Devchand Engineers Pvt. LTD: Equipment Description: Equipment Tag No: Drawing Reference
Devchand Engineers Pvt. LTD: Equipment Description: Equipment Tag No: Drawing Reference
LTD
Works: A-4/5, Sachin Udyog Nagar Sahakari Mandli Ltd., opp: Village - Vanz Dandi Road, Sachin, Dist: Surat 394230
EQUIPMENT DESCRIPTION: VACUUM BUFFER TANK
EQUIPMENT TAG NO: V-2105 Job No : DEPL-U-001
DRAWING REFERENCE: DEPL-U-021-001_R0 Page 10
Document No : DEPL-U-DSG-001
RADIOGRAPHY REQUIREMENTS - as per UW-11 Revision No : 0
Code Clauses Description Applicability RT
Are the butt welds in vessels in which the nominal thickness exceeds 38
UW-11(a)(2) No NONE
mm. UCS-57
Is butt welds in the shell and heads of unfired steam boilers having design
UW-11(a)(3) No NONE
pressures exceeding 50 psi (350 kPa)
Are category A and B butt welds in vessel sections and heads where the
UW-11(a)(5) design of the joint or part is based on a joint efficiency permitted by UW- Yes RT1
12(a) and are of type (1) or (2) as per table UW - 12
Are Category B and C butt welds [ Excluding those or nozzles that neither
exceeds 250 NB nor 29 mm thickness ] which intersect the Category A
UW-11(a)(5)(b) butt welds in vessel sections or heads or connect seamless vessel No NONE
sections or heads shall, as a minimum, meet the requirements for spot
radiography in accordance with UW-52.
All butt welds joined by electro gas welding with any single pass greater
UW-11(a)(6) No NONE
than 1 1/2 in, (38 mm) and all butt welds joined by electro slag welding
Conclusion:
AS ABOVE CONDITIONS IS APPLICABLE, FULL RT IS NOT REQUIRED FOR WHOLE VESSEL
ALSO FULL RT IS PROVIDED AS PER CUSTOMER'S REQUIREMENT.
RADIOGRAPHY FOR EQUIPMENT = FULL (UW-11(a) AND UW-51)
MARKING ON NAME PLATE = RT1 (AS PER UG-116)
Adopted Radiography