1 Check Deflection

Due Point Load

20 kN

0.5125 m

0.125 m 0.5 m

Span = 0.513 m
P1 = 20 kN
E = 210000 N/mm2
I = 8707 cm4
fy = 275 N/mm2

Check for deflection Under Service Load

Due Point Load

Service Live Load Deflection in the beam


D = Pl3/3EI = 0.049 mm
Permissible deflection

L/360 = 1.424 mm OK

2 Design Calculation of Lifting Lug

Load on Lifting Lugs = 40 kN


Total Vertical Reaction (Factored Load) = 54 kN
No of lug plate = 2 Nos
Load each one Lug plate = 27 kN

1a Tension on Lug
t = 20 mm
h = 200 mm
hole = 60 mm
A = 2800 mm2
fy = 275 N/mm2
Tension capacity of Hook = 770 kN OK

1b Shear on Lug

h = 40 mm
t = 20 mm
hole = 60 mm
Av(net) = 800 mm2
fu = 500 N/mm2
Shear resistance
VRd,net = Av,net(fu/√3)/ɼM2 = 184.75 kN OK
1c Check Connection welding (Thick 6mm)

length of weld = 250.00 mm


Ultimate tensile strength of S355 steel, f u = 500.00 N/mm2
Correlation factor, βw = 0.85
Throat thickness of weld, ɑ = 10.00 mm
Effective length of weld, l-2ɑ = 230.00 mm
Partial safety factor for weld, ɼM2 = 1.25 N/mm2
Design resistance of weld, Fw,RD = fvw,dɑ
fvw,d = (fu/√3)/(βwɼM2)
fvw,d = 271.69 N/mm2
Fw,RD = 2716.9 N/mm
Vw,RD = 624.90 kN OK