RFI Detail 

Client:Konark BuildersProject:Konark VirtueStructure:Tower 4Stage:Floor 3Work


Type:Stage/Floor WiseCheck List:MS Staircase Hand RailingGroup:During WorkCoverage:st 1Drawing
No:naMaker Representing:G.N Infra ProjectsChecker Representing:Konark BuildersRFI
No:KNB/KNV/T4/3334-2/3Raised Date:19/09/2019 04:09 PMStatus:Cleared   within 7 day   
 Mak  Entere  Ente  Quest  Answ  Rem  Ima  Ima    Ima
er d Date red ion er ark ge1 ge2 ge2
Time
 Vith  19/09/  4:07  Hand  Confor         
al 2019 PM Rail mity
Gaik section
wad s
Fabrica
ted to
correct
lengths
and
heights
as
require
d for
fixing
from
flight to
flight
and
over
landing
s
 Vith  19/09/  4:07  Wts of  Confor         
al 2019 PM Fabrica mity
Gaik ted
wad Hand
Rail
section
s found
correct
(wt /
sq.m)
as per
dwgs
 Vith  19/09/  4:07  All  Confor         
al 2019 PM section mity
Gaik s and
wad Base
plates
used
within
Fabrica
ted
Hand
Rail
section
s are of
require
d Dia,
Gauge,
Size
and
Shape
as
specifi
ed on
dwgs
 Vith  19/09/  4:07  Horizo  Confor         
al 2019 PM ntal mity
Gaik level,
wad vertical
plumb,
inclinati
ons
and
other
fabricat
ed
shapes
of
section
s found
correct
and as
per
dwg
 Vith  19/09/  4:07  No  Confor         
al 2019 PM defects mity
Gaik like
wad bends,
twists,
local
dents
observ
ed in
membe
rs of
Fabrica
ted
Hand
Railing
section
s
 Vith  19/09/  4:07  All  Confor         
al 2019 PM welds mity
Gaik well
wad ground
ed,
minor
weld
cracks
filled
and no
weld
spatter
observ
ed
anywh
ere
 Vith  19/09/  4:08  Wall  NA         
al 2019 PM Side
Gaik Hand
wad Railing
fixed at
correct
height
from
treads
with
spacin
g of
bracket
s and
saddle
s as
per
dwg.
 Vith  19/09/  4:08  Mid  NA         
al 2019 PM Hand
Gaik Railing
wad fixed to
RCC
Stairca
se
Treads
and
landing
s to
have
correct
height
from
Finishe
d
treads
and
FFL
afterwa
rds as
per
dwg.
 Vith  19/09/  4:08  Any  Confor         
al 2019 PM other mity
Gaik observ
wad ation