Volume of Concrete: 1:2.76:2/33 (1 Cement: 2.76 Coarse Sand: 2.33 Graded Stone Aggregate) (M-20 Grade of Concrete)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Providing and laying in position cement concrete of specified grade excluding the cost of

shuttering & cenetering


1:2.76:2/33 (1 Cement : 2.76 coarse sand : 2.33 graded stone aggregate ) (M-20 Grade of concrete)
Volume of Concrete 1 Cum

Dry mix of about 52 to 54% extra volume(1.52 to 1.54). These extra dry volume will get
balance to 1 Cum after pouring water. 1.54

S.no. Description Quantity Unit Rate Amount


1 Material
Cement 8.00 bag 283.73 2269.84
Aggregate (Distribute in below) 0.84 Cum

Stone Aggregate (20mm) 0.21 Cum 2460.00 516.60


Stone Aggregate (10mm) 0.10 Cum 2460.00 247.97
Coarse Sand 0.420 Cum 1891.12 794.27
2 Carriage of Material
Carriage of Cement 403.2 kg 0 0.00
Carriage of Stone Aggregate below 40mm 0.84 Cum 0 0.00

Carriage of Coarse Sand (Zone III) 0.420 Cum 0 0.00

3 Labour
Mason (coefficient taken from DPR Page 36) 0.86 day 261 224.46
Beldar (coefficient taken from DPR Page 36) 1.5 day 295 442.50
Bhishti (coefficient taken from DPR Page 36) 20 day 242 4840.00
4 Equipments
Hire Charges of Concrete mixer 0.25 to 0.40 Cum with Hooper
6 hour 80 480.00
(coefficient taken from DPR Page 36)
Generator (coefficient taken from DPR Page 36) 6 hour 507 3042.00

Total ₹ 12857.64
Add 1% Water Charges
128.576384

Total ₹ 12986.21
15% Contractor's profit
1947.9322176

Total ₹ 14934.15
1% Labour cess
149.341470016

Total ₹ 15083.49
Grand Total ₹ 15083.49
Say=> 15083.00
Providing and laying in position cement concrete of specified grade excluding th
shuttering & cenetering
1:2.76:2/33 (1 Cement : 2.76 coarse sand : 2.33 graded stone aggregate ) (M-20 Grade of co
Volume of Concrete 1

Dry mix of about 52 to 54% extra volume(1.52 to 1.54). These extra dry volume will get
balance to 1 Cum after pouring water. 1.54

S.no. Description Quantity Unit


1 Material
Cement 6.00 bag
Stone Aggregate (20mm) 0.40 Cum
Stone Aggregate (10mm) 0.36 Cum
Coarse Sand 0.57 Cum
2 Labour
Mason (coefficient taken from DPR Page 36) 0.86 day
Beldar (coefficient taken from DPR Page 36) 1.5 day
Bhishti (coefficient taken from DPR Page 36) 20 day
3 Equipments
Hire Charges of Concrete mixer 0.25 to 0.40 Cum with Hooper
6 hour
(coefficient taken from DPR Page 36)
Generator 33KVA (coefficient taken from DPR Page 36) 6 hour

Total
4 Overhead Charge@0.25 on (1+2+3)

Total (1+2+3+4)
5 Contractors Profit@0.1 on (1+2+3+4)

Grand Total
Say=>
grade excluding the cost of

te ) (M-20 Grade of concrete)


1 Cum

1.54

Rate Amount

283.73 1702.38
2460.00 1404.74
2460.00 876.74
1891.12 1079.89

261 224.46
295 442.50
247 4940.00

80 480.00

507 3042.00

₹ 14192.72

3548.18088966

₹ 17740.90

1774.09044483

₹ 19514.99
Say=> 19515.00
cement
RATIO M20 300:828:653.4+534.6 1.00

CEMENT 1

SAND 2.76

AGGREGATE 3.96

TOTAL 7.72
Material Unit Rate ₹
Cement including Carrige+Loading+Unloading Bag 283.73 Rate as per DPR
Stone Aggregate (20mm) Cum 2460.00 Rate as per DPR (Lead Data)
Stone Aggregate (10mm) Cum 2460.00 Rate as per DPR (Lead Data)
Coarse Sand Cum 1891.120 Rate of Aug'2018 (as per Our Store
Labour
Mason day 261 as per DPR page 36
beldar day 295 as per DPR page 36
Bhisti day 247 as per DPR page 36
Equipment
Hire Charges of Concrete mixer 0.25 to 0.40 Cum with
Hooper (coefficient taken from DPR Page 36)
day 80 as per DPR page 36
Generator (coefficient taken from DPR Page 36) day 507 as per DPR page 36
sand aggregate
2.76 2.33

er DPR (Lead Data)


er DPR (Lead Data)
Aug'2018 (as per Our Store record)

PR page 36
PR page 36
PR page 36

PR page 36

PR page 36