Routine Maintenance Schedule Work
Routine Maintenance Schedule Work
ACCUMULATIVE NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT
Item No. Description Of Works Unit BQ Quantity WORKDONE to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th
DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV
c) Berm drain, interceptor drain and all other types of drain on as at site
slopes
d) Median as at site
9.2.2 Road Furnitures
a) The works shall comprise of cleaning works and shall be carried cycle 2 3 1 1 1
(out 4 cycles/year
including supply of skylift to clean gantry signboard
surface and of
i) Cleaning large signage
guardrails andsurface
barriers) as at site
ii) Cleaning of signages and posts as at site
iii) Cleaning of kilometer post and delineator post as at site
iv) Cleaning of traffic signal aspects as at site
ACCUMULATIVE NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT
Item No. Description Of Works Unit BQ Quantity WORKDONE to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th
DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV
2 Surface cleaning
i) Cleaning of expansion joints
ii) Cleaning of weep holes
iii) Cleaning of parapets cycle 2 3 1 1 1
v) Cleaning of grafiti and markings
vi) Cleaning of bridge carriageway
vii) Cleaning and removal of vegetation
b) The works shall comprise of repainting works and shall be carried cycle N/A
out 1 year/cycle
i) Repainting of Concrete Parapets
9.2.5 Drainage
a) The works shall comprise of cleaning and desilting works and cycle 2 3 1 1 1
shall be carried out 4 cycles/year
# ( including cut grass, shrub, small plant, tree etc and
remove
i) Debris debris from
in lined site and minimum application of
drains
HERBICIDES to narrow
ii) Debris in unlined drainsand complication area )
iii) Debris in sumps
iv) Debris in culverts
v) Cleaning of waterway or culvert opening
ACCUMULATIVE NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT
Item No. Description Of Works Unit BQ Quantity WORKDONE to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th to 22th
DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAC APR MAY JUN JUL AUG SEP OCT NOV
Litter Collection
a) Litter collection and disposal and shall be carried out as and when
required.
b) Removal and disposal of loose material and debris as and when
required.
c) Removal and disposal of carcass as and when required.
#
To clear and remove from site any sediment ( sand, earth ) ,
loose quarry aggregate, chipping from at pavement surface
( curve area, weep hole area, NJB drain opening, junction,
intersection and any place at site )