Professional Documents
Culture Documents
Training and Experience Outline: Engineering Council of South Africa
Training and Experience Outline: Engineering Council of South Africa
Consult the enclosed Information Sheet (Sheet AN2) before completing this report.
Period No: Date from: January 1998 to No of weeks: Position held: Design Civil Engineer Degree of
6 To: December 1999 104 Responsibility
E
Employer’s Name and address: Jakoet Consulting Engineers, Did you train under a Commitment Yes
Capetown South Africa and Undertaking (CU)? NO
No
Date:
ECSA Registration No: 880627
Name and purpose of this period of experience
Organogram showing two levels above and below applicant (if present), with individual’s name and ECSA’s
registration category, if required. Identify the applicant’s supervisor
Consultant/Principal Civil
Engineer/Owner
Independent Consultant
To determine the right sections to use for the stability of the structures based on results of structural analysis
To determine the right size and class of pipe for water, wastewater and storm water conveyance.
To determine the pavement materials and thickness required to carry the structural traffic for 20 years.
I used PROKON for the structural analysis of the timber and steel structures.
I used STRAP for the finite element structural analysis of the reinforced concrete structure.
I used TECHNOCARD for the hydraulic analysis and design.
I used TECHNOCARD for the geometric design of the road sections.
I designed the pavement sections in accordance with the South Africa Technical Manual for the Design of
Highways.
I prepared the predesign report as well as the project plans and specifications for the projects listed below:
Symphony Way
Upgrade of Teselaarsdal Road for Provincial Government of Cape-town
Kwanobhule Phase A and B.
Malabar Township Development
Delph Township Development.
I also prepared report for 60-bridge inspections for South Africa National Roads.
I prepared a project schedule before the commencement of the design, these included the resources needed to
complete the design of the projects.
I updated the schedule when it was obvious to change the schedule due to unforeseen events.
I assisted in the management of the contract onsite by approving shop drawings.
Health and safety considerations; hazards and environmental considerations, other legislation
I worked with the environmental consultant to prepare the environmental impact report.
I provided the project description to the environmental consultant
I provided a copy of the pre-design report, project plans and specifications to the environmental consultant.
I was working towards demonstrating competencies in the design of infrastructures for township development.
I was also working towards demonstrating competencies in writing project specifications
I was working towards demonstration competencies in structural analysis and design.