Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

NAMES OF GROUP MEMBERS :

1. ARYA YUSUFA WIDYADANA WAHYU AJI (08.20.004.1.01)


2. CINTIA CHOIRUNNISA HARSONO (08.20.006.2.01)

CLASS : D-IV TROK C

Maritime English

“VHF Communication related to bunker operations”

Barge : -INTENTION. MT. Pertamina, are you ready to bunker? OVER.

Vessel : -ANSWER. Yes I am ready to bunker.

-INFORMATION. I have prepared all safety measures.

-INSTRUCTION. Connect barge hoses. OVER.

Barge : -INFORMATION. Barge hoses are connected.

-QUESTION. What is the pumping pressure? OVER.

Vessel : -ANSWER. The pumping pressure is 3 bars.

-INSTRUCTION. Start pumping slowly. OVER.

Barge : -QUESTION. Are you receiving? OVER.

Vessel : -ANSWER. Yes I am receiving.

-INSTRUCTION. Do not exceed a pressure of bunker line of 3 bars. OVER.

Barge : -INSTRUCTION. Pressure steady at 3 bars. OVER.

Vessel : -INFORMATION. We have reached 90% of tank capacity decreasing


pumping rate. OVER.

Barge : -INFORMATION. I am decreasing pumping rate. OVER.

Vessel : -INFORMATION. 350 tones received.

-INSTRUCTION. Stop pumping disconnected the barge hoses. OVER.

Barge : -INFORMATION. Barge hoses are disconnected OVER.

Vessel : Thank You So Much for Your Help. OUT.

You might also like