BOQ-EQUIPMENTS

SN Item Specifications Nos Total Remarks


Type Capacity Unit Head Duty Standby No of Equip
1 Packaged Inlet works Packaged in SS 482 m3/hr Mwc 2 1 3 before Balancing Tank
Fine Bar Screen , 6 mm
Grit Removal
Grease Removal
2 Submersible SBR feed Pumps Submersible 156 m3/hr 15 2 1 3
3 Balancing Tnak Blower PD Twin lobe 1500 m3/hr 1 1 2
4 Diffusers, Coarse Bubble- Balancing aTank 10 m3/hr 150 0 150 NOTE 1
5 SBR Aeration Blowers PD twin lobe 5062 nm3/hr 6 3 1 4
6 Submersible Mixers Submersible 11.12 KW 9 0 9 Suitable for Tank depth of 6 m
7 Fine Bubble Diffusers 4.5 m3/hr 3375 0 3375 Water depth 5 m, diff eff considered 6%/m
8 Decant Mechanism 603 m3/hr 3 0 3 Will be part of SBR Vendor scope
9 SAS pumps 81.66524 m3/hr 15 3 3 6 Submersible, located inside SBR
Chlorination System 2 2
10 Chlorine Dosing Pumps-Prechlornation 50.76 LPH 1 1 2 Dosing Pumps, Pulsation dmapner check valves etc
11 Chlorine Dosing Pumps-Residual chlornation 12.69 LPH 1 1 2 Dosing Pumps, Pulsation dmapner check valves etc
12 HYPO Stotage Tank 18 m3 1 0 1
13 Disc Filitration Rate 339.05 m 1 1 2
14 Filter Feed Pumps, 339.05 m3/hr 10 1 1 2
Both part of Vendor PACKAGE
15 Backwash Pumps, 20 mwc 27.00 m3/hr 75 1 1 2
16 SAS Tank Aeration Blowers Twin Lobe PD 599 m3hr 6 1 1 2
17 Coarse Bubble Diffusers- SAS Tank 10 m3hr 60 60
Progressive
18 Thickener Feed Pumps, 0.8 % Solids 37 m3/hr 20 1 1 2 0.8 % solids
Cavity type
19 Thickening Centrifuge 37 m3/hr 1 1 2
Polymer dosing system for the above including
20 Preparation and Dosing Tank , duty standby Pumps
panel etc
Progressive
21 Digester Feed Pumps 3% solids 8 m3/hr 35 1 1 2 3% solids
Cavity type
Polymer dosing system for the above including
22 Preparation and Dosing Tank , duty standby Pumps
panel etc
23 Disgester Tank Aeration Blowers Twin Lobe PD 8011 nm3hr 6 1 1 2 REV1 Change
24 Coarse Bubble Diffusers-Digesters 10 m3hr 801 801
Progressive
25 Decanter Feed Pumps, 3 % solids 5 m3/hr 1 1 2
Cavity type
26 Decanter Centrifuge 5 m3/hr 1 1 2
Polymer dosing system for the above including
Preparation and Dosing Tank , duty standby Pumps
panel etc
27 Works return Pumps Submersible 61 m3/r 15 1 1 2
28 OCU units
Balancing Tank 16500 m3/hr
Packaed Inlet works 3000 m3/hr
SAS Holding tank 9495 m3/hr
For Sludge Thickening and Dewatering Bldg 20x15x6 18000 m3/hr If sludge requirment of Class B is cancelled then
if ONLY Sludge Thickening then 15x10X6 9000 m3/hr only dewatering
28 Grease Pumps 5 m3/hr 20 2 1 3 REV1 Change
29 TSE transfer Pumps Submersible 339.05 m3/hr 20 1 1 2 REV1 Change
Note
If Sludge Class B Requirement deleted then highlighted items in Yellow to be also deleted

BARWA BOQ
PIPING
SN From - to Flow,m3/h V, m/s Size SIZE Length MOC Remarks
LIQUID- RAW SEWAGE, TSE
1 Gravity flow from C/S to F/S 482 0.75 476.6 500 75 To ber confirmed Per QCS
Gravity flow from Grit to BT 482 0.75 476.6 500 50

2 SBR feed Pump A-Duty 156 1.80 175 200 15


SBR feed Pump B-Assit 156 1.80 175 200 15
SBR feed Pump B-Standby 156 1.80 175 200 15
Common dishrge line 313 1.80 248 250 50

3 Raw Sewage Inlet to SBR 1 156 2 175 200 40


Raw Sewage Inlet to SBR 2 156 2 175 200 40
Raw Sewage Inlet to SBR 3 156 2 175 200 40

4 Treated Sewage Outlet of SBR-1 603 0.60 596 600 20


Treated Sewage Outlet of SBR-2 603 0.60 596 600 50
Treated Sewage Outlet of SBR-3 603 0.60 596 600 75

5 Common Treated Sewage Outlet to CCT 603 0.60 596 600 30

6 Suction of Filter Feed Pumps 339 1.80 258 300 20


Dischrage of Filter Feed Pumps 339 2.00 245 250 20

7 Suction Backwash Pumps 27 1.80 73 80 10


Discharge of Backwash Pumps 27 2.00 69 80 10

8 WAS Pumps A- Suction (D+S) 82 1.00 170 200 10 (Only if PD Pump selected
WAS Pumps B- Suction (D+S) 82 1.00 170 200 10 (Only if PD Pump selected
WAS Pumps C- Suction (D+S) 82 1.00 170 200 10 (Only if PD Pump selected

WAS Pumps A-Discharge (D+S) 82 1.70 130 150 100


WAS Pumps B-Discharge (D+S) 82 1.70 130 150 100
WAS Pumps C-Discharge (D+S) 82 1.70 130 150 100

9 Thickener Feed Pumps Suction A/B 37 1.00 115 150 20 PD pump


Thickener Feed Pumps Discharge A/B 37 1.00 115 150 20
Common discharge 37 1.00 115 150 75

10 Digester Feed Pumps Suction A/B 8 0.50 75 80 20


Digester Feed Pumps Discharge A/B 8 0.75 61 80 20
Common discharge 8 1.00 53 80 75

11 Decanter Feed Pumps Suction A/B 5 0.50 60 80 20


Decanterr Feed Pumps Discharge A/B 5 0.75 49 80 20
Common discharge 5 1.00 43 80 75

12 Works Return Pumps Discharge 61 1.70 112 150 100

13 Grease Pumps 5 0.50 59 80 100


14 TSE Pipeline from Disc filter to TSE tank 339 0.50 490 500 100 Gravity

15 Tse transfer line (Pressure) 339 2.00 245 250 100

AIR PIPING
14 Balancing Tank Blower Discharge 1500 18.00 172 200 120
Drop pipes in Balancing tank 10 150 18.00 17 25 100

15 Air Inlet to SBR-1 5062 18.00 315 350 100


Air Inlet to SBR-2 5062 18.00 315 350 100
Air Inlet to SBR-3 5062 18.00 315 350 100
Common HEADER 15186 18.00 546 600 75

16 Drop pipes in SBR-1 , EACH 6 5062 18.00 129 150 60


Drop pipes in SBR-2, EACH 6 5062 18.00 129 150 60
Drop pipes in SBR-3 , EACH 6 5062 18.00 129 150 60

17 SAS TANK Blower Discharge 599 18.00 108 150 50


Drop pipes in SAS Tanks 6 599 18.00 44 50 100

18 Sludge Digestors blower discharge 8011 18.00 397 400 50


Drop pipes in Sludge digestor 4 8011 18.00 198 200 100

19 OCU Piping
Balancing Tank 16500 10.00 764 800 50
Packaed Inlet works 3000 10.00 326 350 50
SAS Holding tank 9495 10.00 579 600 50
For Sludge Thickening and Dewatering Bldg 18000 10.00 798 800 50
if ONLY Sludge Thickening then 9000 10.00 564 600 50

Add Fittings cost 20 % of the material cost


Note
If Sludge Class B Requirement deleted then highlighted items in Yellow to be also deleted
MOC ARE INDICATIVE TO BE CHECKED WITH SPECS AND COMPATIBILITY
VALVES
MOC ARE INDICATIVE FO BE CHECKED WITH QCS
SN Location SIZE MOC Type Operation Nos Remarks
LIQUID- RAW SEWAGE, TSE Motorised - M
1 Gravity flow from C/S to F/S 500 Geared 3 GV- Gate Valve
Gravity flow from Grit to BT 500 Geared 3

2 SBR feed Pump A/B/C Delivery 200 SS-Disc GV 3


NRV for Above 200 SS -Disc 3

3 Raw Sewage Inlet to SBR 1,2,3 200 SS-Disc GV M 3

4 Treated Sewage Outlet of SBR-1,2,3 600 SS-Disc BFV M 3

6 Common Suction of Filter Feed Pumps 300 SS -Disc BFV 1


Isolation valves in individual suctions 300 SS -Disc BFV 2
Dischrage of Filter Feed Pumps 250 SS - Disc BFV 2
NRV for Above 250 SS - Disc 2

7 Backwash Pumps-Common Suction 80 CI BFV 1 Not applicable if submersible


Backwash Pump -Isolation valves 80 CI BFV 2 Not applicable if submersible
Backwash Pumps-Discharge of 80 CI BFV 2
NRV for Above 80 CI 2

8 WAS Pumps isolation valves 200 CI GV 6 if Progressive cavity pump used


WAS Pumps - Suction 200 CI GV 6 if Progressive cavity pump used
WAS Pumps Discharge 150 CI GV 6
NRV for above 150 CI 6
PRV valves for above 80 CI 6 if Progressive cavity pump used

9 Thickener Feed Pumps Suction A/B 150 CI GV 2


Thickener Feed Pumps Discharge A/B 150 CI GV 2
NRV for above 150 CI 2
PRV valves for above 80 CI 2

10 Digester Feed Pumps Suction A/B 80 CI GV 2


Digester Feed Pumps Discharge A/B 80 CI GV 2
NRV for above 80 CI 2
PRV valves for above 50 2

11 Decanter Feed Pumps Suction A/B 80 CI GV 2


Decanterr Feed Pumps Discharge A/B 80 CI GV 2
NRV for above 80 CI 2
PRV valves for above 50 CI 2

12 Works Return Pumps Discharge 150 CI GV 2


Works Return Pumps Discharge 150 CI 2

13 Grease Pumps Suction 80 CI GV 3


Grease Pumps Discharge 80 CI 3

14 TSE Pipeline from Disc filter to TSE tank 500 CI BFV Geared 1 If by Gravty

Tse transfer line (Pressure)- Dsicharge 250 CI GV 2 If by Pump


250 CI 2
AIR
15 Balancing Tank Blower Discharge 200 SS BFV 2
NRV for above 200 SS 2
PRV valves for above 50 2
Drop pipes in Balancing tank 25 Ball/Globe 10

16 SBR Aeration Blowers 350 SS BFV Geared 4


standby to remaining islotain valves ( 350 SS BFV Geared 4
NRV for above 350 SS Geared 4
PRV valves for above 80 4
Blow off valves 150 4
Air Inlet to SBR-1/2/3 350 SS BFV Motorized 3

17 Drop pipes in SBR-1 /2/3 150 SS BFV Maual 18

18 SAS TANK Blower Discharge 150 SS BFV Manual 2


NRV for above 150 SS Manual 2
PRV valves for above 50 2
Drop pipes in SAS Tanks 50 SS BFV BFV/Ball 6

19 Sludge Digestors blower discharge 400 SS BFV Geared 2


NRV for above 400 SS geared 2
PRV valves for above 80 2
Blow off valves 150 SS 2
Drop pipes in Sludge digestor 4 200 SS BFV 4

20 OCU Piping Dampner


Packaed Inlet works 350 3
SAS Holding tank 600 1
For Sludge Thickening and Dewatering Bldg 800 1
if ONLY Sludge Thickening then 600 1
Add 10 % for unforeseen Valves