PIER CAP

TOP LEVEL
FX

PIER CAP
TOP LEVEL

GROUND
LEVEL GROUND
LEVEL

FOUNDING
LEVEL 446.930

FOUNDING
SECTION A-A LEVEL 446.930

B
NOTES:
SECTION B-B

A A

PLAN B PIER CAP TOP PLAN


CLIENT: AUTHORITY ENGINEER : EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/D1058/ST/PIER/P3/101/SH.1
Development of Six- lane access-controlled highway from Design DIMENSION DETAILS OF PIER , PIER CAP
R1 DEC. 2021 REVISED AS PER AE COMMENTS Chainage 8+130 (near Mohand) to 16+380 Daat kali Tunnel of & PIER FOUNDATION FOR FIX PIER P3 DATE : SEP. 2021 REV: R1
Ganeshpur – Dehradun section of NH-72A in the state of Uttar (MODULE-1)
R0 SEP. 2021 FIRST SUBMISSION DESIGNED DRAWN CHECKED APPROVED
M/S RAM KUMAR CONTRACTOR-BHARAT Pradesh & Uttarakhand under Bharatmala Pariyojana on EPC
REV DATE DESCRIPTION A B C D CONSTRUCTIONS (INDIA)PVT. LTD. (JV) mode (Package-2). AK AK SM AA
SCALE : AS SHOWN PAPER SIZE : A3