings, moisture control is acceptable, compaction methods and equipment are appropriate, and field density and moisture reports are filed.
The document is a checklist for inspecting site preparation and excavation work. It contains 12 items to check such as following the approved method statement and inspection test plan, recognizing health, safety, and environment risks and requirements, protecting existing buried services, ensuring working platforms and protections are in place, removing debris, establishing required set-out, markings, and levels prior to excavation, checking excavation dimensions, slopes, and depths comply with drawings, ensuring excavations and slopes are stabilized, dewatering systems are adequate, final surveys comply with drawings, moisture control is acceptable, compaction methods and equipment are appropriate, and field density and moisture reports are filed.
SITE PREPARATION & EXCAVATION INSPECTION CHECKLIST
PROJECT TITLE REPORT NO.
JOB NO. DATE DRAWING NO. LOCATION CHECKED BY S/No. ITEMS TO BE CHECKED CONTRACTOR REMARKS ACC REJ N/A 1 Approved Method Statement and ITP being followed?
2 HSE risks and requirements recognised and documented?
Check and protect existing, buried services and secure required 3 permits & clearances. Check working platforms, temporary access, protection barriers, 4 silt curtains, soil stability and slopes has been in place.
Check all debris, unnecessary materials, foreign objects are
5 removed and disposed properly.
Check setting-out, markings and required levels has been
6 established prior commencement of excavation.
Check excavation dimension, line and grade with respect to AFC
7 drawings are followed.
Check if excavations and slopes are stabilized to protect from
8 cave-in and other physical damage and shall maintain the required depth, slope, level and dimensions until next activity.
9 Dewatering System is adequate
Final Survey Report complies to AFC drawings.
9 (Bottom of Foundation/Structure)
10 Moisture Control acceptable
11 Compaction method and type of equipment
12 Field Soil Density/Moisture Content Reports Filed