Type:Stage/Floor WiseCheck List:MS Staircase Hand RailingGroup:During WorkCoverage:st 1Drawing No:naMaker Representing:G.N Infra ProjectsChecker Representing:Konark BuildersRFI No:KNB/KNV/T4/3334-2/3Raised Date:19/09/2019 04:09 PMStatus:Cleared within 7 day Mak Entere Ente Quest Answ Rem Ima Ima Ima er d Date red ion er ark ge1 ge2 ge2 Time Vith 19/09/ 4:07 Hand Confor al 2019 PM Rail mity Gaik section wad s Fabrica ted to correct lengths and heights as require d for fixing from flight to flight and over landing s Vith 19/09/ 4:07 Wts of Confor al 2019 PM Fabrica mity Gaik ted wad Hand Rail section s found correct (wt / sq.m) as per dwgs Vith 19/09/ 4:07 All Confor al 2019 PM section mity Gaik s and wad Base plates used within Fabrica ted Hand Rail section s are of require d Dia, Gauge, Size and Shape as specifi ed on dwgs Vith 19/09/ 4:07 Horizo Confor al 2019 PM ntal mity Gaik level, wad vertical plumb, inclinati ons and other fabricat ed shapes of section s found correct and as per dwg Vith 19/09/ 4:07 No Confor al 2019 PM defects mity Gaik like wad bends, twists, local dents observ ed in membe rs of Fabrica ted Hand Railing section s Vith 19/09/ 4:07 All Confor al 2019 PM welds mity Gaik well wad ground ed, minor weld cracks filled and no weld spatter observ ed anywh ere Vith 19/09/ 4:08 Wall NA al 2019 PM Side Gaik Hand wad Railing fixed at correct height from treads with spacin g of bracket s and saddle s as per dwg. Vith 19/09/ 4:08 Mid NA al 2019 PM Hand Gaik Railing wad fixed to RCC Stairca se Treads and landing s to have correct height from Finishe d treads and FFL afterwa rds as per dwg. Vith 19/09/ 4:08 Any Confor al 2019 PM other mity Gaik observ wad ation