PETRONAS TOWER
• LOCATION: Kuala Lumpur, Malaysia
• YEAR(S) OF DESIGN:1991
• Height :427 m
• Floors :88
PETRONAS TOWER
• The twin Towers were the world's tallest buildings, before
being surpassed by the Taipei 101.
PETRONAS TOWER
• Program
Design Development
• The design of the towers responds to its climate and to
formal characteristics of the dominant Islamic culture.
• The towers are figurative and symmetrical and create a
figurative space between them.
• Towers are tapered and set back five times in its ascent.
• The 88‐floor towers are constructed largely of reinforced
PETRONAS TOWER
concrete, with a steel and glass façade designed to
resemble motifs found in Islamic art.
DESIGNDEVELOPMENT
FLOORPLATEDESIGN:
Is based on simple Islamic geometric forms of two
interlocking squares creating a shape of
eight‐pointedstars.
PETRONAS TOWER
The semi‐circles were superimposed inthe inner angles
of the interlocked squares to create more usable floor
space.
TOWER FACT
• Tower One: Petronas Headquarters’ offices.
• Tower Two: Mostly private tenants, KLCC Holdings’ offices, some
vacant areas for rent.
• Height of each tower: 452 meters above street level
• Length of Skybridge: 58.4 meters
• Height of Skybridge : 170 meters.
• The Skybridge is on Level 41.
• Height of each pinnacle: 73.5 meters
• Elevators: 29 double-decker high speed passenger lifts in each tower
• Escalators: 10 in each tower
MATERIALS:
• More than 60 per cent of the materials used in the project were sourced
locally.
PETRONAS TOWER
• The Petronas Towers development marked the first use of high-strength
concrete in Malaysia by local industry, at relatively economic cost.
• Local materials such as Malaysian wood, Terengganu granite, marble
and glass were extensively used.
• The components of the stainless-steel cladding and vision-glass curtain
walls were fabricated locally in Malaysia by a US firm.
ARCHITECTURAL CHARACTER:
• The early scheme for the tower design called for a twelve-
pointed-star floor plan, but this was changed to an eight-
pointed-star floor plan when the prime minister observed
that the former geometry was more Arabic than Malaysian.
• The client decided to add a concert hall to the project on a
third level between the two towers.
• The main entrance to the tower complex and the central
lobby were totally redesigned.
PETRONAS TOWER
• Rationality
SKY BR
PLAN OF THE BUILDING:
PETRONAS TOWER
up to 43th floor above 43th floor
PLAN OF THE BUILDING:
PETRONAS TOWER
CONSTRUCTION
PETRONAS TOWER
ISSUES WHILE CONSTRUCTUON
• ISSUE ONE – THE FOUNDATION SLAB ISSUE TWO – THE WEATHER
If the concrete dried unevenly, the slab would The Malaysian weather is
crack, susceptible to torrential
thus seriously weaken the ability to support the rain, this is also problematic to the
building above. Therefore, they decided to pour slab, as the concrete can get too
the concrete all at the once, scheduling concrete wet, and become ruined. They
trucks to arrive every 2,5 minutes for 52 hours, covered the entire slab with canvas,
without a break the equivalent to 56 circus tents
PETRONAS TOWER
STRUCTURE • SKY BRIDGE
CLADDING • Weighing 750 tons, the double-decker
• A total of 83,500sq m of stainless steel extrusions & skybridge acts as the connector between
55,000sq m of laminated glass were used to clad the two towers on the Level 41 and 42.
the walls and which was that of a "multi-faceted
diamond sparkling in the sun." • Interestingly, the skybridge is not fully
• Designed as a curtain wall exterior, the cladding attached to the main building – engineers
comprised 33,000 panels in all; each panel is as high as deliberately designed the skybridge this
one floor and spans ledge to ledge. way to give allowance for small movements
• Laminated glass was preferred for its safety, sound during high winds and other unpleasant
insulation, durability and solar energy control. It weathers.
also screens out most ultra-violet rays, hence protecting
the interior from sun damage. Like the typical floors, • This prevents the bridge from breaking
cladding was constructed using the four-day cycle away from the towers. The bridge
system. All panels were interlocked and placed in a measures 170m (558 ft) above the
down-upwards position ground and 58.4m (192 ft) long.
PETRONAS TOWER
STRUCTURE
PINNACLE
• Each tower crowned by- 73 m tapering top • The crowning glory to the twin towers were
• Accommodates – building maintenance the pair of 73.5m-high steel pinnacles that
• Machine , aviation lighting and lighting would propel the towers to fame as the
Protection world's tallest building.
• Due to steep sloping column
• Concrete construction impractical
• Steel used throughout
• Lower pinnacle- 8 structural steel frames
• Upper pinnacle – single mast of tapering
Circular
PETRONAS TOWER
BUILDING GEOMETRY A VIEW FROM SPIRE
PETRONAS TOWER
RITZ TOWER 465 PARK AVENUE
• A residential skyscraper in New York city.
• The building's amenities include 12-foot (3.7 m) golf training facilities and private
dining and screening rooms
PLAN
Typical Floor Plan
• At the base, the building meets theground creating a landscaped public space that extends
the feeling of openness of Park Avenue onto 56th Street
• All services and delivery accesses are independently located to the east side of the tower.