Additional Comments on Conceptual Design
Project Name: Orinoco Utility PDVSA
TEC Work No. (BC-019200) Group: _Mechanical Engineering PM: Hata PM LAE:K.Takeshita
6 Supply steam to users such as upgraders and air compressor is regulated Supply steam to users should normally not be regulated. No PCV
by PCV to keep upstream pressure. is required. For steam header pressure control, refer to par. 2.2 in
Final report.
7 Control of HP and LP steam header is not shown. For steam header pressure control, refer to par. 2.2 in Final
report.
2/3
567275425.doc (20100401)
Additional Comments on Conceptual Design
Project Name: Orinoco Utility PDVSA
TEC Work No. (BC-019200) Group: _Mechanical Engineering PM: Hata PM LAE:K.Takeshita
14 8.1 Furthermore, we expect the quality of return water to be the same as Quality of return water will be approx. 5 times of raw water ion
shown in Table 2, which refers to the quality of industrial water. content because concentration number of 5 is planned.
- Chlorination
- Sodium bicarbonate
- Non-oxidizing biocide
3/3