Professional Documents
Culture Documents
Seq#10-DeT-41 & 42 Matrix Response
Seq#10-DeT-41 & 42 Matrix Response
(TYP) (TYP)
DET-42
(TYP) DET-43
B25 (TYP)
We considared Note-4 loads only
where mentioned "SEE NOTE 4"
at W10/MC10 beams.
DCN-031
3728
10-04-21
h a n g e Vi h a n g e Vi
XC e XC e
F- w F- w
PD
PD
er
er
!
!
W
W
O
O
N
N
y
y
bu
bu
DESCONBRACE-LRFD-AISC14 7.0.16 Licensed to: iCAD Engineering-- Page: 1
to
to
k
k
MAGNA LNG FACILITY-APPENDIX-F-DET-41
lic
lic
C
C
w
w
m
m
w w
w
w
o
o
.d o .c .d o .c
c u -tr a c k c u -tr a c k
BASIC DESIGN DATA Maximum Length of Clip Angle = 8 > 5.5 in. (OK)
In actual this is beam to girder
Non-Seismic Design connection here it is simulated as Try 2L3X3X3/8
Column: beam to column in Descon
Size: W10X39 Bolt Bearing on Angle OSL
Material: A992
Orientation: Web Out of Plane Bearing Strength/Bolt/Thickness Using Bolt Edge Distance = Fbre
Axial Force (Tension): 50 kips Edge Dist. = 1.25 in., Hole Size = 0.8125 in.
Axial Force (Compression): 50 kips = 0.75 * 1.2 * Lc * Fu < 0.75 * 2.4 * d * Fu = 87.75 kips/in.
Shear Force: 0 kips = 0.75 * 1.2 * 0.8438 * 65 = 49.359 kips/in.
Bearing Strength/Bolt/Thickness Using Bolt Spacing = Fbs
Right Side Beam: Here C beam is simulated as Bolt Spacing = 3 in., Hole Size = 0.8125 in.
Size: W10X49 W beam in Descon = 0.75 * 1.2 * Lc * Fu < 0.75 * 2.4 * d * Fu = 87.75 kips/in.
Material: A992 = 0.75 * 1.2 * 2.1875 * 65 = 128. kips/in.
Axial Force (Tension): 0 kips Use: Fbs = 87.75 kips/in.
Axial Force (Compression): 0 kips
Shear Force: 70 kips axial 10K, Bearing Capacity = BrCap
= 2 * (Fbe + Fbs * (n - 1)) * t
Work Point X: 0 in.
Work Point Y: 0 in.
weak axis shear: = 2 * (49.359 + 87.75 * (2 - 1)) * 0.375
15k = 102.8 kips > 70 kips (OK)
Clip Angles:
Length: 5.5 in. Shear Yielding of Angles:
OSL: 3 in.
Material: A572-50 Clip Angle Length = La
Bolts: 3/4"Ø A325-N -STD = (n-1)*s + 2*e
Bolt Spacing: 3 in. = (2 - 1) * 3 +2 * 1.25
Bolt Edge Distance: 1.25 in. = 5.5 in.
(2) 3/4"Ø A325-N -STD Bolts Agt = et * t = 1.25 * 0.375 = 0.4688 in2
Number of Bolts Required = n ØRn = 0.75 * (0.6 * Min(Fu * Anv;Fy * Agv) + Ubs * Fu * Ant)
= V/(0.75*Fv*Ab) = 0.75 * (0.6*Min(65 * 1.1016; 50 * 1.5938) + 1 * 65 * 0.3047)
= 35/ (0.75*54 * 0.4418) = 47.074 > 35 kips (OK)
= 1.9561, Use 2 Bolts
Angle OSL Tension Strength:
Nominal Tension Strength per Bolt = rn
= (a-b*V/(N*Ab))*Ab < Ft*Ab Gage, g = 4 in. (OK)
= (117 - 2.5 * 35 / (2 * 0.4418)) * 0.4418 <
39.761 Bolt Distance to Back of the Angle Minus Half Thickness = b
= 7.939 kips = (g-th)/2 - t/2
= (4 - 0.34)/2 - 0.1875
Design Strength per Bolt, Ørn = 0.75*rn = 5.9543 kips = 1.6425 in.
PD
er
er
!
!
W
W
O
O
N
N
y
y
bu
bu
DESCONBRACE-LRFD-AISC14 7.0.16 Licensed to: iCAD Engineering-- Page: 1
to
to
k
k
MAGNA LNG FACILITY-APPENDIX-F-DET-42-PART-1
lic
lic
C
C
w
w
m
m
w w
w
w
o
o
.d o .c .d o .c
c u -tr a c k c u -tr a c k
BASIC DESIGN DATA Maximum Length of Clip Angle = 8 > 5.5 in. (OK)
In actual this is beam to girder
Non-Seismic Design connection here it is simulated as Try 2L3X3X3/8
Column: beam to column in Descon
Size: W10X39 Bolt Bearing on Angle OSL
Material: A992
Orientation: Web Out of Plane Bearing Strength/Bolt/Thickness Using Bolt Edge Distance = Fbre
Axial Force (Tension): 50 kips Edge Dist. = 1.25 in., Hole Size = 0.8125 in.
Axial Force (Compression): 50 kips = 0.75 * 1.2 * Lc * Fu < 0.75 * 2.4 * d * Fu = 87.75 kips/in.
Shear Force: 0 kips = 0.75 * 1.2 * 0.8438 * 65 = 49.359 kips/in.
Bearing Strength/Bolt/Thickness Using Bolt Spacing = Fbs
Right Side Beam: Here C beam is simulated as Bolt Spacing = 3 in., Hole Size = 0.8125 in.
Size: W10X49 W beam in Descon = 0.75 * 1.2 * Lc * Fu < 0.75 * 2.4 * d * Fu = 87.75 kips/in.
Material: A992 = 0.75 * 1.2 * 2.1875 * 65 = 128. kips/in.
Axial Force (Tension): 0 kips Use: Fbs = 87.75 kips/in.
Axial Force (Compression): 0 kips
Shear Force: 70 kips Bearing Capacity = BrCap
Work Point X: 0 in. = 2 * (Fbe + Fbs * (n - 1)) * t
Work Point Y: 0 in. axial 10K, = 2 * (49.359 + 87.75 * (2 - 1)) * 0.375
= 102.8 kips > 70 kips (OK)
weak axis shear:
Clip Angles:
Length: 5.5 in. 15k Shear Yielding of Angles:
OSL: 3 in.
Material: A572-50 Clip Angle Length = La
Bolts: 3/4"Ø A325-N -STD = (n-1)*s + 2*e
Bolt Spacing: 3 in. = (2 - 1) * 3 +2 * 1.25
Bolt Edge Distance: 1.25 in. = 5.5 in.
(2) 3/4"Ø A325-N -STD Bolts Agt = et * t = 1.25 * 0.375 = 0.4688 in2
Number of Bolts Required = n ØRn = 0.75 * (0.6 * Min(Fu * Anv;Fy * Agv) + Ubs * Fu * Ant)
= V/(0.75*Fv*Ab) = 0.75 * (0.6*Min(65 * 1.1016; 50 * 1.5938) + 1 * 65 * 0.3047)
= 35/ (0.75*54 * 0.4418) = 47.074 > 35 kips (OK)
= 1.9561, Use 2 Bolts
Angle OSL Tension Strength:
Nominal Tension Strength per Bolt = rn
= (a-b*V/(N*Ab))*Ab < Ft*Ab Gage, g = 4 in. (OK)
= (117 - 2.5 * 35 / (2 * 0.4418)) * 0.4418 <
39.761 Bolt Distance to Back of the Angle Minus Half Thickness = b
= 7.939 kips = (g-th)/2 - t/2
= (4 - 0.34)/2 - 0.1875
Design Strength per Bolt, Ørn = 0.75*rn = 5.9543 kips = 1.6425 in.
PD
er
er
!
!
W
W
O
O
N
N
y
y
bu
bu
to
to
k
k
lic
lic
C
C
w
w
m
m
w w
w
w
o
o
.d o .c .d o .c
c u -tr a c k c u -tr a c k