Reinforcement Schedule:-: Section C-C T Section D-D
Reinforcement Schedule:-: Section C-C T Section D-D
Reinforcement Schedule:-: Section C-C T Section D-D
A A A A
B B B B
T
D
REINFORCEMENT SCHEDULE:-
SECTION A-A SECTION B-B BAR DIA. SPACING
SHAPE
MARKED (MM) (MM)
C C
L L
PIER FOOTING
PIER SHAFT
PLAN SHOWN SHEAR R/F DETAIL
TYPICAL ETAIL
D INDIACATING ANCHORAGE
T
FOUNDATION PLAN OF LINKS
CLIENT: AUTHORITY ENGINEER : EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/D1058/ST/PIER/P4/101/SH.1
Development of Six- lane access-controlled highway from Design REINFORCEMENT DETAILS OF PIER& PIER
R1 DEC. 2021 REVISED AS PER AE COMMENTS Chainage 8+130 (near Mohand) to 16+380 Daat kali Tunnel of FOUNDATION FOR FREE PIER P4 DATE : SEP. 2021 REV: R1
Ganeshpur – Dehradun section of NH-72A in the state of Uttar (MODULE-1)
R0 SEP. 2021 FIRST SUBMISSION DESIGNED DRAWN CHECKED APPROVED
M/S RAM KUMAR CONTRACTOR-BHARAT Pradesh & Uttarakhand under Bharatmala Pariyojana on EPC
REV DATE DESCRIPTION A B C D CONSTRUCTIONS (INDIA)PVT. LTD. (JV) mode (Package-2). AK AK SM AA