STANDARD OPERATING PROCEDURE

M/S. PRAKRUTI PRODUCTS PVT. LTD.


PROCESS : HYDRO-TEST
DOCUMENT NO: KI/PPPL/SOP/HT/5005/21

S TANDARD OP ERATI NG
P ROC EDUR E
F OR
HYDR O TES T FOR S TORA G E &
D IS TR I BUTI ON TANK S

Submitted To:
M/S. PRAKRUTI PRODUCTS PVT. LTD.

Submitted By:
KOMAL INDUSTRIES
108, CREATIVE IND.CENTER,
12, N.M.JOSHI MARG,
LOWER PAREL (EAST)
MUMBAI – 400011

E-mail: komal@komalwater.com
Website: www.komalwater.com

SOP FOR HYDRO TEST Page 1 of 3


STANDARD OPERATING PROCEDURE
M/S. PRAKRUTI PRODUCTS PVT. LTD.
PROCESS : HYDRO-TEST
DOCUMENT NO: KI/PPPL/SOP/HT/5005/21

SOP FOR HYDROTEST

• Objective
➢ To ensure that the purified water storage & distribution tanks is leakage proof from Nozzle
Joints & Weld Joints.

• Purpose
➢ The purpose of this sop is to provide a guideline for carrying out the Hydrotest for Storage &
Distribution Tanks.

• Reference
➢ Pressure Gauge

• Responsibility
➢ Installed & Executed by Komal Industries
➢ Witnessed by Client

• Procedure for Hydrotest

➢ Hydro-pump & suitable or required range pressure gauge are required for hydro test of RO
system.

➢ Fill the system with water.

➢ Close the SS TC end Blind & also connect the valve.

➢ Connect the hydro-pump at the supply line with suitable or required range pressure gauge.

➢ Pressurize the system up to 1.5 times of design pressure with hydro-pump.

➢ Observe the pressure gauge reading after achieving the required pressure in the system.

➢ Hold this pressure in the system for minimum 1 hour.

➢ Mark this pressure reading in pressure gauge.

SOP FOR HYDRO TEST Page 2 of 3


STANDARD OPERATING PROCEDURE
M/S. PRAKRUTI PRODUCTS PVT. LTD.
PROCESS : HYDRO-TEST
DOCUMENT NO: KI/PPPL/SOP/HT/5005/21
➢ Observe this reading after 1 hour. If this pressure drop down, it means there are leakage then
check this leakage position in System. Rectify this leakage & repeat this same procedure of
hydro-test.

➢ If there is no drop of pressure in pressure gauge, it means hydro test is ok.

NAME DESIGNATION SIGNATURE

Prepared By Mr. Harshal Nikam QA Engineer

Checked By Mr. Sarvesh Baglane QA Engineer

Approved By Mr. Sushant Mohanty QA Head

SOP FOR HYDRO TEST Page 3 of 3