PD-PPAIWSP-Design-2021-245-Shop Drawing of Security Hut, Store Room Car ...

You might also like

Download as pdf
Download as pdf
You are on page 1of 4
NATIONAL WATER SUPPLY & DRAINAGE BOARD POLGAHAWELA, POTHUHERA AND ALAWWA. INTERGRATED WATER SUPPLY PROJECT Tel, ; 0372243030 /097 243981 Fae: 037 2245981 Mobil: 070 365177/077 244207 Email: pavpatwsiamallcom My No: PDPPPAIWSP/Design/2021/245 ‘on vezi “The Project Director Mis Vatech Wabag Lad Dea Si Polgahaweta, Pathulera and Alawwa Water Supply Project ‘Contrast No: SP-NWPPOLGAHAWELA/W/DB20101 Subject! Submission of Shop Drawing of Security Hut, Storeroom, Car Park and Washroom at Area Engineers Office, Polgahawela (Rev 2) Reference: 01. WABSL/I0PI04/SG/PD/2020/4684 slated 08" October 2020, (02, PDIPFAIWSP/Desiga/2020/239, dated 22" October 2020 (3, WABISL/T0P104/SG/PD/2021/8666, dated 02" June 2021 (04, PD/PFAIWSP/Desiga/2021/141, dated 18% June 2021 (05, WABSL/10P104/SG/PD/2021/6278, dated 22"! October 2021 This refers to the above subject and reference leters Please fl dhe ER's comments mentioned inthe table attached herewith and incorporate tiem inthe next submission fr further considerations. *Please noe that the Design and Build Contractor is responsible forthe conformity ofthe design with ‘unetional requirements meeting Employer's Requirements, Specifications, and standards This is for your reference & immediate stions please Thank You ofly ng.@.M Thiakarathne Projet Dieector (PPAIVSE) Enel List of Comments Prost Distr Polgaavel,Pothshers nd Alawwa ltgrzed Water Supply Project "No 301, Kurnegale Road, Bandas, olgaawela. st] NWSDBCommentson | Wabag Reply on oe ee No. Revision | Revision | ete een A. | Key Plan ‘Comply the comments given in on [ eter oo dated 21% August 2020 [Noted and updated | Worker's rest oom shall be included in the key lan. «9, | Suomi the Key plan complying With the previous comments i “The sloreroom has sified to the back Rest room for workers sll be side of the pipe yard, but workers rest 3. | [ocated backside of pipe yard | NOt4 And updated | om has not included in the key Please include Provide sufficient space Please mention he distances clearly and (4, | between pipe yard and store | Noted and updated enna bailing mark inthe lan ‘Store Building- Locaton of entrance (Door) and fnlght os, | entrance (Door) and nll | Noted and updeted | Not mentioned the key plan B | car Park ‘80mm Gl pipe shall be of Heavy ' fe Cans [Noted and updated | Noted. Gauge of Z¥/AI Roof Shoot shall re een [Noted and updated | Noted. Zn (Al Valance Board, Barge (08. | Board, Gutter & Down Pipe | Noted and updated | Not mentioned with gauge shal be included © | Security Room Height of the D2 ype doors (09, | should be corrected in Schedule | Noted and updated. | Noted. ‘of Doors and Windows a ie Potgshavel,Pohuhers and Alawoea lesegeazd Water Supply Project "No 301, Kurungala Road, Banda, Polgaswela FFL. of the Bathrooms & ‘mentioned inthe key plan 10, | Stower" area — should” be |Notedand updated | Now. mentioned in the daving os : The view ofthe Aluminum frame with Theres an comet window | ined lass window is drawn incomes | ypementoned in “Elevation 8” | Noted and updated | sad glass window id tly, a aia The view ofthe Alumina Feame with 12, | ere ian incorrect window | Noted and updated | fined glass sliding window is drawn ‘Ypemenioned in-Elevaton A pdated | red las ting wind Sill height of the “"W2" type '3. | window salle provided "| NOt’ and updated) Noted Sill height of the “VI ype Aluminum ventilator hasbeen changed | | 4 | window shall be provided "| Noted andumdsted oan Exhaus: Fan) Dimension of footing layout | 03 and upd 45. | sal be mentioned | Diaedeedeesete [tee " Sunshde shal Be provided oa 16, |ongih of the from side of Notanduplated | Nowed secuiy rom. D Washroom Jn column dts, lp length sh shouldbe mention eee “ota lap eth should be mentioned ; | Ventilaons fave been changed i, | sii fenton sha be ntti ower evel so — a | een india Please indicate Sunshade shall be provided total 19. flength of the font side" of | Notdand updated | Nowd secuity room | lease Be nad that as pr the Contact Agreement, the storeroom should be theta Tocted in the upstais of the Arca Engineer's fice bulding. F [sure Detaled draings for the store shal be 2. | storeaea enae eatin of entranes (Doon and ae ya 23, | fanight with sizes. shall be | Noted and updaed_| NOt menonsd in he Kay plan Ps mention in the drawing Pipe Vard rojas Dirsior Polgahewela, Pothuera and Alawwa lcegrated Water Supply Project "No 30, Kurunegala Road, Bandawa, Polgthawel Sizeorthepipe yard (6mxm is not sulficiet since actual siz oF ‘As pe the Contract, conly haveto relocate the existing ioe | There was a large pipe yard at the place alent since stu S250 | erg Exiting pe [and it was. demolished "for your 24. | the pipe ism. We propose Si yard is mdm. A | construction. Therefore, build a Zmxsm eae per the conrat| sz pipe yard wipe yard size is provided : oe eS hig, | RAMP shall included and drawn inshe 25, | Ramp stall be iced Noted and upd | Ramps “Thickness ofthe Moor concrete | APE CORE | However, when using pipes (DUPYC) so, | salle minimum of 150mm |" BPE Ya" 22 oy hick coer cat eause damage and enforced win Gt mean | EEPTNEE OF | iy, Tate, reine (Ro) concrete is equired provide. ‘As per the cont, pee ‘onl pipe yard ares | We have to hand over this bung 10 ay, | ule, Nor nish sal be |O0 Meied or |te_ mainte soon Tei, sti 75 thk screed willbe | basic requirements should be met. povided. an, [agi sa bee D9] tant ape | Now ss, [Guacar2antRor shes dan del | Na Zn IAI Valance Board, Barge] | 30, | Board, Guter & Down Pips | Not and updated | Not mentioned. with gauge sal be included sas lade the workers es rooms in H_| Rest rooms for workers the Key Plan and submit separate deta ravings inthe nxt submission 1 | Common 31 “Approval for materials for all doors and windows. shall be obsained Material separate approval rot | Noted Polgahawola, Pthuhe and rt iior lwo Integrated Water Supply Prooct. 'No30, Kurunegala Road, Bandawa, Poeshawela

You might also like