site clearing

excavation & cart away

formwork

re-bar work

concreting

blockwork

ceramic tiling work

parquet

plastering

gypsum plastering and painting

false ceiling

install ppr pipes for cold & hot water supply to all sanitary fixtures

dia.15mm

dia. 20mm

dia. 25mm

dia. 32mm

fix bronze gate valve of approved standards complete with all accessories

dia. 15mm

dia. 20mm

dia. 25mm

dia. 32mm
fix toilet paper holder with metal roller complete with fastening screw

wash down urinary basin complete with all accessories.

fix standard towel hanger including fastening screw & the necessary accessories.

fix soap holder in white vitreous china

mount on wall as indicated on floor plan 3kg fire hydrant complete with all necessary accessories

floor drain made of enamelled cast iron, complete with all accessories

install waste & vent pipe made of rigid pvc

dia. 50mm

dia. 110

fix crystal mirror

fix electric water heater of 80 litre capacity

fix shower basin made of enamelled cast iron white painted size 700*700mm

fix double bowl type stainless kitchen sink

fix jacuzzi made of enamelled cast iron white painted

construct 5m3 ground water reservoir made of fibre-glass

fix electric driven pump of approved quality

mercury level switch with all accessories for electric pump

Electrical Installation

light point

light switch (16A/1P)through pvc insulated conductor

flush mounted single gang switch dia16mm including junction box


flush intermediate switch conductor of 2*2 sqmm dia16mm conduit

light fitting & lamps

socket outlet

telephone point

TV system

power cable

distribution board
Includes materials Currency Rate Unit of measurement
n/a ETB 20 birr/m2

n/a ETB 150 birr/m3

yes ETB 300 birr/m2

yes ETB 31 birr/kg

yes ETB 3550 birr/m3

yes ETB 450 birr/m2

yes ETB 330 birr/m2

yes ETB 850 birr/m2

yes ETB 345 birr/m2

yes ETB 70 birr/m2

yes ETB 300 birr/m2

yes ETB 102 birr/linear meter

yes ETB 102 birr/linear meter

yes ETB 165 birr/linear meter

yes ETB 175 birr/linear meter

no ETB 100 birr/piece

no ETB 140 birr/piece

no ETB 175 birr/piece

no ETB 200 birr/piece


no ETB 28 birr/piece

no ETB 242 birr/m2

no ETB 28 birr/piece

no ETB 28 birr/piece

no ETB 28 birr/piece

no ETB 60 birr/piece

yes ETB 50 birr/linear meter

yes ETB 80 birr/linear meter

no ETB 66 birr/piece

no ETB 280 birr/piece

no ETB 330 birr/piece

no ETB 330 birr/piece

no ETB 850 birr/piece

no ETB 825 birr/piece

no ETB 1650 birr/piece

no ETB 385 birr/piece

yes ETB birr/piece

yes ETB birr/piece

yes ETB birr/piece


no ETB birr/piece

no ETB birr/piece

no ETB birr/piece

no ETB birr/piece

no ETB birr/piece

no ETB birr/linear meter

no ETB birr/piece
Executive summary Total
Cost

A Estimated Construction Cost:-

Sub - Total US$ 0

B Preliminaries (15%) US$ 0

C Design and construction contingency risk (5%) 0

Base Building Cost US$ 0

D Professional fees - Allowance (14%) 100

E Insurance during Construction (0.25%) 0

F Disbursements (5% of Fees) 0

NET PROJECT COST (EXCLUDING IVA) US$ 0

G Land Cost 0

H License fees 0

I Development Fees (5%) 0

J Building Plan approvals 0

K Government Concession Fees 0

L Rates & Taxes 0

M Transfer duties 0

Total Project Cost US $ 0