Volume of Concrete: 1:2.76:2/33 (1 Cement: 2.76 Coarse Sand: 2.33 Graded Stone Aggregate) (M-20 Grade of Concrete)
Volume of Concrete: 1:2.76:2/33 (1 Cement: 2.76 Coarse Sand: 2.33 Graded Stone Aggregate) (M-20 Grade of Concrete)
Volume of Concrete: 1:2.76:2/33 (1 Cement: 2.76 Coarse Sand: 2.33 Graded Stone Aggregate) (M-20 Grade of Concrete)
Dry mix of about 52 to 54% extra volume(1.52 to 1.54). These extra dry volume will get
balance to 1 Cum after pouring water. 1.54
3 Labour
Mason (coefficient taken from DPR Page 36) 0.86 day 261 224.46
Beldar (coefficient taken from DPR Page 36) 1.5 day 295 442.50
Bhishti (coefficient taken from DPR Page 36) 20 day 242 4840.00
4 Equipments
Hire Charges of Concrete mixer 0.25 to 0.40 Cum with Hooper
6 hour 80 480.00
(coefficient taken from DPR Page 36)
Generator (coefficient taken from DPR Page 36) 6 hour 507 3042.00
Total ₹ 12857.64
Add 1% Water Charges
128.576384
Total ₹ 12986.21
15% Contractor's profit
1947.9322176
Total ₹ 14934.15
1% Labour cess
149.341470016
Total ₹ 15083.49
Grand Total ₹ 15083.49
Say=> 15083.00
Providing and laying in position cement concrete of specified grade excluding th
shuttering & cenetering
1:2.76:2/33 (1 Cement : 2.76 coarse sand : 2.33 graded stone aggregate ) (M-20 Grade of co
Volume of Concrete 1
Dry mix of about 52 to 54% extra volume(1.52 to 1.54). These extra dry volume will get
balance to 1 Cum after pouring water. 1.54
Total
4 Overhead Charge@0.25 on (1+2+3)
Total (1+2+3+4)
5 Contractors Profit@0.1 on (1+2+3+4)
Grand Total
Say=>
grade excluding the cost of
1.54
Rate Amount
283.73 1702.38
2460.00 1404.74
2460.00 876.74
1891.12 1079.89
261 224.46
295 442.50
247 4940.00
80 480.00
507 3042.00
₹ 14192.72
3548.18088966
₹ 17740.90
1774.09044483
₹ 19514.99
Say=> 19515.00
cement
RATIO M20 300:828:653.4+534.6 1.00
CEMENT 1
SAND 2.76
AGGREGATE 3.96
TOTAL 7.72
Material Unit Rate ₹
Cement including Carrige+Loading+Unloading Bag 283.73 Rate as per DPR
Stone Aggregate (20mm) Cum 2460.00 Rate as per DPR (Lead Data)
Stone Aggregate (10mm) Cum 2460.00 Rate as per DPR (Lead Data)
Coarse Sand Cum 1891.120 Rate of Aug'2018 (as per Our Store
Labour
Mason day 261 as per DPR page 36
beldar day 295 as per DPR page 36
Bhisti day 247 as per DPR page 36
Equipment
Hire Charges of Concrete mixer 0.25 to 0.40 Cum with
Hooper (coefficient taken from DPR Page 36)
day 80 as per DPR page 36
Generator (coefficient taken from DPR Page 36) day 507 as per DPR page 36
sand aggregate
2.76 2.33
PR page 36
PR page 36
PR page 36
PR page 36
PR page 36