G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

Plot No. 376-970, Al Barsha, Dubai

BILL No. 1 - PRELIMINARIES

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Preliminaries

A Mobilization

B Insurance

C Liaison with authorities

D Sign Board

E Hording

F Site Office set up

G Telephone / Fax

H Water & Electricity for the works

J Site Supervision
870,000.00
K Security

L Health and Safety

M Scaffolding

N Plants & Tools

P Samples

Q General site cleaning, Rubbish skips

R Final Cleaning

S De Mobilization

T As Built documentation

Carried to General Summary Page 1 DHS. 870,000.00

BILL NO.01 1 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

SITE WORK
Earth Works

A Shoring & De-watering works 1 Item 0.00 Included in Bill


No.06 Provisional
Sum

B Site clearence 1 Item 0.00 Included in below


Item

General excavation
C Excavation for Foundations 1,070 m3 21.00 22,470.00

BILL NO.02 2 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Backfilling with selected excavated material


D Backfill with selected excavated material and well
compact in layers around foundations and raft slab 880 m3 16.00 14,080.00

E Cart away surplus excavated material to government 190 m3 Included in Bulk


specified location (provisional quantity ) Excavation

DISPOSAL

Imported fill material


F Imported fill material 560 m3 86.00 48,160.00

BILL NO.02 3 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Anti-termite Treatment
G Anti-termite Treatment 990 m2 3.00 2,970.00

Carried to General Summary Page 1 87,680.00

BILL NO.02 4 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK
SUB STRUCTURE

IN SITU CONCRETE
Plain poured concrete - SRC 30/20
A 50mm thick Blinding 70 m3 347.00 24,290.00

Reinforced Sulphate Resistant Cement Concrete


Grade 40 /20
B In Raft slab 135 m3 365.00 49,275.00

C In Column 9 m3 368.00 3,312.00

BILL NO.02 5 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

D In tie-beam 38 m3 365.00 13,870.00

E In walls 22 m3 365.00 8,030.00

F In ground floor slab 58 m3 365.00 21,170.00

BILL NO.02 6 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

G Mass concrete infill in column foundation between tie- 22 m3 365.00 8,030.00


beam

H In Steps 2 m3 365.00 730.00

J In planter upstands 3 m3 365.00 1,095.00

BILL NO.02 7 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

REINFORCEMENT
K High yield strength deformed bar reinforcement with 20,765 Kg 4.31 89,497.15
BS 4449,BS 4461 ,BS4483 and cut and bent to BS
4466 minimum characteristic strength of 460N/mm2

BRC -A 142 Mesh fabric reinforcement including


laps,Fixed horizontally to
L Ground slab 577 m2 13.00 7,501.00

BILL NO.02 8 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FORMWORK
M To Sides of Foundations 191 m2 27.00 5,157.00

N To Sides of Column 114 m2 33.00 3,762.00

P To tie-beams 435 m2 28.00 12,180.00

BILL NO.02 9 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Q To Sides of Steps 8 m2 27.00 216.00

R To Sides of wall 152 m2 30.00 4,560.00

Carried to General Summary Page 2 252,675.15

BILL NO.02 10 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)

SUB STRUCTURE (Cont'd)


SUNDRIES

A 20mm thick Flexcell Board or other equal and


approved compressible filler between concrete
surfaces at expansion joints/construction joints. 1 Item 2,534.00 2,534.00

B Pointing 20mm wide x 20mm deep with approved


mastic sealant 1 Item 1,518.00 1,518.00

Solid Concrete Block work for the substructure walls


C 200mm thick Substructure walls 171 m2 83.00 14,193.00

BILL NO.02 11 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Substructure waterproofing works


D 1000 gauge protection layer below sub-structure 985 m2 4.00 3,940.00

E Two coats of Bitumen emulsion paint for the 1220 m2 6.00 7,320.00
horizontal & vertical faces of of substructure

F Vertical Faces to be protected with one layer of fibre 650 m2 6.00 3,900.00
board

Swimming Pool

G Single Layer PVC menmrane 2.2mm thk with 140 m2 50.00 7,000.00
damage indicating signal layer, double seam weld to
allow pressure testing

H 320mm wide 2.3mm thk PVC water stop W4 35 m 259.00 9,065.00

BILL NO.02 12 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

J Slip membrane superior needle punched nonwoven 140 m2 6.00 840.00


geotextile specific weight 370g/3 virging
polypropylene for vertical & horizontal areas

K Flexible re-injectable PVC hose system 19mm 35 m 44.00 1,540.00


nominal outside diameter , 6mm nominal inside
diameter, complete with all junctions

Carried to General Summary Page 3 51,850.00

BILL NO.02 13 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)


SUPER STRUCTURE
Reinforced Ordinary Portland Cement Concrete
Grade 40 /20
A In Columns 30 m3 353.00 10,590.00

B In solid slab, 250mm thick 316 m3 352.00 111,232.00

C In Beams 8 m3 352.00 2,816.00

BILL NO.02 14 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

D In Walls 12 m3 352.00 4,224.00

E In planter boxes& upstand 3 m3 352.00 1,056.00

F In parapet walls 82 m3 352.00 28,864.00

BILL NO.02 15 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

G In Staircase 5 m3 352.00 1,760.00

H In stiffner beams 3 m3 352.00 1,056.00

J In stiffner columns 3 m3 353.00 1,059.00

BILL NO.02 16 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

REINFORCEMENT
K High yield bar reinforcement with minimum 44,490 kg 4.31 191,751.90
characteristic strength of 460N/mm2

FORMWORK
L To sides of columns 403 m2 37.00 14,911.00

M To sides and soffits of solid slabs 1290 m2 27.00 34,830.00

BILL NO.02 17 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

N To sides and soffits of beams 55 m2 24.00 1,320.00

P To sides of walls 115 m2 35.00 4,025.00

R To sides of planter box & upstand 15 m2 35.00 525.00

BILL NO.02 18 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

S To sides of parapet wall 702 m2 35.00 24,570.00

T To Sloping soffits of staircase and landing 26 m2 27.00 702.00

U To stiffner beams beams 30 m2 24.00 720.00

BILL NO.02 19 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

V To stiffner beams columns 30 m2 37.00 1,110.00

Carried to General Summary Page 4 437,121.90

BILL NO.02 20 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)


SUPER STRUCTURE(Cont'd)

Insitu concrete lintel including formwork, reinforcement


A 100 x 200 mm lintels 22 m 52.00 1,144.00

BILL NO.02 21 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

B 200 x 200 mm lintels 58 m 96.00 5,568.00

BILL NO.02 22 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

C 200 x 250 mm lintels 37 m 79.00 2,923.00

BILL NO.02 23 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

D Machine foundations at roof floor 1 Item 3,019.00 3,019.00

BILL NO.02 24 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

E Extra Over to the concrte works allow for concrete 1 Item 9,895.50 9,895.50
parapet projections, window projections, etc.

Carried to General Summary Page 5 22,549.50

BILL NO.02 25 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

MASONRY WORKS

Masonry Block walls


A 250mm block work, External Thermal block walls 612 m2 115.00 70,380.00

B 200mm thick; Internal Hollow block walls 723 m2 79.00 57,117.00

C 100mm thick; Internal walls 296 m2 70.00 20,720.00

BILL NO.02 26 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

D Damp proof course, under blockwalls, internal and 590.00 m 10.00 5,900.00
external walls

BILL NO.02 27 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 6 154,117.00

BILL NO.02 28 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

THERMAL & MOISTURE PROTECTION

Wet area waterproofing


A Toilets & Balconies 343 m2 31.00 10,633.00

Roof Waterproofing
B Light weight concrete laid to slope 562 m2 21.00 11,802.00

C Torch applied 4mm thk waterproofing membrane 562 m2 50.00 28,100.00

D Torch applied 4mm thk waterproofing membrane 170 m2 33.00 5,610.00


skirting

E 20 mm thk cement sand mortar 562 m2 29.00 16,298.00

F Non-weven polypropylene mesh 562 m2 8.00 4,496.00

BILL NO.02 29 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

G Polystyerene rigid insulation 562 m2 29.00 16,298.00

H 50mm high density extruded 562 m2 29.00 16,298.00

J 300x300x30mm White cement tiles 562 m2 55.00 30,910.00

K Dressing around pipes & Natural gravel 4 m2 50.00 200.00

L Thermal Insulation for super structure as per DM 1 LS 13,200.00 13,200.00


regulations

BILL NO.02 30 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 7 153,845.00

BILL NO.02 31 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

NON STRUCTURAL METAL WORK

Wrought Iron Railing

A Wrought railing for balcony 24 m

B Staircase Handrailing 13 m Included in the

Bill No.06
C Void area railing 2 m Provisional Sum

D G.I. Powder coated Cat ladder 1.00 Nos.

BILL NO.02 32 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 8 -

BILL NO.02 33 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

WOOD WORK

A Wooden pergola as shown on drawing : Overall size; 1 Item Not Applicable


6.025x2.70 m

B Wooden Trellis, stained and varnished finish: Overall 1 Item Not Applicable
size; 14.20x2.50m

WARDROBES ( Excluding Ironmongeries,


covered under Provisional Sum)
Int. white melamine finish & Ext. Mahogany finish

C For Changing Room - 1.225x2.60x0.60 m 1 No 0.00 -

D For Maid's Room - 1.60x2.60x0.60 m 1 No 0.00 -

E For Guest Room - 3.34x2.60x0.60 m 1 No 0.00 -

F For Guest Room - 2.10x2.60x0.60 m 1 No 0.00 -

G For Guest Room - 1.00x2.60x0.60 m 1 No 0.00 -

BILL NO.02 34 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

H Master bed room - 4.10x2.60x0.60 m 2 No 0.00 -

J Master bed room - 2.30x2.60x0.60 m 1 No 0.00 -

K Master bed room - 5.17x2.60x0.60 m 1 No 0.00 Included in the

Bill No.06
L Master bed room - 4.10x2.60x0.60 m 1 No 0.00 Provisional Sum

M Master bed room - 2.30x2.60x0.60 m 1 No 0.00 -

N Bed room 2 Dressing- 2.40x2.60x0.60 m 2 No 0.00 -

O Bed room 2 Dressing- 2.80x2.60x0.60 m 1 No 0.00 -

BILL NO.02 35 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

P Bed room 3 Dressing- 2.30x2.60x0.60 m 2 No 0.00 -

Q Bed room 3 Dressing- 2.50x2.60x0.60 m 1 No 0.00 -

R Bed room 4 Dressing- 4.00x2.60x0.60 m 1 No 0.00 -

S Bed room 4 Dressing- 2.50x2.60x0.60 m 2 No 0.00 -

Carried to General Summary Page 9 -

BILL NO.02 36 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

WODD WORK…./

KITCHEN CABINET ( Excluding Ironmongeries,


cever under Provisional Sum)

Int. white plastic laminated finish & pvc lipping Ext.


stained wood veneer finish

A Kitchen base Unite + Wall units 1 LS 0.00 Included in the

Bill No.06
Provisional Sum

Bill No.06
Provisional Sum
PANTRY UNIT ( Excluding Ironmongeries, cever
under Provisional Sum)
Stained wood veneer finish
G Pantry Base unit + Wall Units 1 LS 0.00

BILL NO.02 37 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 10 -

BILL NO.02 38 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

DOORS AND WINDOWS

TIMBER DOORS ( Excluding Ironmongeries,


cever under Provisional Sum)

A Type - D1, Single leaf Timber door 1 No

B Type D2, Single leaf Timber door 8 No

C Type D3, Single leaf Timber door 2 No

D Type D4, Single leaf Timber door 9 No Included in the

Bill No.06
E Type D5, Double leaf 2hrs fire rated Timber door 1 No Provisional Sum

F Type D6, Single leaf 2hrs fire rated Timber door with 6 No
wired vision panel

BILL NO.02 39 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

G Type D7, Double leaf 2hrs fire rated Timber door with 1 No
wired vision panel

Carried to General Summary Page 11 -

BILL NO.02 40 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES
INTERNAL FINISHES
INTERNAL BACKGROUNDS

A 50mm thick cement sand screed to receive final floor finishes


1140 m2 28.00 31,920.00

B 15mm thick cement and sand plaster to the internal walls 2966 m2 28.00 83,048.00

C 15mm th cement sand plaster to soffit of the slabs 1290 m2 31.00 39,990.00

BILL NO.02 41 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FLOOR FINISH
D Marble & Granite combination on floor (Allow a PC 26.00 m2 565.00 14,690.00
rate of - Dhs. 450/m2 for supply of Marble /
Granite) - MR / GR1

E Supply and fixing of to 20mm thick Granite, cut to 242.00 m2 565.00 136,730.00
size, laid in matching colours form geometrical
pattern on floor (Allow a PC rate of - Dhs. 450/m2
for supply of Granite) - GR1

BILL NO.02 42 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F Supply and fixing of to 20mm thick Marble, cut to 19.00 m2 565.00 10,735.00
size, laid in matching colours form geometrical
pattern on floor (Allow a PC rate of - Dhs. 450/m2
for supply of Marble) - MR1

G Supply and fixing of 200x200x7mm unglazed 94.00 m2 108.00 10,152.00


ceramic tile with matching colour epoxy grout. (Allow
a PC rate of - Dhs. 50/m2 for supply of Ceramic) -
CT-1

H Supply and fixing of 300x300/400x400x8mm 710.00 m2 120.00 85,200.00


unglazed ceramic tile (heavy Duty) with matching
colour epoxy grout. (Allow a PC rate of - Dhs.
60/m2 for supply of Ceramic) - CT-3

BILL NO.02 43 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

J Supply and installation of wooden floor. (Allow a PC 22.00 m2 440.00 9,680.00


rate of - Dhs. 400/m2 for supply & Installation of
wooden floor including wastage) - WD-4

K Granite Tread & Riser to the main staircase. (Allow a 41.00 m 572.00 23,452.00
PC rate of Dhs. 450/= per Rm )

L Granite tiles to the landing of the staircase. (Allow a 7.00 m2 565.00 3,955.00
PC rate of Dhs. 450/m2 for supply of granite)

BILL NO.02 44 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 12 449,552.00

BILL NO.02 45 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES../
INTERNAL FINISHES…/
WALL FINISH
A Supply and fixing of 200x200/ 200x300x6 mm glazed 376.00 m2 108.00 40,608.00
ceramic tile matching with epoxy grout. (PC rate for
supply - Dhs. 50/m2) CT-2

B Supply and fixing of 25x25mm glass mosaic tile fixed 310.00 m2 160.00 49,600.00
with adhesive on smooth sand plaster. (PC rate for
supply - Dhs. 100/m2). WF-4

C Supply and apply Paint finish Paint - Type P1, to the 1,113.00 m2 13.00 14,469.00
cement sand plastered walls CP-2 (measured
seperately).

D Supply and apply Paint finish Paint - Type P3, to the 30.00 m2 35.00 1,050.00
cement sand plastered walls CP-3 (measured
seperately).

BILL NO.02 46 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

E Supply and apply the washable emulsion paint - 120.00 m2 15.00 1,800.00
WF2a

F Supply and apply the washable emulsion paint 522.00 m2 22.00 11,484.00
(decorative application)-(PC rate for Supply &
Apply Dhs. 20/m2)- WF2b

SKIRTING FINISH
G 100mm high ceramic tile skirting match the floor - 313.00 m 33.00 10,329.00
(PC rate for supply - Dhs. 15/m) - CT-5

H 10mm thick 100mm high marble skirting to match 19.00 m 160.00 3,040.00
floor(PC rate for supply - Dhs. 125/m) - MR-3

BILL NO.02 47 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

J 100mm high wooden (WD3-Beach wood) skirting 19.00 m 110.00 2,090.00


stained and w/clear polyrethene paint to match
Engineer's sample. (PC rate for supply & fix - Dhs.
100/m) - WD-2

K 10mm thick 100mm high granite skirting to the stair 28.00 m 135.00 3,780.00
matching to the tread and riser (PC rate for supply -
Dhs. 100/m)

BILL NO.02 48 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Thresholds
K 100 mm wide; 30mm thick Marble threshold to match 9.00 m 150.00 1,350.00
with the floor colour (PC rate for supply - Dhs.
100/m)

L 200mm-300mm Wide; 30mm thick Marble threshold 18.00 m 262.00 4,716.00


to match with the floor colour (PC rate for supply -
Dhs. 200/m)

Carried to General Summary Page 13 144,316.00

BILL NO.02 49 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES../
INTERNAL FINISHES…/

Ceiling Finishes (Covered under Provisional sum


Item)
A Supply and fix suspended gypsum board ceiling with 360.00 m2 0.00
painted. Paint type P1. Ceiling Type - SC1

B Supply and fix suspended12.5mm thick water 120.00 m2 0.00


resistance gypsum board ceiling with painted. Paint
type P2. Ceiling Type - SC2

C Supply and fix 600 x 600 mm. Suspended Baked 130.00 m2 0.00
Enamel Aluminium tiles with exposed spline. SC3

Included in the
D Supply and fix suspended12.5mm thick gypsum 5.00 m2 0.00 Bill No.06
board ceiling with painted. Paint type P3. Ceiling Provisional Sum
Type - SC4

E Supply & fixing of 600X600X6 mm Thk. Suspended 24.00 m2 0.00


Calcium Silicate Vinyl Faced Tile On Exposed Grid -
SC6

F Gypsum Bulk Head 200mm and above 272.00 m 0.00

BILL NO.02 50 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

G Gypsum Bulk Head (50mm) 181.00 m 0.00

H Gypsum Decorative Cornice 137.00 m 0.00

J Supply and apply the paint type of the paint Type P2.- 21.00 m2 15.00 315.00
to cement sand plaster(measured seperately) CP-2

K Supply and apply the paint type of the paint Type P1.- 375.00 m2 13.00 4,875.00
to cement sand plaster (measured seperately) CP-1

Carried to General Summary Page 14 5,190.00

BILL NO.02 51 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

EXTERNAL FINISHES

BACKGROUNDS
Walls
A 20mm thick Cement and sand plaster to external walls 1200 m2 34.00 40,800.00

including returns, reveals of openings or recesses ; to

B Extra Over to the extrenal plaster, plaster grooves 1 Item 51,975.00 51,975.00

FINISHES
C EF 3 - Stone rendering exterior wall finish. (PC rate 429 m2 110.00 47,190.00
for Dhs. 100/m2 for Supply and apply of Stone
rendering including 20mm x 4mm Horizontal &
Vertical grooves)

D EF 5 - Epoxy Paint Finish to the plastered walls 726 m2 39.00 28,314.00

E Extra Over for the EF-6 (Epoxy paint finish/ Paint 1 Item 5,500.00 5,500.00
Type 3) for the parapet top detail, projections, etc.

BILL NO.02 52 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F EF 7 - Supply and fixing of 20mmthick marble 20 m2 605.00 12,100.00


cladding rubble finish as per the elevation
details.(PC rate of Dhs. 550/m2 for Supply & Fix of
Marble)

Carried to General Summary Page 15 185,879.00

BILL NO.02 53 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

GENERAL SUMMARY

MAIN VILLA

A SITE WORKS Page 1 87,680.00

B SUB-STRUCTURE
Page 2 252,675.15
Page 3 51,850.00
304,525.15 304,525.15

C SUPER-STRUCTURE
Page 4 437,121.90
Page 5 22,549.50
459,671.40 459,671.40

D MASONRY WORKS Page 6 154,117.00

E THERMAl & MOISTURE PROTECTION Page 7 153,845.00

F NON-STRUCTURAL METAL WORKS Page 8 -

G WOOD WORKS
Page 9 -
Page 10 -
Page 11 -
- -

H INTERNAl FINISHES
Page 12 449,552.00
Page 13 144,316.00
Page 14 5,190.00
599,058.00 599,058.00

J EXTERNAL FINISHES Page 15 185,879.00

MAIN VILLA SUMMARY 1,944,775.55

BILL NO.02 54 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

SITE WORK
Earth Works
A Shoring & De-watering works 1 Item 0.00 Included in Bill
No.06
Provisional Sum

B Site clearence 1 Item 0.00 Included in


below Item

General excavation
C Excavation for Foundations 317 m3 21.00 6,657.00

D Cart away surplus excavated material to government 190 m3 Included in Bulk


specified location (provisional quantity ) Excavation

Anti-termite Treatment
E Anti-termite Treatment 130 m2 3.00 390.00

Carried to General Summary Page 1 Dhs. 7,047.00

BILL NO.03 55 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK

SUB STRUCTURE

IN SITU CONCRETE

Plain poured concrete - SRC 30/20


A 50mm thick Blinding 9 m3 290.00 2,610.00

Reinforced Sulphate Resistant Cement Concrete Grade


40 /20
B In Raft slab 36 m3 365.00 13,140.00

C In Column 3 m3 368.00 1,104.00

D In walls 40 m3 365.00 14,600.00

E In ground floor slab 22 m3 365.00 8,030.00

F In Stairway 2 m3 365.00 730.00

REINFORCEMENT
G High yield strength deformed bar reinforcement with BS 11,850 Kg 4.31 51,073.50
4449,BS 4461 ,BS4483 and cut and bent to BS 4466
minimum characteristic strength of 460N/mm2

FORMWORK
H To Sides of Foundations 21 m2 27.00 567.00

J To Sides of Column INCLUDED IN WALLS

K To Stairway 12 m2 27.00 324.00

L To Sides of wall 323 m2 30.00 9,690.00

M To sides and soffits of solid slabs 87 m2 27.00 2,349.00

Carried to General Summary Page 2 Dhs. 104,217.50

BILL NO.03 56 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)

SUB STRUCTURE (Cont'd)


SUNDRIES

Substructure waterproofing works


A 1000 gauge protection layer below sub-structure 90 m2 4.00 360.00

B Single Layer PVC menmrane 2.2mm thk with damage 240 m2 50.00 12,000.00
indicating signal layer, double seam weld to allow
pressure testing

C 320mm wide 2.3mm thk PVC water stop W4 47 m 259.00 12,173.00

D Slip membrane superior needle punched nonwoven 240 m2 6.00 1,440.00


geotextile specific weight 370g/3 virging polypropylene
for vertical & horizontal areas

E Flexible re-injectable PVC hose system 19mm nominal 47 m 44.00 2,068.00


outside diameter , 6mm nominal inside diameter,
complete with all junctions

F Screed for the protection of Horizontal faces 90 m2 55.00 4,950.00

G Vertical Faces to be protected with one layer of fibre 136 m2 6.00 816.00
board

Carried to General Summary Page 3 Dhs. 33,807.00

BILL NO.03 57 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)

SUPER STRUCTURE

Reinforced Ordinary Portland Cement Concrete Grade


40 /20
A In Columns 4 m3 353.00 1,412.00

B In solid slab, 250mm thick 22 m3 352.00 7,744.00

C In Beams 3 m3 352.00 1,056.00

D In parapet walls 3 m3 352.00 1,056.00

REINFORCEMENT
E High yield bar reinforcement with minimum 3,100 kg 4.31 13,361.00
characteristic strength of 460N/mm2

FORMWORK
F To sides of columns 38 m2 37.00 1,406.00

G To sides and soffits of solid slabs 87 m2 27.00 2,349.00

H To sides and soffits of beams 38 m2 24.00 912.00

J To sides of parapet wall 26 m2 35.00 910.00

Insitu concrete lintel including formwork, reinforcement


K 100 x 200 mm lintels 3 m 52.00 156.00

L 200 x 200 mm lintels 4 m 96.00 384.00

Carried to General Summary Page 4 Dhs. 30,746.00

BILL NO.03 58 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

MASONRY WORKS

Masonry Block walls


A 250mm block work, External Thermal block walls 116 m2 115.00 13,340.00

B 150mm thick; Internal Hollow block walls 30 m2 78.00 2,340.00

C 100mm thick; Internal walls 20 m2 70.00 1,400.00

D Damp proof course, under blockwalls, internal and 35.00 m 10.00 350.00
external walls

Carried to General Summary Page 5 Dhs. 17,430.00

BILL NO.03 59 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

THERMAL & MOISTURE PROTECTION

Wet area waterproofing


A Toilets & Balconies 4 m2 31.00 124.00

Roof Waterproofing
B Light weight concrete laid to slope 73 m2 21.00 1,533.00

C Torch applied 4mm thk waterproofing membrane 73 m2 50.00 3,650.00

D Torch applied 4mm thk waterproofing membrane skirting 37 m2 33.00 1,221.00

E 20 mm thk cement sand mortar 73 m2 29.00 2,117.00

F Non-weven polypropylene mesh 73 m2 8.00 584.00

G Polystyerene rigid insulation 73 m2 29.00 2,117.00

H 50mm high density extruded 73 m2 29.00 2,117.00

J 300x300x30mm White cement tiles 73 m2 55.00 4,015.00

K Dressing around pipes & Natural gravel 1 m2 50.00 50.00

GRP Lining
L GRP Lining for the water tank 114 m2 237.00 27,018.00

M Allow for thermal insulation for super-structure as per 1 LS 2,200.00 2,200.00


DM regulations

Carried to General Summary Page 6 Dhs. 46,746.00

BILL NO.03 60 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

METAL WORK / ACCESSORIES

Wrought Iron Railing (Covered under the Provisional


Item)

A Stairway Handrailing 14 m 0.00


Included in the
Bill No.06
B GRP Access Ladder & Hatch 1 LS 0.00 Provisional Sum

Carried to General Summary Page 7 Dhs. -

BILL NO.03 61 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

WOOD WORK

WARDROBES (Excluding Ironmongery, covered


under Provisional Sum)
Int. white melamine finish & Ext. Mahogany finish
A For Watchman Room - 1.40x2.60x0.60 mm 1 Item

Included in the
DOORS AND WINDOWS Bill No.06
Provisional Sum
TIMBER DOORS (Excluding Ironmongery, covered
under Provisional Sum)
B Type - D1, Single leaf Timber door 1 No

C Type D4, Single leaf Timber door 1 No

Carried to General Summary Page 8 Dhs. -

BILL NO.03 62 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES
INTERNAL FINISHES

INTERNAL BACKGROUNDS

A 50mm th. cement sand screed to receive final floor finishes 150 m2 28.00 4,200.00

B 15mm thick cement and sand plaster to the internal walls 212 m2 28.00 5,936.00

C 15mm th cement sand plaster to soffit of the slabs 150 m2 31.00 4,650.00

FLOOR FINISH
D Supply and fixing of 200x200x7mm unglazed ceramic tile 4.00 m2 97.00 388.00
with matching colour epoxy grout. (Allow a PC rate of -
Dhs. 40/m2 for supply of Ceramic) - CT-1

E Supply and fixing of 300x300/400x400x8mm unglazed 60.00 m2 97.00 5,820.00


ceramic tile (heavy Duty) with matching colour epoxy
grout. (Allow a PC rate of - Dhs. 40/m2 for supply of
Ceramic) - CT-3

F Pre-Cast Terrazzo Tread & Riser to the staircase. (Allow 24.00 m 189.00 4,536.00
a PC rate of Dhs. 150/Rm for supply of Terrazzo) TR-
3

G 300 x 300 x 30 mm Terrazzo Tiles to the landing of the 2.00 m2 79.00 158.00
staircase. (Allow a PC rate of Dhs. 50/m2 for supply of
Terrazzo) TR-1

WALL FINISH
H Supply and fixing of 200x200/ 200x300x6 mm glazed 27.00 m2 97.00 2,619.00
ceramic tile matching with epoxy grout. (PC rate for
supply - Dhs. 40/m2) CT-2

J Supply and apply Paint finish Paint - Type P1, to the 59.00 m2 13.00 767.00
cement sand plastered walls CP-2 (measured
seperately).
K Supply and apply the washable emulsion paint 147.00 m2 22.00 3,234.00
(decorative application)-WF2b

SKIRTING FINISH
L 100mm high ceramic tile skirting match the floor -(PC 17.00 m 33.00 561.00
rate for supply - Dhs. 15/m) - CT-5

Thresholds
M 100 mm wide; 30mm thick Marble threshold to match 1.00 m 150.00 150.00
with the floor colour (PC rate for supply - Dhs. 100/m)

Carried to General Summary Page 9 Dhs. 33,019.00

BILL NO.03 63 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES../
INTERNAL FINISHES…/

Ceiling Finishes (Covered under the Provisional Sum


Item)
A Supply and fix suspended gypsum board ceiling with 17.00 m2
painted. Paint type P1. Ceiling Type - SC1 Included in the
Bill No.06
B Supply and fix suspended12.5mm thick water resistance 4.00 m2 Provisional Sum
gypsum board ceiling with painted. Paint type P2.
Ceiling Type - SC2

Carried to General Summary Page 10 Dhs. -

BILL NO.03 64 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

EXTERNAL FINISHES

BACKGROUNDS
Walls
A 20mm thick Cement and sand plaster to external walls 282 m2 34.00 9,588.00

FINISHES
B EF 5 - Supply and apply Paint finish Paint - Type P3, to 282.00 m2 35.00 9,870.00
the cement sand plastered walls CP-3 (measured
seperately).

C EF 10 - Plaster grooves extra over to the External 1 LS 4,400.00 4,400.00


Plaster

Carried to General Summary Page 11 Dhs. 23,858.00

BILL NO.03 65 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.3 - SERVICE BLOCK (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

GENERAL SUMMARY

SERVICE BLOCK

A SITE WORKS Page 1 7,047.00

B SUB-STRUCTURE
Page 2 104,217.50
Page 3 33,807.00
138,024.50 138,024.50

C SUPER-STRUCTURE Page 4 30,746.00

D MASONRY WORKS Page 5 17,430.00

E THERMAl & MOISTURE PROTECTION Page 6 46,746.00

F NON-STRUCTURAL METAL WORKS Page 7 -

G WOOD WORKS Page 8 -

H INTERNAl FINISHES
Page 9 33,019.00
Page 10 -
33,019.00 33,019.00

J EXTERNAL FINISHES Page 11 23,858.00

SERVICE BLOCK SUMMARY CARRIED TO GRAND SUMMARY 296,870.50

BILL NO.03 66 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.4 - MEP WORKS

ITEM
DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

MEP WORKS
A Plumbing & Drainage works as per the drawings 1 Item 208,175.00 208,175.00

B Electrical works as per the drawings 1 Item 319,000.00 319,000.00

Heat Ventilation and Air Conditioning works (covered


C under the provisonal sum item) 1 Item 0.00 -

D Builder's works for the above MEP works 1.00 Item 96,494.95 96,494.95

Carried to Grand Summary Page 1 623,669.95

BILL NO.04 67 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.5 - EXTERNAL WORKS

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

EXTERNAL WORKS

Boundary Wall
A Construction of Boundary wall rear & either sides of the
plot as per drawings complete including earth works,
concrete works and finishes (excluding related MEP
works) 161 m 1,320.00 212,520.00

B Construction of Boundary wall Front Side as per


drawings complete including earth works, concrete works
and finishes (excluding related MEP works) 68 m 1,206.76 82,060.00

C Boundary wall Shutter Door, Pedestrian Gate & Included in the Bill
Wrought Iron grill for the front side wall. No.06 Provisional
Sum

D Hard Landscaping including lighting works Included in the Bill


No.06 Provisional
Sum

E Soil filling, External leveling, sweet soil, Included in the Bill


Softlandscaping & Irrigation works No.06 Provisional
Sum

BILL NO.05 68 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

BILL No.5 - EXTERNAL WORKS

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to Grand Summary Page 1 294,580.00

BILL NO.05 69 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi
Plot No. 376-970, Al Barsha, Dubai

BILL No.6 - PROVISIONAL SUMS

ITEM DESCRIPTION QTY UNIT RATE

PROVISIONAL SUMS (INCLUSIVE OF 10% MAIN


CONTRACTOR'S ATTENDANCE, CO-ORDINATION, OH &
PROFIT)

A Allow a Provisional Sum of Dhs 66,000 for De-watering & 1.00 P.S. 66,000.00
Shoring works
A.1 Add: Profit & Overheads 1.00 Included in the above Item-A

B Allow a Provisional Sum of Dhs. 100,000 for Sanitaryware, 1.00 P.S. 100,000.00
accessories including shower cubicles, shower doors &
mirrors
B.1 Add: Profit & Overheads 1.00 Included in the above Item-B

C Allow a Provisional Sum of Dhs 50,000 for Light Fittings 1.00 P.S. 50,000.00
C.1 Add: Profit & Overheads 1.00 Included in the above Item-C

D Allow a Provisional Sum of Dhs 27,500 for Electrical 1.00 P.S. 27,500.00
switches & sockets (Including lighting control)
D.1 Add: Profit & Overheads 1.00 Included in the above Item-D

E Allow a Provisional Sum of Dhs 130,000 for Lift including 1.00 P.S. 130,000.00
interior fitout work
E.1 Add: Profit & Overheads 1.00 Included in the above Item-E

F Allow a Provisional Sum of Dhs 16,500 for Video Intercom 1.00 P.S. 16,500.00
System
F.1 Add: Profit & Overheads 1.00 Included in the above Item-F

G Allow a Provisional Sum of Dhs 82,500 for Steam room & 1.00 P.S. 82,500.00
Sauna in Gym Changing room including doors
G.1 Add: Profit & Overheads 1.00 Included in the above Item-G

H Allow a Provisional Sum of Dhs 50,000 for Vanity Counters 1.00 P.S. 50,000.00
in Bathroom areas
H.1 Add: Profit & Overheads 1.00 Included in the above Item-H

J Allow a Provisional Sum of Dhs 22,000 for All Ironmongery 1.00 P.S. 22,000.00
for Doors, Wardrobes, Kitchen Cabinets, etc.
J.1 Add: Profit & Overheads 1.00 Included in the above Item-J
K Allow a Provisional Sum of Dhs 22,000 for WC marble back 1.00 P.S. 22,000.00
wall cladding & Top in Bathrooms
K.1 Add: Profit & Overheads 1.00 Included in the above Item-K

L Allow a Provisional Sum of Dhs 58,000 for Vehicle entrance 1.00 P.S. 58,000.00
Gate, Pedestrian Gate & Wrought Iron Railing (Front) to
Boundary wall.
L.1 Add: Profit & Overheads 1.00 Included in the above Item-L

M Allow a Provisional Sum of Dhs 50,000 for Hard 1.00 P.S. 50,000.00
Landscaping including lighting works
M.1 Add: Profit & Overheads 1.00 Included in the above Item-M
Carried Forward Page 1

BILL NO.06 70 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi
Plot No. 376-970, Al Barsha, Dubai

BILL No.6 - PROVISIONAL SUMS

ITEM DESCRIPTION QTY UNIT RATE

Brought Forward Page 2


A Allow a Provisional Sum of Dhs 50,000 for Soil Filling, 1.00 P.S. 50,000.00
External leveling, Sweet Soil, Soft Landscaping &
Irrigation works
A.1 Add: Profit & Overheads 1.00 Included in the above Item-A

B Allow a Provisional Sum of Dhs 250,000 for Aluminium and 1.00 P.S. 250,000.00
Glazing works including Mechanical room & Pump room
doors
B.1 Add: Profit & Overheads 1.00 Included in the above Item-B

C Allow a Provisional Sum of Dhs. 65,000/= Metal Works 1.00 P.S. 65,000.00
(Pipe/Glass/Wrought Iron railing for balcony, staircase
handrailng, Void area railing & Cat ladder, etc)

C.1 Add: Profit & Overheads 1.00 Included in the above Item-C

D Allow a Provisional Sum of Dhs. 150,000/= for Wardrobes 1.00 P.S. 150,000.00

D.1 Add: Profit & Overheads 1.00 Included in the above Item-D

E Allow a Provisional Sum of Dhs. 50,000/= Kitchen Cabinets 1.00 P.S. 50,000.00

E.1 Add: Profit & Overheads 1.00 Included in the above Item-E

F Allow a Provisional Sum of Dhs. 100,000/= for Timber Doors 1.00 P.S. 100,000.00

F.1 Add: Profit & Overheads 1.00 Included in the above Item-F

G Allow a Provisional Sum of Dhs. 200,000/= for Ceiling 1.00 P.S. 200,000.00
Finishes
G.1 Add: Profit & Overheads 1.00 Included in the above Item-G

H Allow a Provisional Sum of Dhs. 250,000/= for Heat 1.00 P.S. 250,000.00
Ventilation and Air Conditioning Works
H.1 Add: Profit & Overheads 1.00 Included in the above Item-H

J Allow a Provisional Sum of Dhs. 200,000/= for Swimming 1.00 P.S. 200,000.00
Pool
J.1 Add: Profit & Overheads 1.00 Included in the above Item-J

K Allow a Provisional Sum of Dhs. 50,000/= for Gym 1.00 P.S. 50,000.00
Equipments
K.1 Add: Profit & Overheads 1.00 Included in the above Item-K

L Allow a Provisional Sum of Dhs. 20,000/= for CCTV 1.00 P.S. 20,000.00
L.1 Add: Profit & Overheads 1.00 Included in the above Item-L

Carried to Grand Summary Page 2

BILL NO.06 71 / 79
Contract B.O.Q.

BILL No.6 - PROVISIONAL SUMS

TOTAL (Dhs.)

66,000.00

Included in the above Item-A

100,000.00

Included in the above Item-B

50,000.00
Included in the above Item-C

27,500.00

Included in the above Item-D

130,000.00

Included in the above Item-E

16,500.00

Included in the above Item-F

82,500.00

Included in the above Item-G

50,000.00

Included in the above Item-H

22,000.00

Included in the above Item-J


22,000.00

Included in the above Item-K

58,000.00

Included in the above Item-L

50,000.00

Included in the above Item-M


674,500.00

BILL NO.06 72 / 79
Contract B.O.Q.

BILL No.6 - PROVISIONAL SUMS

TOTAL (Dhs.)

674,500.00
50,000.00

Included in the above Item-A

250,000.00

Included in the above Item-B

65,000.00

Included in the above Item-C

150,000.00

Included in the above Item-D

50,000.00

Included in the above Item-E

100,000.00

Included in the above Item-F

200,000.00

Included in the above Item-G

250,000.00

Included in the above Item-H

200,000.00

Included in the above Item-J

50,000.00

Included in the above Item-K

20,000.00
Included in the above Item-L

2,059,500.00

BILL NO.06 73 / 79
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.
Plot No. 376-970, Al Barsha, Dubai

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

GRAND SUMMARY

PRELIMINARIES BILL NO.01 870,000.00

MAIN VILLA - CIVIL WORKS BILL NO.02 1,944,775.55

SERVICE BLOCK -CIVIL WORKS BILL NO.03 296,870.50

MEP WORKS BILL NO.04 623,669.95

EXTERNAL WORKS BILL NO.05 294,580.00

PROVISIONAL SUMS BILL NO.06 2,059,500.00

CARRIED TO FORM OF TENDER 6,089,396.00

EXCLUSIONS:

MATV /SMATV SYSTEM (except for containment)


TELEPHONE/DATA EQUIPMENTS (except for containment)
DEWA PERMANENT CONNECTION CHARGES
WATER AND KWH METERS
FF&E WORKS INCLUDING DECORATIVE LIGHTS
HOME AUTOMATION SYSTEM
KITCHEN APPLIANCES/WHITE GOODS

GRAND SUMMARY 74 / 79
TENDER SUMMARY SHEET

Tender For : G+1 VILLA + SERVICE BLOCK FOR MR . ABDUL GHAFFAR SAYED MOHD AL HASHIMI

Gen Manager: Tender No : Traditional

Building Costs %

Tender B/A B/A Offered Buying Totals


Cost Add Deduct Discount Discount
% Sum

Material 1,174,400 1,174,400 19.29


Labour 633,221 633,221 10.40

Sub-contract 582,638 582,638 9.57


Direct Plant / Equipment / Tools 79,458 79,458 1.30
Prime cost rates 402,254 402,254 6.61

Durables

2,871,970 Sub Total 2,871,970 47.16

Contingency / Risk %

Building Costs Total = 2,871,970 2,871,970 47.16

On Costs

Tender B/A B/A Totals


Cost Add Deduct

Prelims 790,909 790,909 12.99

Design Fees

Planning & Building Regulation Fees

On Costs Total = 790,909 790,909 12.99

TOTAL BUILDING COSTS AND ON COSTS 3,662,879 60.15

Contribution

Contribution (as % of Total Building Costs & On Costs) 10.00 % 366,288 6.02

Others

366,288 366,288 6.02

Abnormals

Added Margin Totals


% Sum

Nett Nominated Sub-contractors + =

Nominated Sub-contractors + =

Nominated Suppliers + =

Provisional Sums + =

Dayworks + =

frayland Provisional Sums 1,872,273 + 10.00 187,227 = 2,059,500 33.82


Clients Contingency + =

Fixed Price Allowance + =

Sub Total 2,059,500 2,059,500 33.82

Adjustments 705

TOTAL TO FORM OF TENDER 6,089,372 100.00

Executive Summary
Gross Nett -
Added Margin 187,227 3.27% Floor Area = 15,895 Sqft
Anticipated Margin 366,288 6.02% 6.40% Cost Per Sqft = 383.09 Per Sqft
Overall Margin 553,515 9.09 9.67% Programme = 156 Weeks (3 years)
Rate of Spend = 39,034.44 Per Week

DATE : February 3, 2012

Frayland Construction and Interiors 3/31/2014


LAST UPDATED ON 10/3/2010
Outside
No Description Company Unit Grade Basic Temp Pump
Rate
Rate
Labour CONCRETE
1 Helper 12.00 10.00 Dhs/Hrs OPC CONMIX READY MIX
2 Mason BP 12.00 12.00 Dhs/Hrs C30/20 230.00 20.00 30.00
3 MasonBPCM 12.00 14.00 Dhs/Hrs C40/20 245.00 20.00 30.00
4 Carpenter 12.00 14.00 Dhs/Hrs
5 Steel Fixer 12.00 14.00 Dhs/Hrs MSRPC
6 Painter 12.00 16.00 Dhs/Hrs C20/20 230.00 20.00 30.00
7 Electricians 12.00 18.00 Dhs/Hrs
8 Electrical Helpers 12.00 12.00 Dhs/Hrs SRC
9 Plumbers 12.00 14.00 Dhs/Hrs C30/20 230.00 20.00 30.00
C40/20 250.00 20.00 30.00
Material
1 OP Cement 16.50 Dhs/Bag
2 SR Cement 20.00 Dhs/Bag
3 Sand 65.00 Dhs/m3
4 8" Solid block 4.10 Dhs/No BISHAH STEEL (CUT & BENT)
5 8" Hollow block 2.60 Dhs/No 8 mm 3,000.00 Tonne Turkey
6 6" Hollow block 2.50 Dhs/No 10 - 32 mm 3,000.00 Tonne Turkey
7 4" hollow block 2.20 Dhs/No BRC-A-142
8 10" Hollw block 4.50 Dhs/No
9 6" Solid block 4.00 Dhs/No
10 4" Solid block 3.50 Dhs/No PLASTER AND BLOCK ACCESSORIES
11 10' Solid Block 6.50 Dhs/No G.I Wall ties / General 1.00 Dhs/No
12 8" Termal Block 5.00 Dhs/No G.I Block ladder 11.50 Dhs/No
13 10" Thermal Block 5.60 Dhs/No G.I Block mesh 3.00 Dhs/m2
14 12"Thermal block 6.80 Dhs/No G.I Cavity wall ties 1.00 Dhs/No
15 Com. plywood 18mm 94.00 sheet S.S wall ties / General 3.20 Dhs/No
16 Marine plywood 18mm 135.00 sheet S.S Block ladder 11.50 Dhs/No
17 White wood 1,000.00 m3 S.S Block mesh 5.70 Dhs/m2
18 wired nails 20.00 8kg S.S Cavity wall ties 3.20 Dhs/No
19 White cement 28.00 Dhs/Bag G.I Corner mesh 3.00 Dhs/m
20 Road Base 55.00 Dhs/m3 G.I plaster mesh/coil lath 1.50 Dhs/m
21 Fenomastic Gold 313.00 Dhs/5USG G.I Angle bead 1.00 Dhs/m
22 Fenomastic Matt (STD) 160.00 Dhs/5USG G.I Plaster stop bead 1.40 Dhs/m
23 Fenomastic Matt (SPL) 205.00 Dhs/5USG S.S.Plaster mesh/coil lath 5.50 Dhs/m
24 Fenomastic Primer White 74.00 Dhs/5USG S.S Angle bead 3.72 Dhs/m
25 Fenomastic S/g Silk (SPL) 217.00 Dhs/5USG S.S Plaster stop 5.90 Dhs/m
26 PVA Primer 57.00 Dhs/5USG
27 Pengard HB (A+B) 391.00 Dhs/20L
28 Stucco 57.00 Dhs/5USG
29 Durathane Comp (A+B) 475.00 Dhs/20L
30 Acrylic Primer 74.00 Dhs/5USG
31 Texo Compound 103.00 Dhs/5USG
32 Pengauard Primer A+B 391.00 Dhs/20L
33 Futura A+B 727.00 Dhs/17.5L
34 Thinner No.17 147.00 Dhs/20L
35 Thinner No.10 222.00 Dhs/20L
36 Sweet water 5000 gal 600.00 Dhs/trip
37 Salt water 3000 gal 600.00 Dhs/trip
38 Filling sand / Subkha 35.00 Dhs/m3
39 Kerb Stone 21.00 Dhs/Lm
40 Pavers 36.00 Dhs/m2

MACHINERY Fuel consumption


1 Shovel 150.00 Dhs/Hrs 35 galons per 10 hrs day
2 Shovel & Truck (20m3) 400.00 Dhs/Trip N/A
3 Tipper Truck Hire (20m3) 375.00 Dhs/Trip N/A
4 Tipper Truck Hire (20m3) 100.00 Dhs/Hrs 20 galons per 10 hrs day
5 Roller compactor 200.00 Dhs/Day 20 galons per 10 hrs day
6 Plate Compactor 90.00 Dhs/Day 10 galons per 10 hrs day
7 JCB / CAT Excavator 80.00 Dhs/Hrs 30 galons per 10 hrs day
8 JCB with hammer 120.00 Dhs/Hrs 30 galons per 10 hrs day
9 Mobile crane 35 ton 180.00 Dhs/Hrs 35 galons per 10 hrs day
10 Bob cat 50.00 Dhs/Hrs 15 galons per 10 hrs day
11 Deisel 9.80 Dhs/I gal
12
13
14
15
16
17
Boundary wall
Amount Dhs.
Item Description Qty Unit Unit Rate

Type-1 (for1 meter)

Concrete Substructure

Excavation

A Up to 1m 1.00 m3 57.46 57.46

Back Filling
B Selected excaavated material backfilled around 0.60 m3 27.33 16.40

C Surplus of excavated material to be disposed off out site 0.40 m3 28.40 11.36

Anti-termite Treatment
(Horizontal and vertical surfaces upto finished ground floor level)
Anti-termite treatment; to underside of the
E
foundations, tie beams and ground floor slabs 3.00 m2 3.00 9.00
Boundary wall
Amount Dhs.
Item Description Qty Unit Unit Rate

CONCRETE WORK

Concrete Substructure (contd)

Plain sulphate-resisting concrete

A In blinding 0.10 m3 373.23 37.32

Reinforced sulphate-resisting concrete; Mix C40 / 20


B In foundations 0.15 m3 384.22 57.63

C In neck columns 0.03 m3 390.28 10.93

D In tie beams 0.12 m3 384.22 46.11

Formwork
J To foundations 0.60 m2 33.43 20.06

K To neck columns 0.56 m2 65.51 36.69

L To tie beams 1.40 m2 55.08 77.11

Reinforcement
Q High yield bar reinforcement of various diameters 53.64 kg 3.34 179.16
Boundary wall
Amount Dhs.
Item Description Qty Unit Unit Rate

CONCRETE WORK (Cont'd)

Concrete Substructure (Contd)

Sundries
A 02 coats of bituminous paint as specified on concrete
and blockwork, in contact with the ground soil
4.68 m2 5.00 23.40

B 1000 Gauge polythene damp proof membrane; to


underside of foundations, tie beams (in contact with
ground soil) and ground floor slabs 1.00 m2 2.85 2.85

Superstructure

Reinforced OPC concrete; Mix C40 / 20

B Lintel In beams 0.04 m3 373.01 14.92

C In columns 0.08 m3 385.13 30.81

Formwork
M To sides and soffits of beams 0.60 m2 66.44 39.86

N To columns 1.60 m2 69.14 110.62

Reinforcements

A Various diameters 24.00 kg 3.33 79.92

Block work
Hollow blockwalls

C 200mm Thick 2.00 m2 80.05 160.10

Finishes

Cement and sand plastering; finished with steel float,


including expanded metal lath reinforcing strips, angel
beads, corner beads, stop beads.

A On walls; to receive paint 4.80 m2 28.21 135.41

Painting

Coating system; "Profile Décor", consisting of one


coat acrylic Emulsion / Tex Primer, one coat Profile
Décor (Trowel applied), with top Jotashield coat from
M/s Jotun or other equal and approved

C On plastered wall and columns 4.80 m2 30.00 144.00

TOTAL SUMMARY OF TYPE-A B/W 1,301.12

TOTAL LENGTH OF WALL 314.00 m


THEREFORE 1.00 m 4.14

AV/S1.1