Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

3

1.
3.
T.
OUTER COLONY DRAINAGE SYSTEM
PROCESS DRAINAGE SYSTEM 2 1 .4
3.
T.

T.3.4.5
5
T. 1.
3. 3.

4
T.

4.
4.

3.
7

T.
T.3.4.1
6
1.
3.
4.
2 T.
3.
T.

T.3.3.1
.6
.3 3 .4
4 T. .7
3. .1
T. 3
T.

S.3. .8

S.
3 .1

3.
3
T.

4
T.
3.
T. 2.
3. 2
5.
2. .2
1 .1
T. 3
3.
2. T.
1

T.3.5.2
3
T.3.1 1.1.
T. .1 T.3.
3. 2
3.1 1.1.

S.
5. S. T.3.

3.
1

2
T.3.1
.1.1

P3
S.3.5

SAMPIT 2

PIPE TO BOX CULVERT P2


INNER COLONY DRAINAGE SYSTEM
INNER COLONY DRAINAGE SYSTEM PROCESS DRAINAGE SYSTEM 1

S.2.2
T.1.2.2.1
T.1.1.2

S.
2.
T.1.2 5
.2
T.1.1.1
S. .2
T.1.1.3 .1 2. T.2.1
T.1.2 4
T.1.2.4

S. .1
S.1.1

2.
3 T.2.1
S.1.2

T.1.2
.3
SPT S.2.1
SAMPIT 1

P1
P2
P

TOTAL WT.
MAT. QTY.
IN Kgs.
DESIGN
D DRAWN
EFFLUENT DRAINAGE NETWORK (1/2) CHECKED
C INDO BHARAT RAYON APPROVED
DATE -
B REF. F.NO: SCALE : -

DRAINAGE NETWORK
INDO-BHARAT RAYON
DRG. N0. REV.
A PT. INDO BHARAT RAYON
( PURWAKARTA - INDONESIA ) -
REVIION SIGN. DATE ADITYA BIRLA GROUP
PROJECTION

You might also like