Name of work : Modernization of chennai Airport Phase -II, Chennai SH : Connectivity to Metro rail city

side and Provision for Walkalatos at chennai Airport.


I - Beam Leves at Top
Hight of
Back sight Inter sight Fore sight RL Remarks
collimation
0.995 101.495 BM +100.50 Domistic
1.695 99.800 M37-36 north side
1.680 99.815 M36-35
1.695 99.800 M35-34
1.685 99.810 M34-33
1.695 99.800 M33-32
1.705 99.790 M32-31
1.710 99.785 M31-30
1.695 99.800 M30-29
1.680 99.815 M29-28
1.685 99.810 M28-27
1.715 99.780 M27-26
1.450 1.690 101.255 99.805 M26-25
1.450 99.805 M25-24
1.455 99.800 M24-23
1.465 99.790 M23-22
1.475 99.780 M22-21
1.500 99.755 M21-20
1.480 99.775 M20-19
1.475 99.780 M19-18
1.475 99.780 M18-17
1.450 99.805 M17-16
0.990 101.490 BM +100.50 International
1.680 99.810 M39-40 north side
1.675 99.815 M40-41
1.650 99.840 M41-42
1.675 99.815 M42-43
1.670 99.820 M43-44
1.675 99.815 M44-45
1.675 99.815 M45-46
1.685 99.805 M46-47
1.680 99.810 M47-48
1.660 99.830 M48-49
1.590 1.670 101.410 99.820 M49-50
1.595 99.815 M50-51
1.575 99.835 M51-52
1.595 99.815 M52-53
1.620 99.790 M53-54
1.605 99.805 M54-55
1.585 99.825 M55-56
1.570 99.840 M56-57
1.580 99.830 M57-58
Hight of
Back sight Inter sight Fore sight RL Remarks
collimation
1.590 99.820 M58-59
1.575 99.835 M59 End
0.995 101.495 BM +100.50 Domistic
1.675 99.820 M37-36 south side
1.695 99.800 M36-35
1.710 99.785 M35-34
1.720 99.775 M34-33
1.700 99.795 M33-32
1.710 99.785 M32-31
1.700 99.795 M31-30
1.685 99.810 M30-29
1.685 99.810 M29-28
1.680 99.815 M28-27
1.685 99.810 M27-26
1.450 1.690 101.255 99.805 M26-25
1.465 99.790 M25-24
1.485 99.770 M24-23
1.485 99.770 M23-22
1.480 99.775 M22-21
1.495 99.760 M21-20
1.475 99.780 M20-19
1.495 99.760 M19-18
1.485 99.770 M18-17
1.470 99.785 M17-16
0.990 101.490 BM +100.50 International
1.680 99.810 M39-40 south side
1.675 99.815 M40-41
1.670 99.820 M41-42
1.665 99.825 M42-43
1.670 99.820 M43-44
1.685 99.805 M44-45
1.680 1.660 99.810 M45-46
1.690 1.670 99.800 M46-47
1.660 99.830 M47-48
1.640 99.850 M48-49
1.590 1.665 101.415 99.825 M49-50
1.590 99.825 M50-51
1.590 99.825 M51-52
1.605 99.810 M52-53
1.620 99.795 M53-54
1.615 99.800 M54-55
1.600 99.815 M55-56
1.575 99.840 M56-57
1.595 99.820 M57-58
1.585 99.830 M58-59
1.595 99.820 M59 End 0.395
Hight of
Back sight Inter sight Fore sight RL Remarks
collimation
8383.640 0.1975
99.805
FFL (+) 100.000
0.195
FFL (+) 100.00 Low 99.755 Dif 0.245
B.M (+) 100.50 High 99.850 Dif 0.150

8383.640 99.805238095
Name of work : Modernization of chennai Airport Phase -II, Chennai SH : Connectivity to Metro rail city
side and Provision for Walkalatos at chennai Airport.
I - Beam Leves at Top
Hight of
Back sight Inter sight Fore sight RL Remarks
collimation

0.91 101.41 BM +100.50 Domistic


1.590 99.820 M37 north side
1.605 99.805 M36
1.580 99.830 M35
1.600 99.810 M34
1.595 99.815 M33
1.615 99.795 M32
1.610 99.800 M31
1.595 99.815 M30
1.590 99.820 M29
1.580 99.830 M28
1.600 99.810 M27
1.590 99.820 M26
1.46 1.585 101.285 99.825 M25
1.495 99.790 M24
1.490 99.795 M23
1.500 99.785 M22
1.510 99.775 M21
1.505 99.780 M20
1.495 99.790 M19
1.490 99.795 M18
1.500 99.785 M17
1.505 99.780 M16

1.000 101.500 BM +100.50 International


1.680 99.820 M39 north side
1.675 99.825 M40
1.700 99.800 M41
1.665 99.835 M42
1.670 99.830 M43
1.665 99.835 M44
1.680 99.820 M45
1.670 99.830 M46
1.675 99.825 M47
1.685 99.815 M48
1.655 99.845 M49
1.650 99.850 M50
1.640 99.860 M51
1.645 99.855 M52
1.645 99.855 M53
Hight of
Back sight Inter sight Fore sight RL Remarks
collimation
1.650 99.850 M54
1.665 99.835 M55
1.625 99.875 M56
1.620 99.880 M57
1.640 99.860 M58
1.63 99.870 M59 End

0.91 101.41 BM +100.50 Domistic


1.600 99.810 M37 south side
1.595 99.815 M36
1.605 99.805 M35
1.630 99.780 M34
1.600 99.810 M33
1.625 99.785 M32
1.600 99.810 M31
1.600 99.810 M30
1.605 99.805 M29
1.590 99.820 M28
1.610 99.800 M27
1.600 99.810 M26
1.46 1.57 101.300 99.840 M25
1.500 99.800 M24
1.500 99.800 M23
1.495 99.805 M22
1.500 99.800 M21
1.495 99.805 M20
1.510 99.790 M19
1.500 99.800 M18
1.490 99.810 M17
1.495 99.805 M16

1.000 101.500 BM +100.50 International


1.685 99.815 M39 south side
1.680 99.820 M40
1.670 99.830 M41
1.665 99.835 M42
1.670 99.830 M43
1.685 99.815 M44
1.685 99.815 M45
1.680 99.820 M46
1.665 99.835 M47
1.660 99.840 M48
1.650 99.850 M49
1.650 99.850 M50
Hight of
Back sight Inter sight Fore sight RL Remarks
collimation
1.660 99.840 M51
1.655 99.845 M52
1.650 99.850 M53
1.670 99.830 M54
1.685 99.815 M55
1.630 99.870 M56
1.620 99.880 M57
1.650 99.850 M58
1.650 99.850 M59 End

FFL (+) 100.00 Low 99.755 Dif 0.245


B.M (+) 100.50 High 99.880 Dif 0.120