Id Label Eleva Status Discharge Pump Time Head (Design) tion (m³/h) Head (Delay until (m) (m) (m) Shut Down) (sec) 66 PMP-1 90.0 On 417.59 24.86 10 26.0 72 PMP-2 90.0 On 417.50 24.87 10 26.0 90 PMP-3 90.0 Off 0.00 0.00 10 26.0
Bentley Systems, Inc. Haestad Methods Bentley HAMMER V8i (SELECTseries 1)
Phase 1 Flow 814 Cu m per hr th one pipe.wtg Solution Center [08.11.01.32] 20/10/2010 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666