Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ETAP

Project: Page: 1
12.6.0H
Location: Date: 06-16-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF1
Filename: Mo Phong HTD 22kV HCT Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

2-3 Line TRU 4 TRU 5 0.60 0.79 0.99

3-4 Line TRU 5 TRU 6 1.15 1.50 1.89

3-5 Line TRU 5 TRU 7 0.98 1.29 1.62

5-6 Line TRU 7 TRU 8 0.52 0.68 0.85

5-10 Line TRU 7 TRU 12 0.55 0.71 0.90

6-7 Line TRU 8 TRU 10 0.52 0.68 0.85

6-8 Line TRU 8 TRU 9 2.02 2.65 3.33

8-9 Line TRU 10 TRU 11 0.65 0.86 1.08

10-11 Line TRU 12 TRU 13 1.36 1.79 2.25

11-12 Line TRU 13 TRU 14 0.93 1.22 1.53

N-1 Line TRU 2 TRU 3 0.60 0.79 0.99

N-2 Line TRU 2 TRU 4 0.27 0.36 0.45

S-N Line TRU 1 TRU 2 0.11 0.14 0.18